At marine construction sites, there are problems with regard to dispute on the responsibility of safety management of chartered barge and its legal issues. In general, demise charter with crew is used for barge charterparty which is committed to the marine construction. Although Chapter 5 of the Korean Commercial Act enact provisions regulating a Time Chargerparty and a Bareboat Charterparty, it is difficult to clarify where the responsibility lies with regard to the safety control of the chartered barge. For this reason, disputes on accountability arise when accident occurs in effect. As a result, parties of the charterparty shift the responsibility on each other and there is increased risk for occurrence of similar accidents. There is no legally required qualification for a head of barge workers who is in charge of barge management. It is not possible to demand the head of barge workers to take charge of tasks which requires professional judgment as a marine technician considering his daily work scope. Furthermore, the barge committed to the marine construction as a form of bareboat charter or equipment charterage is an object which should be managed by safety supervisor of the charterer's marine construction. The charterer bears a duty to manage the safety of the barge. Therefore, the charterer is generally liable for the damage incurred in the course of using the chartered barge.
Kim, Sang-Hyun;Lee, Seung-Hee;Lee, Young-Gill;Yu, Jin-Won
Journal of the Korean Society of Marine Environment & Safety
/
v.14
no.3
/
pp.227-233
/
2008
Recently, the transport quantity of goods between South and North Korea is rising rapidly by increasing of economical exchange between South and North Korea and growth of Gaeseoung industrial complex. In addition to a land transportation route, it is necessary to secure various logistics and transportation route for freight transportation between Incheon and Gaesung. In this paper, we investigated a construction of barge transportaion system between Incheon and Gaesung. The barge transportation system which has many merits such as a little initial investment and convenience of harbor loading/ unloading has been also used to transport freight widely in the EU and USA. Firstly, we investigated barge transport route, marine freight and barge fleet which consists of barge and pusher between Incheon and Gaesung. And next, we designed hull form and general arrangement of a barge and pusher based on shipping service condition, barge fleet, etc. Finally, a construction plans of barge transport system such as a operation of shipping service, berthing facilities, logistics center, intermodal transport are investigated.
In general, a regular charterparty form is used as a charterparty for tugboats which are employed in marine construction and a bareboat charter form is generally used for barge boat charterparty. As the tug-barge charterparty which are currently used do not have a standardised form, contracting parties arbitrarily decide on the terms and conditions of the contract. As a result, provisions of the charterparty usually do not specify in the contract which party bears the burden of liability in case of accident. Furthermore, the terminologies used in the charterparty are different from legal terms of current commercial law which causes confusion. These problems can be solved mostly by clarifying the legal character of the charterparty between the contracting parties and by conforming the terminologies. In addition, endeavour to standardise the contract form must be carried forward at the same time. This research purports to study actual condition of current charterparty for tug-barge ship which are employed to marine construction and to suggest systematic improvement plan. For this purpose, this research focuses on studying cases in which dispute arose due to lack of clarity in the provisions of the contract with regard to which party bears the burden of liability in case of accident. This research also purports to suggest forming the standardised contract terms of the charterparty as one way of solution and examine matters to be attended in writing a standardised form.
Journal of the Korean Society of Marine Environment & Safety
/
v.21
no.6
/
pp.689-695
/
2015
The offshore plant crews that were commissioned in the commercial startup phase boarded the offshore plant in two shifts until the end of the project. The crews who were hired by the owner side stayed in the original offshore plant during the project. However, most of the offshore plant commissioned members who were dispatched from the shipyard were accommodated in the offshore accommodation barge. For this reason, they were exposed to many accidents since there are a lot of people staying in a small space. This study suggested a method for improving survival rate at offshore accommodation barge in terms of life safety. It is assumed that the fire accident among unfortunate events which take place in the offshore accommodation barge mainly occurred. So, this study analyzed the safety evacuation for offshore plant employees using fire simulation model based on both domestic and international law criteria. In particular, When fire occurs in the offshore accommodation barge, the periodically well trained crews are followed safety evacuation procedure. whereas many employees who have different background such as various occupations, cultural differences, races and nationality can be commissioned with improper evacuation behaviors. As a result, the risk will be greater than normal situation due to these inappropriate behaviors. Therefore, This study analyzed the Required Safe Escape Time (RSET) and Available Safe Escape Time (ASET). Also it was suggested the improvement of structure design and additional arrangement of safety equipment to improve the survival rate of the residents in offshore accommodation barge.
Proceedings of the Korean Geotechical Society Conference
/
2004.03b
/
pp.799-806
/
2004
Recently, as the forerunner in establishing the Northeast Asia's logistics base, a lot of marine engineering works such as new ports and container terminals, extension of old ports, new bridges, land reclamation etc. have been progressed. Parallel to it, there is also an increasing demand for improving the safety of construction. In this situation, high resolution seismic reflection profiling can be well used, attempting to classify rocks and sediments under water, if possible, to delineate the distribution of grain sizes in sediments not only for calculating the cost of removing sediments from harbour's channels, but also for estimating the bearing capacities for bridge or port construction. However, the results from the corresponding reflection survey that has been in operation in our country can not be effectively used for engineering purposes mostly due to the insufficient resolution. Thus. in this paper, two innovative strategies are introduced to enhance resolution. The one deals with a newly designed exploration barge that will help reduce several kinds of noises encountered electrically or operationally. The other is associated with an establishment of optimum measuring system comprising e.g. a specially devised hydrophone with a combination of 7 piezoelectric elements. Field experiments performed at Busan harbour are illustrated. The quality of acquired data was thereby fundamentally improved in comparison with that obtained at the same time in a conventional way.
Transactions of the Korean Society of Mechanical Engineers A
/
v.36
no.6
/
pp.681-689
/
2012
In this study, we performed a simulation of the dynamic response of a multibody system to calculate the tension acting on wire ropes connecting floating cranes and a heavy cargo such as a Giga Block weighing over 5000 tons when the cargo is salvaged using parallel connected floating cranes. In this simulation, we supposed that the motion of the floating cranes, barge ship, and heavy cargo has 6 degrees of freedom and that the interaction is determined by constraints among them. In addition, we considered independent hydrostatic and hydrodynamic forces as external forces acting on the floating cranes and barge ship. The simulation result can be a basis for verifying the safety of construction methods in which heavy cargo is salvaged by parallel connected floating cranes, and it can also be used to guide the development of such construction methods.
The traffic of tug/barges which are carrying construction materials, large plants for harbor development, or offshore structures has recently increased in the coast of Korea. The west and south coast of Korea are always congested due to a lot of islands and traffic concentration. Specially tug/barges have higher probability of marine accidents due to their bad maneuverability than others. Considering the operational circumstance and maneuverability, this study was to develop a wide-area monitoring and control system for tug/barges in the coastal area of Korea. The system was made in the form of three program modules i.e. navigation analysis program module, monitoring and control program module, database module. And seven functions were programmed to monitor and control the tug/barges efficiently. These are ship information search, tug/barge information and track management, designated area and safe navigation zone management, fairway management, accident data management, warning of danger, safety information management.
So, Jaehyuk;Oh, Keunyeong;Park, Kwansik;Kim, Sun woo;Lee, Kangmin
Journal of Korean Society of Steel Construction
/
v.29
no.1
/
pp.89-98
/
2017
The offshore plant structure has been transported to the site by barge because it is hard to manufacture in site. When the structure was transported on the sea, offshore plant structures and connection were experienced repetitive submarine load. For this reason, it was known for that the axial force of high-strength bolted connection was declined. Therefore, in this study, high-strength bolted connection was evaluated the shear fatigue performance under longtime fatigue load during marine transport. The experimental variables were selected intial axial force, surface type, and bolt type because they ar important factors in the change of axial force of bolts. As a experimental results of considering various variables, the variation of axial force showed within 1%. Therefore, the high-strength bolted connection was verified structural safety under longtime fatigue load.
Journal of the Korean Society of Marine Environment & Safety
/
v.29
no.2
/
pp.177-187
/
2023
The Ship Safety Act prescribes matters necessary for the maintenance of seaworthiness and safe navigation of ships. In this regard, Article 10 of this Act requires shipowner to undergo occasional survey if he/she wants to temporarily change intends to modify the details entered in a ship survey certificate. Such measures are in accordance with the maintenance of the state of the ship after the ship inspection under Article 15 of this Act, and this Act includes "harbor construction work ship" under Article 39 Paragraph (1) of the Harbor Act. However, although the harbor construction work ship originally showed the same operating system as the barge, it was not applied to the Ship Safety Act and was registered and surveyed under the Construction Machinery Management Act. Then "Seokjeong No. 36" sinking accident in Ulsan on December 14, 2012, led to the amendment of the Harbor Act in 2016, and considering the fact that it was added to the Ship Safety Act and applied, there is a realistic limit to applying all the regulations stipulated in the Ship Safety Act to the harbor construction work ship. Accordingly, this study discusses the work characteristics through concept, registration, work area, survey regulations, application case of temporary alteration etc. of harbor construction work ships and controversial issues related to the scope of application of the Ship Safety Act of actual harbor construction work ships, and also the appropriate scope of "temporary alteration" among temporary inspections prescribed in Article 10 of the Ship Safety Act in consideration of the legislative purpose of incorporating harbor construction work ships into the survey subject to the Ship Safety Act in accordance with the revision of the Harbor Act.
Journal of the Korean Society for Marine Environment & Energy
/
v.18
no.1
/
pp.22-28
/
2015
The design on a riser in 1MW OTEC system is performed. The minimum diameter of the riser is decided depending on intake quantity of deep-sea water to supply an OTEC cycle. An applicable pipe material is selected from analyzing the properties of commercial pipes. The selected HDPE pipe with the low density and strength is reinforced with a lumped block attached at the end of and wire ropes along the riser. A lumped block, connected to a floating structure by wire ropes, with 25% and 50% weight of a GFRP riser is designed to be attached the end of a riser. The structural safety of the HDPE riser with wire rope supporting axial loads induced by a lumped block is analyzed under the harsh ocean environmental condition near Hawaii ocean with the numerical method. The final dimension of the riser and accessories is determined considering the economic point of view. The designed riser will be applicable to the construction of the 1 MW OTEC pilot plant.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.