• Title/Summary/Keyword: Balanced speed

검색결과 129건 처리시간 0.029초

블레이드 손상에 따른 이축식 터보팬 엔진의 동적 안정성 해석 (Rotordynamic Analysis of a Dual-Spool Turbofan Engine with Focus on Blade Defect Events)

  • 김시태;정기현;이준호;박기현;양광진
    • Tribology and Lubricants
    • /
    • 제36권2호
    • /
    • pp.105-115
    • /
    • 2020
  • This paper presents a numerical study on the rotordynamic analysis of a dual-spool turbofan engine in the context of blade defect events. The blades of an axial-type aeroengine are typically well aligned during the compressor and turbine stages. However, they are sometimes exposed to damage, partially or entirely, for several operational reasons, such as cracks due to foreign objects, burns from the combustion gas, and corrosion due to oxygen in the air. Herein, we designed a dual-spool rotor using the commercial 3D modeling software CATIA to simulate blade defects in the turbofan engine. We utilized the rotordynamic parameters to create two finite element Euler-Bernoulli beam models connected by means of an inter-rotor bearing. We then applied the unbalanced forces induced by the mass eccentricities of the blades to the following selected scenarios: 1) fully balanced, 2) crack in the low-pressure compressor (LPC) and high pressure compressor (HPC), 3) burn on the high-pressure turbine (HPT) and low pressure compressor, 4) corrosion of the LPC, and 5) corrosion of the HPC. Additionally, we obtained the transient and steady-state responses of the overall rotor nodes using the Runge-Kutta numerical integration method, and employed model reduction techniques such as component mode synthesis to enhance the computational efficiency of the process. The simulation results indicate that the high-vibration status of the rotor commences beyond 10,000 rpm, which is identified as the first critical speed of the lower speed rotor. Moreover, we monitored the unbalanced stages near the inter-rotor bearing, which prominently influences the overall rotordynamic status, and the corrosion of the HPC to prevent further instability. The high-speed range operation (>13,000 rpm) coupled with HPC/HPT blade defects possibly presents a rotor-case contact problem that can lead to catastrophic failure.

강 사장교 가설 중 임시 제진방법에 대한 풍동실험 연구 (Wind Tunnel Aeroelastic Studies of Steel Cable-stayed Bridge with Wind Cable and Temporary Support)

  • 조재영;심종한;이학은;권오훈
    • 한국강구조학회 논문집
    • /
    • 제18권1호
    • /
    • pp.33-45
    • /
    • 2006
  • 일반적으로 사장교와 같은 장대교량은 완성 후에 비하여 시공 중 바람에 흔들리기 쉬어 내풍 안정성 문제가 발생하는 경우가 많다. 완공상태에서 충분한 내풍안정성을 확보하고 있더라도 시공단계에서는 설계풍속 이하에서 플러터 등의 공기역학적 진동현상 이 발생하는 경우가 많기 때문에 가설공법이 결정되면 반드시 풍동실험을 능한 적절한 제진 대책 안을 입안해 두어야 한다. 본 연구에서는 가설단계를 고려한 3차원 전교모형실험을 통하여 주경간이 500m인 사장교의 공기역학적 거동을 살펴보았다. 작업 중에 안정성 확보가 중요한 밸런스드 캔틸레버 상태인 가설단계 50% 에서 내풍케이블 및 가설벤트를 이용한 4가지 제진 대책방안을 수립하여 각각에 대하여 내풍 안정성을 검토하였다. 각 설치방안 별 제진효과를 서로 비교 분석하여 검토 범위 내에서 사장교 시공 중 가장 효율적인 임시 제진방안을 제시하였다. 추가적으로 밸런스드 캔틸레버 상태와의 내풍안정성을 비교하기 위하여 완성계와 제진 대책이 없는 주경간 폐합전의 프리캔틸레버 상태에 대하여 살펴보았다.

