• Title/Summary/Keyword: Benefit to cost ratio

Search Result 286, Processing Time 0.032 seconds

Direct Economic Effects and Optimal Vessel Reduction Scales in Coastal and Offshore Fisheries (연근해어업 어선감척 적정 목표량 산정 및 감척효과 분석)

  • SHIN, Yong-Min;KIM, Jin-Sang;LEE, Jeong-Min;NAM, Jong-Oh
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.27 no.3
    • /
    • pp.821-832
    • /
    • 2015
  • The aims of this study are to estimate the optimal vessel reduction scales and these direct economic effects of coastal and offshore fisheries in the Republic of Korea. To estimate respectively optimal fishing efforts of individual fishery by species in coastal and offshore fisheries, we adopted appropriate fishing power of each species published by National Fisheries Research and Development Institute and also considered biological and socio-economic factors such as the bycatch rate, the profit rate, the efficiency of resource use, the average age of fishing vessel, the intention of vessel reduction, and the annual changes in vessels by other factors. The direct economic effects of the optimal vessel reduction in coastal and offshore fisheries based on maximum sustainable yield and 2/3 maximum sustainable yield was calculated by a cost-benefit analysis. This study showed that optimal reduction numbers of vessels engaged in coastal and offshore fisheries were 4,431 and 374 vessels and the direct economic effects in coastal and offshore fisheries were about 371.7 and 569.4 billion won and these NPV and BCR were 111.7 billion won and 1.65 and 342.6 billion won and 4.97 respectively.

Preliminary ALARA residual radioactivity levels for Kori-1 decommissioning and analysis of results and effects of remediation area

  • Seo, Hyung-Woo;Yu, Ji-Hwan;Kim, Gi-Lim;Son, Jin-Won
    • Nuclear Engineering and Technology
    • /
    • v.54 no.3
    • /
    • pp.1136-1144
    • /
    • 2022
  • The effects of nearby residents and the public by the residual contamination from the decommissioning of nuclear facilities should comply with the dose criteria, and whether additional remediation action is necessary from the ALARA perspective must be determined. Therefore, we analyzed the requirements of ALARA action levels and performed preliminary ALARA evaluation. The ratio of residual contamination concentration to DCGL was calculated for the basement fill and the building occupancy mode. The results showed that the additional remediation actions below DCGL are not justified. In addition, we analyzed the effect of remediation area. It was noted that the increase of the remediation area showed a positive correlation with the Conc/DCGL value in the basement fill mode. On the other hand, in the building occupancy mode, since the floor area of the building is the target of remediation and has the effect of increasing the same as the evaluation area of the building occupants, but due to the difference in the amount of increase, the Conc/DCGL showed a negative correlation. We expect the approach and method of ALARA evaluation can be utilized for concrete cost-benefit calculation during the decommissioning or at the time of remediation.

Estimation for the Economic Benefit of weather modification (Precipitation Enhancement and Fog Dissipation) (기상조절(인공강우와 안개저감)의 경제적 가치 추정 연구)

  • Lee, Chulkyu;Chang, Ki-Ho;Cha, Joo-Wan;Jung, Jae-Won;Jeong, Jin-Yim;Yang, Ha-Young;Seo, Sung-Kyu;Bae, Jin-Young;Kang, Sun-Young;Choi, Young-Jean;Cho, Ha-Man;Choi, Chee-Young
    • Atmosphere
    • /
    • v.20 no.2
    • /
    • pp.187-194
    • /
    • 2010
  • We estimate the economic benefit of weather modification (precipitation enhancement and fog dissipation) by assuming its operation for the considered regions. Based on the statistical data, the economic benefit of the virtually operational precipitation enhancement experiments for the Andong and Imha basins, where the natural precipitation is relatively lack in South Korea, is calculated 348 for the water resources, 22,458 for forest fire prevention, and 28,458 million won/year for the drought relief. The benefit of the fog dissipation operation for the Incheon International Airport is estimated 7,365 million won/year for the flight delay due to fog. The calculated ratio of benefit to cost for precipitation enhancement operation for the basins is 14.07, which is comparable to that conducted in other countries.

Development of safety-Based Guidelines for Cost-Effective Utility Pole Treatment along Highway Rights-of-Way

