• Title/Summary/Keyword: Backfill Grouting

Search Result 14, Processing Time 0.019 seconds

Evaluation of shield TBM segment acting load through monitoring data back analysis (계측 데이터 역해석을 통한 쉴드 TBM 터널 세그먼트의 작용하중 평가)

  • Lee, Gyu-Phil;Chang, Soo-Ho;Bae, Gyu-Jin;Choi, Soon-Wook;Ahn, Chang-Yoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.905-913
    • /
    • 2017
  • To design segment lining, loads such as self weight, vertical load, horizontal load, ground reaction, water pressure, backfill grouting pressure et al. have to be considered. Earth pressure and water pressure are the major factor to design segment lining such as concrete strength, segment thickness and amount of rebar et al. To analysis earth pressure and water pressure acting on segment lining, filed monitoring and back analysis are performed in this study.

CASE STUDY ON SEVERELY-DAMAGED REINFORCED EARTH WALL WITH GEO-TEXTILE IN HYOGO, JAPAN Part II: Numerical simulation into causes and countermeasures

  • Hur, Jin-Suk;Kawajiri, Shunzo;Jung, Min-Su;Shibuya, Satoru
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09c
    • /
    • pp.11-17
    • /
    • 2010
  • Numerical analysis was carried out in order to simulate the development of the large deformation that took place on the reinforced earth wall, a part of the Tottori expressway planned to pass Hyogo, Japan. Since this reinforced earth wall had experienced unexpected deformation of the wall during construction, the wall was re-constructed twice. However, the wall deformation showed no sign to cease even at the final stage of the construction. Countermeasures to re-stabilize the wall were demanded. In part I of this paper, it was manifested that subsidence of a 3-meter weak soil due to seepage flow was responsible for the large deformation. A part of concrete panel wall was severely damaged due to extremely large pulling force of geotextile induced by the hammock state. As for the countermeasures, "grouting with slag system" was applied to fill voids of the backfill, and also to prevent further development of settlement in the weak soil layer. "Ground anchor" was also considered to achieve the prescribed factor of safety.

  • PDF

Strength Characteristics of Improved Dredged Clay for Urgent Recovery of Ground Subsidence (함몰지반 긴급복구를 위한 개량준설점토의 강도 특성)

  • Oh, Sewook;Baek, Seungju;Bang, Seongtaek
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.5
    • /
    • pp.31-38
    • /
    • 2019
  • Recently, there has been an increasing number of ground subsidence (sink-hole) in the downtown areas, and in such a case, it is important to minimize accidents and passages through prompt recovery. With respect to the present recovery method for ground subsidence, the methods of applying the back filling after excavating the ground subsidence or using the grouting injected materials to restore the ground are mostly used, but there has been few studies on materials used for recovering the ground subsidence. Therefore, in order to clarify the characteristics of back filling materials used in the ground subsidence, this study uses the environment-friendly hardening agent to improve the dredged clay, and then, the mixture ratio of hardening agent and mixture ratio of decomposed granite soil is changed to cure for 3, 7, 14 and 28 days to analyze the intensity characteristics of the unconfined compression, and it was compared with the unconfined compression intensity for the previously used cement, a hardening agent. In order to evaluate the characteristics of intensity on the back filling materials, the C.B.R test was carried out, and for the review on whether the back filling materials influence on corrosion of water and sewer pipes and others, the soil non-resistance test was carried out. As a result of the test, for the case of the recovery work of the ground subsidence that requires urgency, it is considered as prudent if the hardening agents of 12% are integrated to cure for 3 days or longer, and for not having the influence on the corrosion of the gas tube or water pipes, it is proposed to mix for 30% or more of the decomposed granite soil. Door model test were conducted To confirm the bearing capacity characteristics of the solidified layer.

Review on Rock-Mechanical Models and Numerical Analyses for the Evaluation on Mechanical Stability of Rockmass as a Natural Barriar (천연방벽 장기 안정성 평가를 위한 암반역학적 모델 고찰 및 수치해석 검토)

  • Myung Kyu Song;Tae Young Ko;Sean S. W., Lee;Kunchai Lee;Byungchan Kim;Jaehoon Jung;Yongjin Shin
    • Tunnel and Underground Space
    • /
    • v.33 no.6
    • /
    • pp.445-471
    • /
    • 2023
  • Long-term safety over millennia is the top priority consideration in the construction of disposal sites. However, ensuring the mechanical stability of deep geological repositories for spent fuel, a.k.a. radwaste, disposal during construction and operation is also crucial for safe operation of the repository. Imposing restrictions or limitations on tunnel support and lining materials such as shotcrete, concrete, grouting, which might compromise the sealing performance of backfill and buffer materials which are essential elements for the long-term safety of disposal sites, presents a highly challenging task for rock engineers and tunnelling experts. In this study, as part of an extensive exploration to aid in the proper selection of disposal sites, the anticipation of constructing a deep geological repository at a depth of 500 meters in an unknown state has been carried out. Through a review of 2D and 3D numerical analyses, the study aimed to explore the range of properties that ensure stability. Preliminary findings identified the potential range of rock properties that secure the stability of central and disposal tunnels, while the stability of the vertical tunnel network was confirmed through 3D analysis, outlining fundamental rock conditions necessary for the construction of disposal sites.