ICT-BIM 기반 건설프로젝트 품질부적합 관리 시스템 (ICT-BIM based Quality Nonconformity Control Method for Construction Project)

  • 손상혁;이형국;배상희;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2016
  • This paper presents an automated construction quality nonconformity control method. Existing quality control process are confined attributed to the dependence on human quality personnels. They are inefficiency for continuos quality improvements and may cause project schedule delays when any nonconformity is handled timely fashion. For sure, It is important to identify the add hoc quality nonconformity control processes and to implement them into an automated system that controls its' work-flow. It would be desirable to develop the construction project quality nonconformity control system using Building information modeling(BIM) and Information and Communications Technologies(ICT). It may provide an effective platform to prevent quality issues that exist in the existing quality management practice.

  • PDF

정점데이터기반 분할기법을 활용한 BIM모델의 활용 방안 연구 (A Study on the Utilization of BIM Model using Vertex Data-based Division Method)

  • 황재영;이재희;강인석
    • 토지주택연구
    • /
    • 제14권1호
    • /
    • pp.123-134
    • /
    • 2023
  • 설계단계에서 작성된 BIM모델은 후속 단계 전환을 통한 사전검토 및 공정관리 등에 활용될 수 있다. 그러나 실제 BIM적용 사례들의 경우 설계단계와 시공단계의 활용 목적성 등의 차이로 인해 설계단계의 모델의 활용이 아닌 시공단계에 적합한 새로운 모델을 작성하는 등 추가 작업이 요구된다. 따라서 본 연구에서는 시공단계에서 재작성 없이 설계단계 BIM모델의 재활용 방안으로 객체 분할을 제안하며, 이를 위해 객체의 기본요소인 정점 데이터를 기반으로 분할 면을 생성하여 객체 분할에 활용하는 방법론을 제시한다. 또한 실제 BIM모델에 적용 및 분할 객체의 4D CAD 시스템 연동과 기존 분할 방법과의 비교를 통해 활용성을 검증한다.

슬래브 철근 물량 산출 자동화 알고리즘 개발 (Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar)

  • 김수환;김선국;서상욱;김상철
    • 한국건설관리학회논문집
    • /
    • 제24권5호
    • /
    • pp.52-62
    • /
    • 2023
  • 본 연구의 목적은 정착 길이, 표준 후크 및 이음 길이와 같은 관련 규정을 준수하면서 슬래브 철근의 정확한 절단 길이를 산출하는 자동화된 알고리즘을 제안하는 것이다. 제안된 알고리즘은 일반적으로 외주를 통해 수작업으로 진행하던 기존 철근 물량 산출 프로세스를 개선하는 것을 목표로 한다. 입찰 단계부터 정확한 철근 수량 데이터를 BBS(Bar Bending Schedule) 수준으로 제공함으로써 물량 산출의 불확실성을 제거하고 외부 의존도를 낮출 수 있다. 또한, 알고리즘을 통해 정확한 물량을 조기에 산출하는 경우 건설사는 경쟁력 있고 최적화된 입찰을 미리 준비할 수 있어 계약 협상 시 이익률을 높일 수 있다. 제안된 알고리즘은 견적, 예산, BBS 생성 등 다양한 프로세스에서 중복되는 업무를 간소화할 뿐만 아니라 계약 후 구조 도면 변경에도 유연하게 대처할 수 있다. 특히, 제안된 알고리즘을 BIM과 결합하는 경우 시공 초기 단계에서 BIM을 적용할 때 발생하는 기술적 문제를 해결할 수 있으며, REVIT 기반 패밀리 파일로 구축된 알고리즘의 수식과 형상 코드는 실무에서 상당한 시간과 인력 절감에 기여한다.

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

레서피(Recipe) 기반의 견적 방법을 이용한 5D CAD 시스템 (Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system)

  • 최철호;박영진;한성훈;진상윤
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.154-160
    • /
    • 2006
  • 건설산업분야에 CAD시스템이 도입된 이래 CAD로 작성된 도면으로부터의 물량산출에 관한 연구가 지난 20여 년간 많은 관심 속에 국내외 적으로 지속되어 왔으나, 성과는 그다지 만족스럽지 못하였다. 특히 3D CAD 시스템을 활용한 설계 및 물량산출은 제조업에서는 괄목할 만한 성과를 거두고 있음에도 불구하고 건설 산업에서는 3D CAD 시스템에 의한 물량산출시스템의 개발 및 운영에 많은 어려움이 있다. 3D CAD 시스템에서는 3D 라이브러리(3D Object)의 구축 및 활용이 매우 중요하며 건설 산업의 특성상 설계과정에서 발생하는 신규 부재(3D object)에 대한 신속한 지원이 없이는 설계 및 물량산출에 3D CAD 시스템의 활용에 많은 어려움이 있다. 또한 3D CAD 모델로 부터의 물량산출을 지원하는 시스템은 개념설계(schematic design)단계에서도 개략견적이 가능하여야 하며, 상세설계(detailed design) 단계 및 시공도면작성(construction design)단계에 이르는 각 단계마다 물량산출 및 비용 산출이 가능하여야 한다. 다음으로는 설계과정 및 의사결정단계를 거치면서 계속 진화하는 설계변경(revision)에 따라 유연하게 물량 및 비용 산출이 가능하여야 한다. 본 연구에서는 3D 모델을 기반으로 한 상용화된 5D(3D+cost+schedule) CAD 시스템인 컨스트럭터(Constructor)의 기본개념을 살펴보고 특히 레서피(Recipe)기반의 물량산출 모듈에 대한 설명 및 시범 프로젝트 적용결과에 대해 검토하고 앞으로의 기대효과 및 건설 산업에서의 3D CAD 기반 응용시스템 연구 방향에 대해 살펴보고자 한다.

  • PDF