• 제목/요약/키워드: Bid-rigging

검색결과 13건 처리시간 0.018초

공공공사 기술형 입찰에서의 낙찰가격에 미치는 요인 분석 (Analysis of Factors Affecting Successful Bid Price in Public Construction Technical Bidding)

  • 이정웅;이성욱
    • 아태비즈니스연구
    • /
    • 제13권1호
    • /
    • pp.213-230
    • /
    • 2022
  • Purpose - The purpose of this study is to find out any potential factors for explanatory variables when calculating the virtual successful bid rate in case of no collusion. Design/methodology/approach - An empirical analysis was conducted in this study with a regression analysis that included 725 bid samples under the public construction technical type bidding. Findings - The result of the basic analysis showed that there are several factors affecting the successful bid rate. First, collusion variable; second, government variable; third, successful bidder design score variable and the number of bidder variable among bidding features; fourth, turnkey variable based on the alternative method; fifth, civil works variable and plant works variable based on building work; sixth, asset variable and the fourth-quarter performance difference variable. However, the technical proposal method variable among bidding features was found to be statistically insignificant in column(4). Research implications or Originality - The significance of this research is that new variable such as the government variable and the fourth-quarter performance difference variable were added in the regression model, which showed statistically significant research results.

일제강점기 대구의 토목건축청부업자에 관한 연구 (A Study on Construction Contractors in Daegu During the Japanese Colonial Rule)

  • 이진현
    • 건축역사연구
    • /
    • 제19권6호
    • /
    • pp.173-186
    • /
    • 2010
  • This article is about the study on construction contractors in Daegu during the Japanese Colonial Rule. The first construction contractors who involved with Kyong-bu railroad work in 1904 personally. But, after they go through the bidding method, changed by the Japanese Government General of Korea in 1922, and the second bid rigging in 1932, contractors was changed gradually the organization into unlimited partnership, limited partnership or stock corporation. The number of them was increased. Most contractors were Japanese, and organized a limited partnership which has been capitalized at 30,000 won. On the other hand, Korean contractors couldn't work at an important part, except for the personal activities of Youngsil Lee(李永實). They were usually employed as consultants or field deputies by Japanese contractors. After the Liberation, Japanese construction contractors returned to Japan, however Tatuoka-kumi(龍岡組), Yasiro-kumi(屋代組) and Sakano-kumi(坂野組) that was leading the business which were took over by Koreans. They were leading architecture field in Daegu.

공공 건설공사 발주방식에 따른 비용성과 비교연구 (Comparison of Cost Performance for Delivery Methods on Public Construction Projects)

  • 이유섭;강태경;신은영;박원영
    • 대한토목학회논문집
    • /
    • 제33권6호
    • /
    • pp.2575-2582
    • /
    • 2013
  • 공공건설공사 발주제도 운영에 있어 기술경쟁을 지향하는 턴키 및 대안방식 등 설계 시공일괄방식의 경우, 시설물의 품질향상 및 건설기술 발전에 기여하였음에도 불구, 계약되는 공사비가 설계 시공 분리발주방식을 적용하는 공사보다 높아 예산낭비 우려가 있다는 지적과 함께 수주독점, 입찰담합, 심의비리 등의 문제가 쟁점이 되고 있다. 그러나 실제 발주방식별 사업성과와 효과에 대해 정밀 비교분석한 사례가 없는 실정이며, 단순히 낙찰률 등 사업의 한정된 일반적 정보만으로 사업효과를 논의하고 판단하는 것은 자칫 오류를 범할 우려가 있다. 이에 공공 건설공사를 대상으로 계약에서 준공에 이르기까지 실제 집행한 공사비 자료를 광범위하게 조사하여 비용의 투입구조 및 변동추세 등 발주방식별 특성을 비교분석하고 공공건설공사 발주제도의 올바른 이해와 효율적 운영을 도모하고자 한다.