• Title/Summary/Keyword: BOD removal rate

Search Result 231, Processing Time 0.024 seconds

Study on Natural Wastewater Treatment Systems by Constructed Wetland for Rural Area (인공습지에 의한 농촌오수처리에 관한 연구)

  • 윤춘경;권순국;김형중
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.4
    • /
    • pp.55-63
    • /
    • 1997
  • Constructed wetland system which can be applied to the rural wastewater treatment system was examined by pilot plant in Kon-Kuk University. Hydraulic loading rate of wastewater was about 0.16m$^3$/m$^2$. day and theoretical detention time in the system was 1.38 days. The effluent of the septic tank for the school building was applied as inflow to the system. The influent concentration of DO was zero but effluent was up to 4.37mg/${\ell}$ which implies that oxygen was supplied enough from atmosphere by reaeration to support biological activity of the system. Average influent concentration of BOD was 104mg/${\ell}$ and effluent was 24mg/${\ell}$ with average removal rate of 76%. Average influent concentration of COD was 215mg/${\ell}$ and effluent was 63mg/${\ell}$ with average removal rate of 70 % . Average influent concentration of SS was 78mg/${\ell}$ and effluent was 10mg/${\ell}$ with average removal rate of 87%. Two components, BOD and SS, are regulated by law to keep maximum water quality standard of 80mg/${\ell}$ when daily outflow rate is less than 100$m^3$/day which is the case of most rural communities. Therefore, the results from the experiment showed that constructed wetland system can meet the water quality standard easily. Average influent concentration of total nitrogen was 165mg/lwhich is relatively higher than normal wastewater, and effluent was about 156mg/${\ell}$ with average removal rate of only 6%. Average influent concentration of total phosphorus was 41 mg/${\ell}$ and effluent was 6mg/${\ell}$ with average removal rate of 87%. Overall, constructed wetland system was thought to be effective to treat wastewater if nitrogen removal mechanism is improved. Considering low cost, less maintenance, and high treatability, this system can be a practical alternative for the wastewater treatment in rural area The experiment was performed during the summer and fall season, and treatment efficiency of the system is expected to decrease in low temperature. therefore, further study including temperature is required to evaluate feasibility of the system more in detail.

  • PDF

A Study on the Removal of Organics and Disinfection Effect in Sand Filter Using Nano Silver Sand (은나노 모래를 이용한 모래여과에서 유기물질 제거 및 소독 효과에 관한 연구)

  • Seon, Yong-Ho
    • KSBB Journal
    • /
    • v.27 no.1
    • /
    • pp.16-20
    • /
    • 2012
  • In this study, novel nano silver sand filtration method was compared with UV treatment and normal sand filtration method through filtering treated water from sewage treatment plant. As a result, $BOD_5$ removal rate of nano silver sand filtration showed higher approximately 31% and 23%, comparing with UV treatment and sand filtration. Moreover, $KMnO_4$ removal rate of nano silver sand was about 6.6 and 2.8 times higher than other two methods. In addition, it showed better for removing SS and total coliform, comparing with others. Also, there is no bacteria on nano silver sand after experiments. Therefore, nano silver sand filtration will be effective for advanced water treatment.

Removal of Toxicity from Kraft Pulp Mill Effluents by Activated Sludge Process (활성슬러지 공정에 의한 Kraft 펄프 폐수의 독성 제거)

  • Kim, Yeong-Kwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.8 no.3
    • /
    • pp.9-18
    • /
    • 1994
  • Activated sludge pilot plant testing was conducted to determine the ability of a well-designed activated sludge treatment system to remove chromic toxicity from the bleached kraft pulp mill effluent. Removals of conventional(BOD and SS) and nonconventional(resin and fatty acids, color, AOX) pollutants were estimated. The pilot plant was operated at steady state for about 10 weeks at an F/M of 0.28 and a sludge age of 8.4 days. The average MLSS concentration was 4,309mg/l, of which volatile fraction was 57%. During the operation period, the BOD removal reaction rate(k) was determined to be 8.2/day at $30^{\circ}C$. The BOD removal was 84 percent, which was 3 to 6 percent lower than expected for full-scale treatment. The chronic toxicity of the activated sludge effluent was tested by employing both Dinnel and the BML protocols. It was found that the pilot plant could achieve in excess of 90 percent reduction in chronic echinoderm toxicity. The data show slight reduction of color and AOX across the activated sludge system. The pilot system, however, demonstrated on excellent removal of resin and fatty acids.

