The objective of this study was to investigate difference in nitrogen, organic, phosphorus and $NH_3$-N removal efficiency according to organic loading, comparing M-DEPHANOX process which has two nitrification reactor with M-eBNR process which has one nitrification reactor. As a result of this study, $NH_3$-N removal efficiency of M-DEPHANOX and M-eBNR resulted in average level of 91.8%, 96.9%, respectively. M-DEPHANOX and M-eBNR processes showed high removal efficiency in view of $NH_3$-N removal efficiency. Comparing organic removal efficiency by M-DEPHANOX and M-eBNR processes, the average removal efficiency in terms of TCOD, SCOD was 84.1%, 78.2% and 83.4%, 75.6%. Also, the results that observed about $NH_3$-N removal efficiency regarding organic loading revealed that nitrification reactor of RBC type are little influenced by flowing organic without precipitating at settling tank. Therefore, although inflow characteristics of municipal wastewater changes, M-eBNR process appeared to remove $NH_3$-N reliably.
하$\cdot$폐수처리시설의 설계에서 컴퓨터 모델링을 사용하는 목적은 처리공정을 최적화 하기 위함이다. 기존의 하$\cdot$폐수처리장을 생물학적 질소$\cdot$인 제거 (이하 BNR) 시설로 개조하거나 신설 BNR 공정을 설계하려면 계획 시설에 대한 타당성 조사를 수행해야 하는데, 여러가지 처리공법을 분석하여 처리공정을 선정하고 선정된 공정의 성능과 운영방법, 그리고 시설비용 및 운영비용을
Journal of Korean Society of Environmental Engineers
/
v.22
no.10
/
pp.1757-1763
/
2000
To consider the nutrient removal characteristics of BNR process activating soil microorganisms under the influence of DPB and to clear the characteristics of DPB under anoxic condition was investigated in the this study. The batch tests were conducted using sludge sampled from the BNR process activating soil microorganisms during operation periods. The results of this study were summarized as follows: - The DPB(Denitrifying Phosphorus removing Bacteria) performing denitrification and phosphorus uptake in the anoxic phase plays an important role in removing nitrogen and phosphorus in the BNR process activating soil microorganisms. - The PUR(Phosphorus Uptake Rate) of DPB in the anoxic phase was to be about 50% of PUR in the aerobic phase. - The DPB in the BNR process turned out to be increasing nutrient removal efficiency of BNR process.
Journal of Korean Society of Environmental Engineers
/
v.22
no.5
/
pp.895-905
/
2000
This study was performed to investigate the removal efficiencies of pollutants at various filtration rates and the quality of the filtered water along the depth of filter media during treatment of a BNR process effluent by a dual-media gravitational rapid filtration. The results of the experiments at filtration rates of 200, 300 and 400 m/day using the effluent of a pilot scale 4-stage BNR plant showed that turbidity of the filtered water was below 2.6 NTU, satisfying the Korean standard for water for reuse. Even though the SS removal efficiency deteriorated as the filtration rate increased, the average SS concentration of the filtered water was 1.3 mg/L at all filtration rates. Simultaneous biological nitrification and denitrification was observed with nitrification efficiencies of 17.4, 18.8 and 14.3%, and denitrification efficiencies of 32.3, 27.7 and 21.4% respectively at filtration rates of 200, 300 and 400 m/day. At the latter period of each filtration cycle, the effluent T-P concentration was higher than influent T-P concentration by 6.1 to 21.4% due to phosphorous release under DO-deficient condition.
To understand the efficient process of biological nitrogen removal (BNR) system, the structure of bacterial communities in nitrification reactors was analyzed using PCR and terminal restriction fragment length poly morphism (I-RFLP) methods. In this study, we used an advanced treatment system with plotting media, Nutrient Removal Laboratory system, or the rumination type sequencing batch reactor (SBR) system. The terminal restriction fragments of ammonia-oxidizing bacteria (AOB) and other $\beta-proteobacteria$ were observed in all of three BNR systems. The nucleotide sequence analysis of terminal restriction fragments showed that Nitrosomonas and Nitrosolobus were major populations of AOB in SBR system, whereas uncultured $\beta-proteobacteria$ and Cardococcus australiensis were the predominant groups in other two BNR systems. Also the SBR system may be more efficient to enrich AOB. These results indicate that the different structure of bacterial community may be developed depending on the wastewater treatment systems, although the same influent is used.
A BNR comprehensive performance evaluation (BNR CPE) system was established employing system-oriented evaluation methodology for biological nutrient removal (BNR) processes based on the CPE techniques developed by U.S. EPA for evaluation of conventional biological processes. The BNR CPE system applied to five domestic BNR plants adopting $A^2/O$ process confirmed that all target plants except the smallest one had not any serious defective performance and process stability was enhanced with increasing plant size. The system also clearly verified relatively poor performances in anoxic reactors without exception mainly due to influent carbon limit rather than functional defect. Consistent good performances were confirmed even during both winter season and wet weather generally known to be difficult to achieve satisfactory removals. Presentation of evaluation results by modified radar chart system simplified and clarified the evaluation and analysis procedures. The BNR CPE system could not only discover readily the causes of present and prospective poor performances but also facilitate the suggestion of their optimization options. Mutual effect and cause-and-effect among operation parameters and unit processes were also found easily using the evaluation system. The system justified that the adverse effect of defective operating parameters could be compensated by other favorable parameters, especially in anaerobic and anoxic reactors as well as during the winter season.