다수의 병렬 입.출력 환경을 위한 높은 노이즈 마진을 갖는 LVDS I/O 회로 (High Noise Margin LVDS I/O Circuits for Highly Parallel I/O Environments)

  • 김동규;김삼동;황인석
    • 전자공학회논문지SC
    • /
    • 제44권1호
    • /
    • pp.85-93
    • /
    • 2007
  • 본 논문에서는 다수의 병렬 입.출력 환경을 위한 높은 노이즈 마진을 갖고 있는 LVDS I/O 회로를 소개한다. 제안된 LVDS I/O회로는 송신단과 수신단으로 구성되어 있으며 송신단 회로는 차동위상 분할기와 공통모드 피드백(common mode feedback)을 가지고 있는 출력단으로 이루어져 있다. 차동위상 분할기는 SSO(simultaneous switching output) 노이즈에 의해 공급전압이 변하더라도 안정된 듀티 싸이클(duty cycle)과 $180^{\circ}$의 위상차를 가진 두 개의 신호를 생성한다. 공통모드 피로백을 가지고 있는 출력단 회로는 공급전압의 변화에 상관없이 일정한 출력전류를 생성하고 공통모드 전압(common mode voltage)을 ${\pm}$0.1V 이내로 유지한다. LVDS 수신단 회로는 VCDA(very wide common mode input range differential amplifier)구조를 사용하여 넓은 공통 입력전압 범위를 확보하고 SSO 노이즈에 의한 공급 전압의 변화에도 안정된 듀티 싸이클(50% ${\pm}$ 3%)을 유지하여 정확한 데이터 복원이 가능하다. 본 논문에서 제안한 LVDS I/O 회로는 0.18um TSMC 라이브러리를 기본으로 하여 설계 되었으며 H-SPICE를 이용하여 시뮬레이션 하였다.

암 치료 시 영양상담을 통한 식생활 개선에 관한 연구 (Study on the Improvement of Dietary Life of Cancer Patients during Treatment by Nutrition Counseling)

  • 홍기연;최윤진;엄완근;임현숙;천종희
    • 대한지역사회영양학회지
    • /
    • 제21권1호
    • /
    • pp.93-101
    • /
    • 2016
  • Objectives: This study investigated the improvement of food habits and eating behavior of cancer patients during treatment through the continuous nutrition counseling and monitoring. Methods: Thirty cancer patients during treatment were participated in this study, and the first nutrition counseling and the first and second monitoring were conducted after 2-3 week intervals. Results: As a result of the nutrition counseling and monitoring, all patients improved to a great extent to consume 3 meals a day. The frequency of having breakfast was significantly increased with the nutrition counseling and continuous monitoring as well. The meal fixed quantity was stabilized and the eating speed slowed down as more nutrition counseling were done. The snack intakes of patients did not show any significant difference after the nutrition counseling but showed a slight decline after the monitoring. The frequencies of eating out and a late-night meal significantly decreased after the monitoring. The intakes of fish, meat, vegetables, milk and fruits needed for a well-balanced diet significantly increased as more nutrition counseling were done. The intakes of processed food were significantly decreased after the nutrition counseling and the intakes of fast food were significantly decreased as more nutrition counseling were done. The water intake of patients also significantly increased. In the eating behavior related to health, the frequency of drinking alcohol significantly decreased after nutrition counseling consultation and no patients had dietary supplements after the first monitoring. Conclusions: These results suggested that continuous nutrition counseling is effective in improving eating habits of cancer patients.

Rotor Failures Diagnosis of Squirrel Cage Induction Motors with Different Supplying Sources