  • PDF

Nitrogen removal characteristics of pigment wastewater using PAC-A/O process (PAC-A/O 공정을 이용한 안료폐수의 질소 제거 특성)

  • Jeong, Jongsik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.32 no.1
    • /
    • pp.19-25
    • /
    • 2018
  • The objectives of this study were to evaluate the removal characteristics of total nitrogen, the influence factor of denitrification and the optimum operating condition in the pigment wastewater treatment using PAC-A/O process. The operating conditions of PAC-A/O process were mean BOD volumetric loading $0.86kgBOD/m^3/day$, mean F/M ratio 0.072~0.13 kgBOD/kgMLVSS/day and mean C/N ratio 3.47, respectively. The conditions of anoxic process in the field plant test were mean pH 8.3~8.7 and mean temperature $34.1{\sim}44.0^{\circ}C$. The ORP bending point knee was eventually appeared in the ORP -107 mV and $NO_3{^-}-N$ removal efficiency was increased according to the ORP decrease. In the ORP -107 mV below condition, the removal efficiency of T-N and $NO_3{^-}-N$ was 92.3~95.0% and 98.5~99.7%. Denitrification rate was calculated to be 1.581~1.791 mg $NO_3{^-}-N/gMLSS/hr$. The experimental results showed that the ORP control in the PAC-A/O process could be an effective method for treatment of pigment wastewater.

A Study on the Removal of Grease and Oill in the Treatment Plant (하수처리장의 유지제거에 대한 연구)

  • 박재효
    • Journal of Environmental Health Sciences
    • /
    • v.7 no.1
    • /
    • pp.1-7
    • /
    • 1981
  • During 20 days from November 4 to 28, 1980, the quantities of grease and oil, BOD (biological oxygen demand), COD (chemical oxygen demand), SS (suspended solid) were measured at Grit Chamber, Primary Sedimentation Tank, Secondary Sedimentation Tank in Chung Gye Chun sewage treatment plant. The results were as follows. 1. The average of grease and oil quantities were 251mg/l at Grit Chamber, 185mg/l at Primary Sedimentation Tank, 47mg/l at Secondary Sedimentation Tank. 2. In the secondary treatment for the removal of grease and oil, the removed quantities of grease and oil were increased according to increasing the quantities of influent grease and oil. The regression equation were as follows G.O.removed=0.731 G.O. influent+3.235 (r=0.887) 3. The average of grease and oil removal rate was 76.4% and the standard deviation of grease and oil removal rate daily was 10.6%. 4. G.O. (grease and oil) and BOD, COD, SS showed significant correlationship at Grit Chamber, Primary Sedimentation Tank, Secondary Sedimentation Tank. (P<0.05). 5. In the secondary treatment, effluent grease & oil and other parameters were analyzed by means of Stepwise multiple regression. Multple regression equation for estimates of effluent grease and oil were as follows. $GO_E=-9.1637+2.0380 SS_E+0.068 SS_I$ (r=0.778) 6. The correlative parameters for the effluent grease and oil seem to be the influent SS and the effluent SS. 7. It was estimated that the removal of grease and oil would be improved by means of improvement of suspended solids removal efficiency but it is necessary to inquire further into the study.

  • PDF

Feasibility of Aquatic Plants (Eichhornia crassipes and Water dropwort) for Nutrients Removal (수생식물(부레옥잠 및 미나리)을 이용한 영양염류 제거에 관한 연구)

  • Choi, Don-Hyeok;Kang, Ho;Lee, Mi-Kyung
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.32 no.2
    • /
    • pp.141-148
    • /
    • 2010
  • Feasibility of floating aquatic plants (Eichhornia crassipes and Water dropwort) was investigated in order to control of sewage depending on various initial loading in a lab scale test. In addition, field test was conducted to assess the uptake rate of nutrient by E. crassipes. Lab-scale test applying primary domestic effluent operated at 4 day HRT shows that the highest uptake rates were 1.06 g N/$m^2{\cdot}day$ and 0.39 g P/$m^2{\cdot}day$ in the E. crassipes reactor. BOD removal efficiency in E. crassipes reactor was as high as 80% when the loading value was lower than 185 kg BOD/$ha{\cdot}day$. While 70 ~ 80% removal efficiency of BOD was achieved when the loading value was lower 80 kg BOD/$ha{\cdot}day$ at the W. Dropwort reactor. Experiment results show that E.crassipes has a higher nutrients removal efficiency than W. dropwort under high pollutant loading. Input loadings of TN and TP should not exceed to 10 kg TN/$ha{\cdot}day$ and 2.0 kg TP/$ha{\cdot}day$ respectively to provide a 50% TN and 80% TP removal efficiencies using E. crassipes. The field test demonstrated that an annual yield of E. crassipes mass was estimated as a fresh weight of 30.9 $m^3/ha{\cdot}yr$. E. crassipes grown in field pads absorbed 76.7 kg N/$ha{\cdot}yr$ and 13.4 kg P/$ha{\cdot}yr$ as a dry weight.

