• Title/Summary/Keyword: BIM based quotation

Search Result 2, Processing Time 0.018 seconds

Automated Digital Engineering Modeling of Prefabricated Bridges with Parameterized Straight Alignments (직선교량에 대한 디지털엔지니어링 모델의 선형연동 프로그램 개발)

  • Choi, Jae-Woong;Kang, Jeon-Yong;Kim, Hyun-Min
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.40-49
    • /
    • 2020
  • This report describes the development of a program that can be linked to an alignment and extracts related information using a prefab structured digital engineering model. The subject bridge was set as a straight alignment, the Superstructure type as Precast girder and the Substructure type as Precast pier and Cast-in-situ Abutment. We identified the variables required to create a digital engineering model and reviewed them to create the digital engineering model by entering them as numerical values in the program. In addition, it is configured so that the variables linked to the alignment can be entered numerically. The quantity takeoff can be calculated when the design is complete. The purpose of the program development presented in this report is to enable the designers to select the optimal alternative by designing a bridge that best fits their current situation, extracting the relevant information and then by providing it to the manufacturer and construction company.

Study on the Satisfaction Analysis for Development of Construction Estimating Manager based on 3D Data (BIM기반 건축적산 매뉴얼 개발을 위한 만족도 분석에 관한 연구)

  • Choi, Chang-Hoon;Lee, Junbok;Han, Choong-Hee;Soh, Ji-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.222-223
    • /
    • 2014
  • According to the improvement of IT technology, an enhanced efficiency of management system in the construction industry is expected since a quotation system with BIM (Building Information Modeling) technique effectively estimates construction materials. For an enhanced efficiency of management system, related guidelines, standards, and manuals based on BIM are required, but the lack of this information causes difficulty to utilize in practice. In the paper, the satisfaction analysis was performed in order to promote the completeness of construction estimating manager that can be presented criteria and details of BIM-based quantity-takeoff, classification criteria.

  • PDF