  • Menacer, Arezki;Champenois, Gerard;Nait Said, Mohamed Said;Benakcha, Abdelhamid;Moreau, Sandrine;Hassaine, Said
    • Journal of Electrical Engineering and Technology
    • /
    • 제4권2호
    • /
    • pp.219-228
    • /
    • 2009
  • The growing application and the numerous qualities of induction motors (1M) in industrial processes that require high security and reliability levels has led to the development of multiple methods for early fault detection. However, various faults can occur, such as stator short-circuits and rotor failures. Traditionally the diagnosis machine is done through a sinusoidal power supply, in the present paper we study experimentally the effects of the rotor failures, such as broken rotor bars in function of the ac supplying, the load and show the impact of the converter from diagnosis of the machine. The technique diagnosis used is based on the spectral analysis of stator currents or stator voltages respectively according to the types of induction motor ac supplying. So, four different ac supplying are considered: ${\odot}$ the IM is directly by the balanced three-phase network voltage source, ${\odot}$ the IM is fed by a sinusoidal current source given the controlled by hysteresis, ${\odot}$ the IM is fed (in open loop) by a scalar control imposing through ratio V/f=constant, ${\odot}$ the IM is controlled through a vector control using space vector pulse width modulation (SVPWM) technique inverter with an outer speed loop.

송전선로 고장제거 지연에 따른 동기 탈조 계전기 동작 검토 (A Study on Out-of-Step Relay Operation due to Delayed Fault Clearing in Transmission Line)

  • 박지경;김광현;김철환;유영식;양정재
    • 전기학회논문지
    • /
    • 제66권10호
    • /
    • pp.1466-1473
    • /
    • 2017
  • Generally, electrical torque in synchronous generator is balanced with the rotor mechanical torque under steady-state condition. Thus, the synchronous generator rotor rotates at constant speed. However, under fault condition, the electrical torque output is suddenly decreased and the sum of both torques does not remain constant. If the mechanical torque is not decreased at the same time, the generator rotor would accelerate. Therefore, this accelerating generator rotates at different speeds with respect to other generators in the power system. This phenomena is called as Out-of-Step (OOS). In this paper, we presented a certain two-step type quadrilateral OOS relay setting, which is applicable in actual field, and examined the validity of its setting value with OOS simulation conditions due to delayed fault clearing in transmission line. In order to conduct the study of OOS relay characteristics, we checked the impedance locus and generator output characteristics under the various delayed fault clearing conditions. Moreover, we proposed a countermeasure for avoiding the misoperation of OOS relay during the stable swing by modifying the setting values.

시스템 엔지니어링 교육의 사례연구와 미래 발전방안 (Case Studies and Future Direction in Systems Engineering Educational Program)

  • 이재율;박영원
    • 공학교육연구
    • /
    • 제9권2호
    • /
    • pp.52-70
    • /
    • 2006
  • 다학제 및 학제간의 다양한 지식과 실질적인 경험을 바탕으로 진화해온 특수 전공분야로서 시스템 엔지니어링은 오늘 날 대형 복합시스템의 개발에 필수적인 분야이다. 컴퓨터의 발달과 분석적 해석기법의 발달로 인해 사회적 요구는 더욱 다양하고 복잡해 졌다. 이러한 변화의 대안으로 대두하고 있는 분야가 시스템 엔지니어링이다. 시스템 엔지니어링은 '고객의 필요를 만족하는 통합된 시스템 생명주기의 균형 잡힌 시스템의 해결책을 개발하고 검증하는 학제간 프로세스이며, 문제정의, 대안조사, 아키텍팅, 시스템 모델, 통합, 시스템 개발 및 성능평가를 하향식, 포괄적이며 반복적으로 문제를 풀어나가는 프로세스이다. 본 논문의 목적은 시스템 엔지니어링에 대하여 소개하고 외국과 한국의 교육현황을 조사하여 해외 시스템 엔지니어링 교육의 사례연구를 통해서 우리나라의 공학교육 발전을 위한 시스템 엔지니어링 교육발전 방안을 제안하려고 한다.