Comparison of Biological Nutrient Removal Efficiencies on the Different Types of Membrane (분리막 종류에 따른 하수의 생물학적 고도처리 효율 비교 연구)

  • Park, Jong-Bu;Shin, Kyung-Sook;Hur, Hyung-Woo;Kang, Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.3
    • /
    • pp.322-328
    • /
    • 2011
  • This study was performed to investigate the characteristics of nutrient removal of municipal wastewater in the membrane bioreactor system with the different types of membrane. Membrane bioreactor consists of three reactors such as two intermittent anaerobic and the submerged membrane aerobic reactor with flat sheet and hollow fiber membrane, respectively. The removal efficiencies of $COD_{cr}$, BOD, SS, TN and TP on the flat sheet membrane bioreactor were 94.3%, 99.0%, 99.9%, 70.3% and 63.1%, respectively. In addition, The removal efficiencies of $COD_{cr}$, BOD, SS, TN and TP on the hollow fiber membrane bioreactor were 94.0%, 99.3%, 99.9%, 69.9% and 66.9%, respectively. The estimated true biomass yield, specific denitrification rate (SDNR), specific nitrification rate (SNR) and phosphorus removal content on the flat sheet membrane bioreactor were $0.33kgVSS/kgBOD{\cdot}d$, $0.043mgNO_3-N/mgVSS{\cdot}d$, $0.031mgNH_4-N/mgVSS{\cdot}d$, and 0.144 kgP/d, respectively. In addition, the estimated true biomass yield, specific denitrification rate (SDNR), specific nitrification rate (SNR) and phosphorus removal content on the hollow fiber membrane bioreactor were $0.30kgVSS/kgBOD{\cdot}d$, $0.067mgNO_3-N/mgVSS{\cdot}d$, $0.028mgNH_4-N/mgVSS{\cdot}d$, and 0.121 kgP/d, respectively. There was little difference between the flat sheet and hollow fiber on the nutrient removal efficiencies except SNR and SDNR. These differences between them were caused by the air demand to prevent the membrane fouling. The flux and oxygen demand for air scouring were $19.0L/m^2/hr$ and $2.28m^3/min$ for the flat sheet membrane, and $20.7L/m^2/hr$ and $1.77m^3/min$ for the hollow fiber membrane on an average.

Effect of Coagulant addition on Nutrient Removal Efficiency in a Submerged Membrane Bioreactor (응집제의 첨가에 따른 Membrane bioreactor 의 고도처리 효율 연구)

  • Park, Jong-Bu
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.2
    • /
    • pp.235-241
    • /
    • 2011
  • This study was performed to investigate the characteristics of nutrient removal of municipal wastewater in the submerged membrane bioreactor by addition of alum directly into aerobic tank. Membrane bioreactor consists of three reactors such as two intermittent anaerobic tanks and the aerobic tank with hollow fiber membrane. The removal efficiencies of $COD_{cr}$, BOD, SS, TN and TP on the membrane bioreactor were 94.0%, 99.1%, 99.9%, 66.9%, and 58.9%, respectively. In addition, The removal efficiencies of $COD_{cr}$, BOD, SS, TN and TP on the membrane bioreactor with alum addition were 93.4%, 99.0%, 99.9%, 63.2%, and 96.8%, respectively. There was little difference between them on the nutrient removal efficiencies except phophorus removal. The estimated sludge production, specific denitrification rate, specific nitrification rate and phosphorus removal content on the membrane bioreactor were 1.76 kgTSS/d, $0.055mgNO_3-N/mgVSS{\cdot}d$, $0.031mgNH_4-N/mgVSS{\cdot}d$, and 0.095 kgP/d, respectively. And The estimated sludge production, specific denitrification rate, specific nitrification rate and phosphorus removal content on the membrane bioreactor with alum addition were 2.90 kgTSS/d, $0.049mgNO_3-N/mgVSS{\cdot}d$, $0.030mgNH_4-N/mgVSS{\cdot}d$, and 0.160 kgP/d, respectively. The alum content added was 1.7 molAl/molP on an average. The increasing ratio of tran-membrane pressure on the membrane bioreactor was $0.0056kgf/cm^2{\cdot}compared$ to $0.0033kgf/cm^2{\cdot}d$ on the membrane bioreactor with alum addition. There was a slightly reduction effect on membrane fouling by alum addition.