  • 김정현
    • Proceedings of the KOR-KST Conference
    • /
    • 1997.12a
    • /
    • pp.33-69
    • /
    • 1997
  • This study was conducted to develop a methodology to predict utility pole accident rates and to evaluate cost-effectiveness for safety improvement for utility pole accidents. The utility pole accident rate prediction model was based on the encroachment rate approach introduced in the Transportation Research Board Special Report 214. The utility pole accident rate on a section of highway depends on the roadside encroachment rate and the lateral extent of encroachment. The encroachment rate is influenced by the horizontal and vertical alignment of the highway as well as traffic volume and mean speed. The lateral extent of encroachment is affected by the horizontal and vertical alignment, the mean speed and the roadside slope. An analytical method to generate the probability distribution function for the lateral extent of encroachment was developed for six kinds of encroachment types by the horizontal alignment and encroachment direction. The encroachment rate was calibrated with the information on highway and roadside conditions and the utility pole accident records collected on the sections of 55mph speed limit of the State Trunk Highway 12 in Wisconsin. The encroachment rate on a tangent segment was calibrated as a function of traffic volume with the actual average utility pole accident rates by traffic volume strategies. The adjustment factors for horizontal and vertical alignment were then derived by comparing the actual average utility pole accident rates to the estimations from the model calibrated for tangent and level sections. A computerized benefit-cost analysis procedure was then developed as a means of evaluating alternative countermeasures. The program calculates the benefit-cost ratio and the percent of reduction of utility pole accidents resulting from the implementation of a safety improvement. This program can be used to develop safety improvement: alternatives for utility pole accidents when a predetermined performance level is specified.

  • PDF

Development of safety-Based Guidelines for Cost-Effective Utility Pole Treatment along Highway Rights-of-way

  • 김정현
    • Proceedings of the KOR-KST Conference
    • /
    • 1997.12b
    • /
    • pp.35-72
    • /
    • 1997
  • This study was conducted to develop a methodology to predict utility pole accident rates and to evaluate cost-effectiveness for safety improvement for utility pole accidents. The utility pole accident rate prediction model was based on the encroachment rate approach introduced in the Transportation Research Board special Report 214. The utility pole accident rate on a section of highway depends on the roadside encroachment rate and the lateral extent of encroachment. The encroachment rate is influenced by the horizontal and vertical alignment of the highway as well as traffic volume and mean speed. The lateral extent of encroachment is affected by the horizontal and vertical alignment, the mean speed and the roadside slope. An analytical method to generate the probability distribution function for the lateral extent of encroachment was developed for six kinds of encroachment types by the horizontal alignment and encroachment direction. The encroachment rate was calibrated with the information on highway and roadside conditions and the utility pole accident records collected on the sections of 55mph speed limit of the State Trunk Highway 12 in Wisconsin. The encroachment rate on tangent segment was calibrated as a function of traffic volume with the actual average utility pole accident rates by traffic volume strategies. The adjustment factors for horizontal and vertical alignment were when derived by comparing the actual average utility pole accident rates to the estimations from the model calibrated for tangent and level sections. A computerized benefit-cost analysis procedure was then developed as a means of evaluating alternative countermeasures. The program calculates the benefit-cost ratio and the percent of reduction of utility pole accidents resulting from the implementation of a safety improvement. This program can be used to develop safety improvement alternatives for utility pole accidents when a predetermined performance level is specified.

  • PDF

Effectiveness Analysis of Phosphorescent Pavement Markings for Improving Visibility and Design Standards: Focusing on Expressway Accident Hot Spots (축광노면표시 시인성 및 설치규격개선 효과분석: 고속도로 사고다발구간을 중심으로)

  • Yi, Yongju;Lee, Myunghwan;Choi, Keechoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.685-694
    • /
    • 2016
  • Visibility of lane marking is impaired at night, or in case of rain, and thereby threatens traffic safety. Recently, various studies and technology have been developed to improve lane marking visibility, such as the extension of lane marking life expectancy (up to 1.5 times), improvement of lane marking equipment, improvement of lane marking visibility (32.7%) by applying phosphorescent material mixed paint, and expressway lane design standards alternative (length 6m, gap 12m, width 13cm: 27.8% of painted surface are reduced) adoption with ergonomic analysis. In this study, a set of cost-benefit analyses was performed for the cases where such techniques were applied. Based on the literature review, 26.9% of traffic accidents would be prevented by improving lane marking visibility by 32.7%; accident reduction benefit was calculated as much as 12.5 billion KRW. Meanwhile, total increased cost when introducing phosphorescent material mixed paint and lane design standards alternative is calculated as 30.6 billion KRW. However, economic feasibility could not be secured with 0.41 of cost-benefit ratio when applied to the expressway network as a whole. Additionally, cost-benefit (B/C) analysis was applied to each of the top 20 night accident hot spots and the results of B/C ratios were between 0.67 and 4.20, showing that 11 out of 20 spot sections of expressway can have economic feasibility. This results indicate, with this kind of pavement marking applied to accident hot spots in rural expressway, better visibility and economic feasibility can be guaranteed through traffic accident reduction. Some limitations and future research agenda have also been discussed.

Benefit Cost Analysis on Mitigation of Environmental Impacts Using Contingent Valuation Method : The Kwangyang Habor Case (환경저감화 시설에 대한 비용편인분석 : 광양만 사례연구)

  • Kang, Hee Yong;Jung, Seung Jin;Kim, Kyu Han;Pyun, Chong Kun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.2B
    • /
    • pp.217-223
    • /
    • 2006
  • This study is to investigate the effect of environmental mitigation in relation to the construction of quay structures for containers and to estimate economic values of environment-friendly structures using CVM. The result shows that the B/C ratio of environment-friendly quay structures designed to mitigate environmental impact is 4. That is, environmental improvement work proves to generate environmental benefit over 4 times as much as the construction cost. Considering the results of the study, environmental improvement work is of great benefit to citizens, and CVM is expected to become an efficient method to measure a proper size for a large construction project as well as to forge public consensus.

ECONOMICS OF MILK PRODUCTION IN DHAKA DISTRICT-A CASE FOR SAVAR THANA

  • Sayeed, M.A.;Rahman, S.M.A.;Alam, J.;Begum, J.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.7 no.1
    • /
    • pp.49-55
    • /
    • 1994
  • This study was conducted to compare the of rearing native and cross-bred dairy cows and returns received from them. For this purpose, 144 cows of 132 household from 24 villages were randomly selected. of them, 96 were native cows and 48 were cross-bred cows. The study revealed that among the structure of cost components, labour charge occupied the major share in the total cost of milk production per litre. The total cost of rearing native and cross-bred cows was Tk. 14,155 and Tk. 19,854 per annum, respectively. The average net cost of milk production per litre was Tk. 14.12 for native cows and Tk. 0.52 and for cross-bred cows were Taka 3.40. The benefit-cost ratio of milk per litre was higher (1:1.33) in cross-bred cows than native ones (1:1.04). The study further showed that in comparing with bulk line cost, the price of milk per litre received by the farmers was higher in cross-bred cows than native cows. Therefore, the study recommends dairying with cross-bred cows as encouraging and viable commercial enterprise in Banfladesh.

Economic-based approach for predicting optimal water pipe renewal period based on risk and failure rate

  • Kim, Kibum;Seo, Jeewon;Hyung, Jinseok;Kim, Taehyeon;Kim, Jaehag;Koo, Jayong
    • Environmental Engineering Research
    • /
    • v.24 no.1
    • /
    • pp.63-73
    • /
    • 2019
  • This study suggests a method for calculating the benefits of water pipe renewal based on an estimate of the water supply suspension risk. The proposed method based on five benefit items is more direct and specific than other benefit estimation methods. In addition, a methodology evaluating the economics of pipe renewal based on pipe failure rate is proposed for estimating the optimal renewal point from an economic perspective. By estimating the optimal renewal period based on a yearly benefit cost ratio per pipe in a case study area, it was possible to draft an optimal renewal plan for the subject region from an economic perspective. Compared with other methodologies, a reasonable optimal renewal period was derived from an economic point of view. The result of this study may be used to develop future water pipe renewal plans. Moreover, the proposed methodologies and results derived from this study can be applied to asset management plans.

The Economic Feasibility Analysis of Crop Cultivation Practice Project in Pirganj and Kurigram Districts, Bangladesh (작물재배기술의 경제적 타당성 분석 : 방글라데시 피르간즈군과 쿠리그람군 사례)

  • Tabassum, Nazia;Lim, Jae-Hwan;Gim, Uhn-Soon
    • Korean Journal of Agricultural Science
    • /
    • v.35 no.1
    • /
    • pp.85-100
    • /
    • 2008
  • The United States Department of Agriculture (USDA) funded collaborative project on The Economic Feasibility Analysis of Crop Cultivation Practice Project in Pirganj and Kurigram Districts in Bangladesh will started during 2008-2012, for 4 years with total project cost of US$ 571,270. The project will be implemented in 6 villages; has 1,097 hectares areas which is divided into 948 hectares of agricultural land, 52 hectares of forest land and 345 hectares of other land, covered 1,059 households equal to 5,305 persons in Pirganj and Kurigram districts The project has proposed to be implemented in joint collaboration by Bangladesh Agricultural Research Council (BARC), Bangladesh Agricultural Research Institute (BARI) and Rangpur Dinajpur Rural Service (RDRS) Bangladesh with full participation of the farmers' groups of respective project site. The specific objectives of the project are: (1) to estimate the productivity of paddy, wheat, maize, tobacco and sugarcane (2) to determine the cost of production and returns to the above mentioned crops (3) to study the interrelationship between inputs and output of the above mentioned crops and (4) to examine the resource utilization patterns at farm level. In this project analysis, the net incremental profit is US$33,028. The expected incremental project benefit and incremented production cost are estimated as US$ 219,959 and US$ 186,931 respectively. The financial decision making criteria would be followed in this crop cultivation practice project. After the project implementation, the expected project benefits are assumed to be continued for 15 years. The benefit cost ratio (B/C) of the project is estimated at 1.077 (table 11) when using discount rate of 10% as an opportunity cost of capital in Bangladesh. FIRR of project is estimated at 26.15% which is bigger than the opportunity cost by more than double. So this project is financially feasible and acceptable. Therefore, this project should be extended to other areas to increase the farm income and economic growth of marginal poor farmers in Bangladesh.

  • PDF