• 제목/요약/키워드: BIM based quotation

검색결과 2건 처리시간 0.016초

직선교량에 대한 디지털엔지니어링 모델의 선형연동 프로그램 개발 (Automated Digital Engineering Modeling of Prefabricated Bridges with Parameterized Straight Alignments)

  • 최재웅;강전용;김현민
    • 한국BIM학회 논문집
    • /
    • 제10권4호
    • /
    • pp.40-49
    • /
    • 2020
  • This report describes the development of a program that can be linked to an alignment and extracts related information using a prefab structured digital engineering model. The subject bridge was set as a straight alignment, the Superstructure type as Precast girder and the Substructure type as Precast pier and Cast-in-situ Abutment. We identified the variables required to create a digital engineering model and reviewed them to create the digital engineering model by entering them as numerical values in the program. In addition, it is configured so that the variables linked to the alignment can be entered numerically. The quantity takeoff can be calculated when the design is complete. The purpose of the program development presented in this report is to enable the designers to select the optimal alternative by designing a bridge that best fits their current situation, extracting the relevant information and then by providing it to the manufacturer and construction company.

BIM기반 건축적산 매뉴얼 개발을 위한 만족도 분석에 관한 연구 (Study on the Satisfaction Analysis for Development of Construction Estimating Manager based on 3D Data)

  • 최창훈;이준복;한충희;소지윤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.222-223
    • /
    • 2014
  • According to the improvement of IT technology, an enhanced efficiency of management system in the construction industry is expected since a quotation system with BIM (Building Information Modeling) technique effectively estimates construction materials. For an enhanced efficiency of management system, related guidelines, standards, and manuals based on BIM are required, but the lack of this information causes difficulty to utilize in practice. In the paper, the satisfaction analysis was performed in order to promote the completeness of construction estimating manager that can be presented criteria and details of BIM-based quantity-takeoff, classification criteria.

  • PDF