Change in Influent Concentration of Domestic Wastewater from Separated Sewer and Biological Nitrogen and Phosphorus Removal of a Full Scale Air-vent SBR (분류식 하수관거로의 전환시 유입하수의 성상 변화 및 선회와류식 SBR공법의 처리 특성)

  • Lee, Jang-Hee;Kang, Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.1
    • /
    • pp.63-70
    • /
    • 2012
  • This study was carried out to investigate change in influent concentration of domestic wastewater flowed from a newly constructed separate sewer system (SSS) and biological nutrients removal efficiency of a full scale Air-vent sequential batch reactor (SBR, $600m^3/d$). The average concentration of $BOD_5$, SS, T-N and T-P from SSS were 246.5 mg/L, 231.6 mg/L, 42.974 mg/L, 5.360 mg/L, respectively which corresponds to 2.2times, 1.2times, 1.8times and 2.1times higher than those from the conventional combined sewer system (CSS). The removal efficiency of $BOD_5$, SS, T-N, and T-P for the Air-vent SBR operated with influent from SSS averaged 99.1%, 99.0%, 91.2%, and 93.5%, respectively. Especially the respective nitrogen and phosphorus removal was 15% greater than that of the SBR operated with influent from CSS. Simultaneous nitrification and denitrification (SND) was observed in an aerobic reactor(II) as a result of DO concentration gradient developed along the depth by the Air-vent system. In order to achieve T-N removal greater than 90%, the C/N ratio should be over 6.0 and the difference between $BOD_5$ loading and nitrogen loading rate be over 100 kg/day (0.130 kg $T-N/m^3{\cdot}d$). Even with high influent T-P concentration of 5.360 mg/L from SSS (compared with 2.465 mg/L from CSS) T-P removal achieved 93.5% which was 15.5% higher than that of the SBR with influent from CSS. This is probably due to high influent $BOD_5$ concentration from SSS that could provide soluble carbon source to release phosphorus at anaerobic condition. In order to achieve T-P removal greater than 90%, the difference between $BOD_5$ loading and phosphorus loading rate should be over 100 kg /day (0.130 kg $T-N/m^3{\cdot}d$).

Study on the Performance of Constructed Wetland System for Sewage Treatment (인공습지 오수처리시설의 처리성능에 관한 연구)

  • 윤춘경
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.4
    • /
    • pp.96-105
    • /
    • 2000
  • Field experiment was performed from August 1996 to December 1999 to examine the performance of constructed wetland system for wastewater treatment in rural area. The constructed wetland system was installed in Konkuk University and the effluent from septic tank of school building was used as an influent to the treatment basin. The treatment basin was composed of sand bed with planted reed. From August 1996 to June 1998 the hydraulic loading rate was fixed with about 15.63cm/day and theoretical detention time was 1.38 days, and from July 1998 to December 1999 the hydraulic loading rate was about 6.25cm/day and theoretical detention time was 3.5days. It worked continuously even during winter time, and the sewage flowed without freezing even when average daily air temperature was below -1$0^{\circ}C$. Average removal rate of BOD , COD, and SS was about 70%, T-P removal rate was about 50.8% , and T-N removal rate was 23.9%. The reason for poor T-N removal might be due to high influent concentration and short retention times. At the later years BOD and COD removal rates were increased , and SS and T-P removal rates did not change significantly , but T-N removal rates were decreased. The effluent of the wetland system often effluent water quality standards for sewage treatment plant, therefore, further treatment would be required if the effluent need to be discharged to the public water. Wetland system involves relatively large land area and could be suitable for rural area. Therefore, utilization of reclaimed sewage for agricultural purpose or subsequent land treatment is recommended as a ultimate disposal of sewage for agricultural purpose or subsequent land treatment is recommended as a ultimate disposal of sewage in rural area.

  • PDF