ICT 학습을 활용한 이미지 트레이닝이 운동기능 향상 및 수업태도에 미치는 효과 (Effect of the Image Training that utilized ICT Learning in the Improvement of Athletic Skills and Attitude in Class)

  • 이기은;양해술
    • 한국산학기술학회논문지
    • /
    • 제10권10호
    • /
    • pp.2837-2845
    • /
    • 2009
  • ICT 학습을 활용한 심상훈련은 핸드볼의 운동 기능과 집중력을 높이기 위하여 경기 장면과 정확하고 모범적인 운동 수행 동작을 인터넷을 통하여 미리 학습하게 하여, 학습자로 하여금 체육수업에 대한 기본적인 태도와 운동기능 향상, 그리고 수업만족도에 많은 영향을 미치고 있다는 것을 확인시켜 주었다., 스피드(속도), 폼(자세), 정확성(슈팅성공율), 적응력(경기력)의 영역에서도 운동능력이 향상되었음을 알 수 있었다. 이는 기존의 학습방법에서 ICT 학습과 심상훈련과의 장점을 현장에 적용시킨 한층 진일보한 교육방식이라 할 수 있겠다. 본 연구대상에 있어 전국 단위표본을 대상으로 하지 못했다는 점에서 연구 결과를 일반화시키는데 다소 무리가 있다. 따라서 차후 연구에서는 지역 간, 학년 간 균형적 표본을 통해 대표성이 보완된 연구가 계속적으로 선행되어져야 할 것이다

집단마을 조성사업용 GSIS 구축을 위한 기구사진체계의 활용 (The Utilization of Photo Balloon System to GSIS Construction for Build-up a Group of Villages)

  • 이재기;이현직;조재호
    • 대한공간정보학회지
    • /
    • 제2권2호
    • /
    • pp.67-79
    • /
    • 1994
  • 최근 급격한 경제성장은 도시영역 및 인구의 확장으로 인한 도시문제를 야기시켰으며, 이와 같은 도시문제의 해결을 위해서는 국토개발과 관련된 각종 계획 및 사업을 수행되고 있다. 일반적으로 합리적인 계획 및 설계의 추진을 위해서는 대상지역에 대한 신속하고 정확한 지형정보의 제공이 필수적이다. 본 연구에서는 소규대상지역에 대한 계획 및 사업의 합리적인 추진에 영향을 미치는 신속하고 정확한 지형정보의 제공을 위해 기구사진체계를 도입하고 자료해석방법으로 수치사진측량의 정사투영영상 제작 알고리즘을 정립함으로써 소규모대상지역에 대한 지형공간정보체계의 구축에 기여함을 목적으로 하고 있다. 본 연구의 수행결과, 기구사진체계적 안정성 및 균형성을 확보할 수 있는 방안을 제시할 수 있었으며, 소규모대상지역의 지형공간정보체계의 구축에 필수적인 지형정보의 해석방법을 정립할 수 있었다.

  • PDF

NRD 가이드를 이용한 장거리 무선통신용 밀리미터파 대역 송수신기 개발 (Development of Millimeter wave Transmitter and Receiver for Long Distance Wireless Transmission Using NRD waveguide)

  • 박성현;김수환;신천우
    • 한국통신학회논문지
    • /
    • 제30권9A호
    • /
    • pp.867-875
    • /
    • 2005
  • 본 논문은 NRD 가이드를 이용하여 10km이상의 장거리 무선통신이 가능한 밀리미터파 대역용 FM 송신기 및 수신기를 제작하였다. 40GHz 사용주파수의 반파장 크기의 간격을 가지는 상하도체판 사이에 PTEE 유전체선로상에 건발진기, FM변조기 및 안테나로 구성된 FM 송신기를 제작하고, 동일한 간격을 가지는 상하도체판 사이에 국부발진용 건발진기, 밸런스믹서, 3dB 방향성결합기 및 안테나로 구성한 FM 수신기를 각각 제작하였다. 또한 제작된 FM송신기 및 수신기를 이용하여 무선통신 영상전송시험을 실시하였다. 이때 전송거리 10km의 시험거리에서 영상신호를 송신측에서 보낸 후 수신측의 TV 수상기를 통해 선명한 영상을 실시간으로 재생할 수 있었다. 이에 개발된 40GHz 대역 FM 송신기 및 수신기는 CATV의 전송이나 광대역 전송이 필요한 무선통신 시스템으로 사용이 가능하며, 장거리 초고속통신망의 연결 장치로 사용될 수 있을 것이다.