Kim, Mi-Hwa;Lee, Ji-Hyung;Chun, Yang-Kun;Park, Tae-Joo
Journal of Korean Society of Environmental Engineers
/
v.22
no.6
/
pp.1093-1101
/
2000
The object of this study was to develop new BNR process using fixed-biofilm which could be applied to retrofit the existing wastewater treatment plant or to introduce as tertiary treatment plant. To achieve complete denitrification from typical raw sewage in Korea, external carbon source must be supplied because $SCOD_{cr}/T-N(NH_4{^+}-N+NOx-N)$of raw sewage was lower than other countries. In this study, the ratio of $SCOD_{cr}/NH_4{^+}-N$ was 2.49 and the influent $NH_4{^+}$-N concentration during the experimental period was varied from 25 to 37 mg/L. To enhance nitrogen removal from the sewage, the two processes using fixed biofilm were adopted as R-Hanoxic/mid.settler/aerobic/anoxic/ aerobic) and R-2(aerobic/mid.settlerlanoxic/anoxic/aerobic), respectively. In the comparison of $NH_4{^+}$-N, T-N effluent quality and T-N removal efficiency in both processes without external carbon source, R-1 process was better than R-2 process for nitrogen removal from raw sewage. With respect to $SCOD_{cr}$/NOx-N ratio and total nitrogen removal in each anoxic reactor of two processes, R-1's was more effective than R-2's for distributing organic matters of raw sewage. In the both processes using fixed biofilm, the amount of required alkalinity to remove unit $NH_4{^+}$-N were 5.18 and 5.76($g{\cdot}CaCO_3/g{\cdot}NH_4{^+}-N_{removed}$), respectively and were lower than activated sludge BNR process(7.14).
Park, Noh-Back;Park, Sang-Min;Choi, Woo-Young;Jun, Hang-Bae
Journal of Korean Society on Water Environment
/
v.25
no.1
/
pp.18-25
/
2009
Nitrogen removal and methane production from piggery wastewater were investigated in two-phase anaerobic digestion (TPAD) coupled with biological nitrogen removal (BNR) process at $35^{\circ}C$. Methane production rate was about $0.7L/L{\cdot}day$ at organic loading rate (OLR) of $1.2g{\cdot}TCOD/L{\cdot}day$ in methanogenic UASB. Conversion efficiency of the removed TCOD into methane in UASB was as high as 72% and overall TCOD removal efficiency in this system was over 97%. Ammonia nitrogen were stably removed in BNR system and overall efficiency were 98%. With recirculation of the nitrified final effluent to TPAD, nitrogen oxides were completely removed by anaerobic denitrification in the acidogenic reactor, which did not inhibit the acidogenic activities. Overall TN removal efficiency in the TPAD-BNR system was as high as 94%.
Kim, Hyo-Sang;Park, Jong-Woon;Seo, Jung-Won;Park, Chul-Hwi
Journal of Korean Society of Environmental Engineers
/
v.22
no.3
/
pp.587-595
/
2000
The most problems of domestic sewage for BNR(Biological Nutrients Removal) process are deficiency of carbon source and low C/N ratio. Primary sludge fermentation is seemed to be one of the best solutions producing biodegradable organic substrates. Soluble organic materials from sludge fermentation are mainly SCFAs(Short-Chain Fatty Acids) with 2~5 carbon atoms. In this research, it was attempted to apply $A_2/O$ process with the side-stream acid fermenter to improve the nutrients removal efficiency. The result showed that proper SCFAs production is about 3.000mg/L with SRT of 4~5 days. SCFAs yield of approximately 0.10~0.16 mg SCFAs(as COD) per mg of primary sludge(as COD) were achieved. The ratio of acetic. propionic. butyric and valerie acid were 1, 0.7, 0.5 and 0.6. Significant improvements of nutrients removal over 70% in BNR process were observed. thus will reduce the demand for chemical dosing to increase nutrients removal efficiency. When the fermentate was entered $A_2/O$ process, the ratio of phosphate release to substrate uptake amounts to $0.34gPO_4-Pg^{-1}COD$.
Journal of Korean Society of Environmental Engineers
/
v.32
no.1
/
pp.97-104
/
2010
At present, the biological nutrient removal (BNR) process for removal of nitrogen and phosphorus is being constructing to keep pace with the reinforced standard of effluent quality and the traditional activated sludge process of preexistence is being promoting to retrofit. At the most case of retrofitting, processes are subjected to be under consideration as alternative BNR process for retrofitting. However, process evaluation methods are restricted to compare only treatment efficiency. Therefore, when BNR process apply, process evaluation was needed various method for treatment efficiency as well as sludge production and aeration cost, and all. In this study, the evaluation method of alternative process was suggested for the case for retrofitting S wastewater treatment plant which has been operated the standard activated sludge process. Three BNR processes for evaluation of proper alternatative process were selected and evaluated with suggested method. The selected $A^2$/O, VIP and DNR processes were evaluated using the mathematical model which is time and cost effective as well as gathered objective evaluation criteria. The evaluation between 5 individual criteria was possible including sludge production and energy efficiency as well as treatment performance. The objective final decision method for selection of optimal process was established through the fuzzy inference.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.