A BIM-based Automated Framework for Formwork Planning on Construction Sites

  • Xu, Maozeng;Mei, Zhongya;Tan, Yi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.52-61
    • /
    • 2017
  • Considering its significant impact on the cost and schedule of construction projects, formwork as one part of temporary facility categories in construction should be arranged precisely. Current practice in the formwork planning is often conducted manually and repetitively, causing low efficiency and time waste. This study proposes an automated framework to generate more accurate and detailed formwork plans by utilizing information from building information modeling (BIM) considering the adequate geometric and semantic information provided by the BIM model. The dimensions and quantities information of elements in a building can be extracted automatically. Then, a rule is prepared for calculating the required forms erected around elements based on the contact areas. Finally, an algorithm of integrating first fit decreasing (FFD) with coordinated bottom left (CBL) is applied to automatically generate the formwork plan. The BIM-based automated planning framework is demonstrated by an illustrative example. The results show that the proposed framework can generate the formwork plan accurately and automatically, and significantly improve the efficiency in the formwork plan and reuse.

  • PDF

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

Application of BIM-integrated Construction Simulation to Construction Production Planning

  • Chang, SooWon;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.639-640
    • /
    • 2015
  • Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.

  • PDF

What is a Critical Factor for Determining the Issue-Resolving Time in the BIM-based Coordination Process?

  • Jang, Sejun;Lee, Dongmin;Lee, Ghang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.392-395
    • /
    • 2015
  • This study analyzes critical factors that affect issues of resolving time in BIM-based coordination using a case study. According to recent buildings that are meant to be more complex, BIM-based design coordination is regarded as an essential stage of the project delivery process. In the design coordination phase, a relocation of architectural, structural, mechanical, and electrical elements is conducted to avoid interference. In addition, the procedure of the development of each element in detail for the actual construction is carried out. Delays in coordination can affect delays in the entire delivery schedule of the project, and therefore many researches have focused on efficient coordination methods and how to shorten the period. In this study, we conducted a detailed analysis of the issue-resolving process using a case study, and found out that the participation of decision-makers for issue-resolving and the physical combination of trades affect delays in coordination time. In particular, we proposed the concept of organizational relation, indicating the level of decision-makers for issue-resolving, and the concept of physical relation, indicating the physical complexity of the issue, and we analyzed the effects of coordination delays.

  • PDF

The Research on the Managing Method for Reasonable Amount of Inventory in Construction Site Using Inventory Model and BIM Data. (재고모형과 BIM 데이터를 활용한 건설현장의 적정 재고 관리방안에 대한 연구)

  • Kim, Ban-Seok;Park, Byung Joo;Park, Jung-Lo;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.119-120
    • /
    • 2012
  • The management for materials and inventory is one of the factors which are considered the most for profits of a business in almost all industrial fields. Resource procurement which occupies more than 40% of an overall construction cost has a strong relationship with profits of a business but it is regarded as a work for a manager rather than for a technician. It makes the importance of resource procurement relatively low and slows down the development of workings. As the construction project becomes more larger and complicated, effective management for materials are directly affecting the profits of a business. Therefore, this research works on finding an economical managing method for materials according to a characteristic of construction project based on accurately forecasted BIM data. Finding a reorder point by using BIM data which contains an accurate data for schedule and material enables a better management for materials and provides more accurate data on matters which were used to be determined by an intuition of a manager.

  • PDF

Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study (BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구)

  • Won, Jongsung;Ham, Sungil;Jang, Sejun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Development of 4D System Linking AR and 3D Printing Objects for Construction Porject (AR과 3D 프린팅 객체를 연계한 건설공사 4D 시스템 구성 연구)

  • Park, Sang Mi;Kim, Hyeon Seung;Moon, Hyoun Seok;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.2
    • /
    • pp.181-189
    • /
    • 2021
  • In order to increase the practical usability of the virtual reality(VR)-based BIM object in the construction site, the difference between the virtual image and the real image should be resolved, and when it is applied to the construction schedule management function, it is necessary to reduce the image gap between the virtual completion and the actual completion. In this study, in order to solve this problem, a prototype of 4D model is developed in which augmented reality (AR) and 3D printing technologies are linked, and the practical usability of a 4D model linked with two technologies is verified. When a schedule simulation is implemented by combining a three-dimensional output and an AR object, it is possible to provide more intuitive information as a tangible image-based schedule information when compared to a simple VR-based 4D model. In this study, a methodology and system development of an AR implementation system in which subsequent activities are simulated in 4D model using markers on 3D printing outputs are attempted.

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF