• 제목/요약/키워드: BNR

검색결과 114건 처리시간 0.027초

유동상 생물막법을 적용한 BNR공법에서의 인제거 영향인자 (Factors affecting Phosphorus removal in BNR process applied Moving Bed Biofilm)

  • 박운지;김동욱;이찬기
    • 산업기술연구
    • /
    • 제26권B호
    • /
    • pp.3-10
    • /
    • 2006
  • In this study, the of MBBR(moving bed biofilm reactor) process for Phosphorus Removal efficiency depending on seasons and the factors affecting phosphorus removal efficiency in the process is evaluated. As a result of experiment, T-P removal efficiency has its highest value in winter, (80.8%). and T-P removal efficiency has its lowest value in autumn, (49%). Optimum SRT for Phosphorus Removal revealed is about 8.8 days and process performs more efficiently as the temperature decreases. It is accepted that nitrate to anaerobic zone is affecting the Phosphorus removal process. With increasing the organic loading rate, Phosphorus removal efficiency also increases. Also, an experiment has been conducted to find out the highest efficiency according to Media existence and it has revealed that Media addition provides better phosphate removal.

  • PDF

2단간헐폭기 및 유로변경 간헐폭기 활성슬러지 시스템을 이용한 도시하수 처리 (Performances of Intermittently Aerated and Dynamic Flow Activated Sludge Process)

  • 원성연;민경국;이상일
    • 환경위생공학
    • /
    • 제13권1호
    • /
    • pp.26-31
    • /
    • 1998
  • Removal of nitrogen and phosphate in wastewater is concerned to important for the prevention of eutrophication in receiving water and lake. Conventional activated sludge system designed for organics removal can be retrofitted only by modification of aeration basin to maintain anaerobic and aerobic state. Biological nutrient removal processes(BNR) such as Bardenpho, A$^{2}$/O, UCT, VIP were generally used for the treatment of wastewater. However these BNR processes used in large scale WWTP were not suitable in small scale WWTP(i.e., package type WWTP) due to relatively large fluctuation of flow rate and concentration of pollutants. The purpose of this research was to develop the compact, effective and economical package type WWTP for the removals of carbon and nitrogen in small scale wastewater. Intermittently aerated activated sludge system (IADFAS) were investigated for removal of nitrogen in both domestic wastewater, Bardenpho process was also evaluated. Nitrogen removal of IAAS, IADFAS, Bardenpho were 75, 77 and 67%, respectively.

  • PDF

다화자잡음이 말더듬의 비율과 말속도에 미치는 영향 (The Noise Effect on Stuttering and Overall Speech Rate: Multi-talker Babble Noise)

  • 박진;정인기
    • 말소리와 음성과학
    • /
    • 제4권2호
    • /
    • pp.121-126
    • /
    • 2012
  • This study deals with how stuttering changes in its frequency in a situation where adult participants who stutter are exposed to one type of background noise, that is, multi-talker babble noise. Eight American English-speaking adults who stutter participated in this study. Each of the subjects read aloud sentences under each of three speaking conditions (i.e., typical solo reading (TSR), typical choral reading (TCR), and multi-talker babble noise reading (BNR)). Speech fluency was computed based on a percentage of syllables stuttered (%SS) and speaking rate was also assessed to examine if there was significant change in rates as a measure of vocal change under each of the speaking conditions. The study found that participants read more fluently both during BNR and during TCR than during TSR. The study also found that participants did not show significant changes in speaking rate across the three speaking conditions. Some discussion was provided in relation to the effect of multi-talker babble noise on the frequency of stuttering and its further speculation.

연속회분식 생물막 반응기(Sequencing Batch Biofilm Reactor)를 이용한 수중의 유기물, 질소 및 인의 동시 제거에 관한 연구 (A Study on the Biological Organic, Nitrogen and Phosphorus Removal in Sequencing Batch Biofilm Reactor)

  • 박민정;김동석
    • 한국환경보건학회지
    • /
    • 제30권2호
    • /
    • pp.84-91
    • /
    • 2004
  • Biological nutrient removal(BNR) from wastewater was performed by adopting various process configurations. The simultaneous biological organics, phosphorus and nitrogen removal of synthetic wastewater was investigated in a sequencing batch biofilm reactor (SBBR). The other reactor was operating as a reference, without biofilm being added. The cycling time in SBR and SBBR was adjusted at 12 hours and then certainly included anaerobic and aerobic conditions. Both systems has been operated with a stable total organic carbon(TOC), nitrogen and phosphorus removal performance for over 90 days. Average removal efficiencies of TOC and total nitrogen were 83% and 95%, respectively. The nitrification rate in SBR was higher than that in SBBR. On the contrary, the denitrification rate in SBBR was higher than that in SBR. The phosphorus release was occurred in SBBR, however, not in SBR because of the inhibition effect of NO$_3$$^{[-10]}$ .

생물학적 고도처리공법에 적용된 두 형태의 장방형 이차침전지 성능 파악 (Evaluating Two Types of Rectangular Secondary Clarifier Performance at Biological Nutrient Removal Facilities)

  • 이병희
    • 상하수도학회지
    • /
    • 제27권5호
    • /
    • pp.561-570
    • /
    • 2013
  • There are two types of rectangular secondary clarifier at biological nutrient removal (BNR) facility to settle MLSS; conventional activated sludge secondary clarifier and Gould Type I clarifier. In this study, the performances of two types at respective biological nutrient removal facility are compared using weekly operational data. Surface Overflow Rate (SOR), Surface Loading Rate (SLR), Sludge Volume Index (SVI), secondary effluent SS concentration are studied. It has found that Gould Type I has 3.5 times less average secondary effluent SS concentration that is 2.4 mg/L than that of conventional activated sludge secondary clarifier. Both SOR and SLR have shown little effect on secondary effluent SS concentrations at Gould Type I clarifier in contrary that SOR affects the secondary effluent SS concentrations at conventional activated sludge rectangular secondary clarifier. From this study, it is recommended that Gould Type I must be considered for secondary clarifier when BNR plant is designed.

폐수처리장치에서의 아질산염 산화 세균 군집 분석 (Community Analysis of Nitrite-Oxidizing Bacteria in Lab-Scale Wastewater Treatment System)

  • 정순재;이상일;이동훈
    • 미생물학회지
    • /
    • 제44권1호
    • /
    • pp.29-36
    • /
    • 2008
  • 질소는 하수처리과정에서 제거되어야 하는 주요 오염물질 중의 하나이며, 세균 군집을 이용한 고도처리 시스템에서 생물학적 질소제거는 중요한 기술이다. 질산화반응은 생물학적 질소제거 시스템의 첫 단계로 미생물에 의해 진행된다. 암모니아는 암모니아산화세균에 의해 아질산염으로 산화되며, 그 후에 아질산염은 아질산염 산화세균에 의해 질산염으로 산화된다. 실험실 규모의 생물학적 질소제거 시스템인 변형된 eBAF 시스템, Nutrient removal laboratory 시스템과 반추기법을 적용한 rSBR 시스템의 질산화반응조 시료에서 16S rRNA 유전자를 이용한 terminal restriction fragment length polymorphism (T-RFLP) 방법으로 아질산염 산화세균군집을 분석하였다. 제한효소로 형성된 단편의 클러스터분석에서 Nitrobacter 군집은 각각의 폐수처리 시스템에 따라 군집의 차이가 있음이 나타났다. 그러나 Nitrospira 군집의 클러스터분석에서는 액체와 담체의 서식지 환경 차이에 의해 군집이 구분되었다.

EQPS 모델을 이용한 하수처리장 운전 평가 (Evaluation of Operational Options of Wastewater Treatment Using EQPS Models)

  • 유호식;안세영
    • 한국도시환경학회지
    • /
    • 제18권4호
    • /
    • pp.401-408
    • /
    • 2018
  • 하수처리 공정모델링 소프트웨어인 EQPS(Effluent Quality Prediction System, Dynamita, France)를 적용하여 A하수처리시설 생물반응조 설계의 적합성을 분석하였다. A하수처리장은 친수용수 수준의 목표수질을 준수하기 위하여 이차침전지 유출수 설계농도를 총질소와 총인, 각 10 mg/L, 1.8 mg/L로 설정하여 설계하였다. 4-Stage BNR 공정인 반응조의 체류시간은 총 9.6시간으로 전무산소조 0.5, 혐기조 1.0, 무산소조 2.9, 호기조 5.2시간이었다. 동절기 공정모델링 결과 친수용수 수준의 목표수질을 만족하기 위하여 혐기조의 체류시간을 0.2시간 늘렸고 당초 설계조건이던 외부탄소원 비상시 주입을 상시적으로 주입해야 하는 것으로 조사되었다. 모델링 결과의 왜곡을 배제하기 위하여 소프트웨어 제조사가 제시한 one step nitrification denitrification 모델의 Default 계수를 사용하였다. 공정모델링은 대체적으로 최적의 상태를 제시하기 때문에 생물반응조 여유율을 고려하면 4-Stage BNR의 체류시간은 9.8시간보다 증가시켜야 한다. 하수처리장 설계단계에서 공정 모델링의 정확한 사용은 하수처리장 건설 후 처리성능과 효율의 안정성을 담보할 수 있는 방법이므로 설계단계에서 철저한 평가가 필요하다.

활성 탈질미생물 Bio-bead의 특성

  • 박경주;조경숙;이민규;이병헌;김중균
    • 한국생물공학회:학술대회논문집
    • /
    • 한국생물공학회 2003년도 생물공학의 동향(XII)
    • /
    • pp.378-381
    • /
    • 2003
  • 질소, 인 등의 영양소 제거를 위한 고정화 미생물을 이용한 새로운 BNR 시스템 개발을 위해 탈질능력이 뛰어난 균주를 순수분리하고 여러 담체를 사용하여 제조된 활성 bio-bead의 특성을 알아보았다. 4종류의 탈질 능력이 뛰어난 균주를 순수분리 하였고, 12% PVA 담체로 만든 bead가 가장 좋은 탈질능력을 보였다. Cell loading 농도는 200 mg/ml일 때 bead의 활성이 최적을 나타내었으며, bead의 size에 의한 탈질효율에는 유의적 차이가 없었다. 제조된 bead는 약 4 batch실험 후 최대 탈질율을 나타내었으며, 약 25번의 batch실험까지는 탈질능력을 그대로 유지하고 cell leaking 양도 약 $10^3$ CFU/ml 정도 였으나, 그 이후로는 bead 형태도 변하면서 cell leaking이 증가하고 탈질능력도 감소되었다.

  • PDF

2단 간헐 포기조의 포기/비포기 시간비에 따른 영양염류 제거특성 (Nutrients removal on Oxic/Anoxic time ratio in 2-stage-intermittent-aeration reactor)

  • 김홍태;신석우;오상화;권성현
    • 한국환경과학회지
    • /
    • 제13권7호
    • /
    • pp.675-680
    • /
    • 2004
  • This study was conducted to remove organics and nutrients using 2 stage intermittent aeration reactor. First reactor, using suspended microbial growth in intermittent aeration instead of anaerobic reactor in the typical BNR process, used minimum carbon source to release P, and it was possible to reduce ammonia loading going to second reactor. In the second reactor, using moving media intermittent aeration, it was effective to reduce nitrate in non-aeration time by attached microorganisms having long retention time. In aeration time, nitrification and P uptake were taken place simultaneously. From the experiment, two major results were as follows. First, the removal of organics was more than 90%, and optimum aeration/non-aeration time ratio for organic removal was corresponded with aeration/non-aeration time ratio for nitrogen removal. Second, in the first reactor, optimum aeration/non-aeration time ratio was 15/75 (min.) because it was necessary to maintain 75 min. of non-aeration time to suppress of impediment of return nitrate and to lead release of phosphate. In the second reactor, optimum aeration/non-aeration time ratio was 45/90 (min.).