• Title/Summary/Keyword: BIM based Construction Management

Search Result 351, Processing Time 0.026 seconds

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

A STUDY ON THE CONSTRUCTION OF BIM DATA INTEROPERABILITY FOR ENERGY PERFORMANCE ASSESSMENT BASED ON BIM

  • Jungsik Choi;Hyunjae Yoo;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.267-273
    • /
    • 2013
  • Early design phase energy modeling is used to provide the design team with first order of magnitude feedback about the impact of various building configurations. For better energy-conscious and sustainable building design and operation, the construction of BIM data interoperability for energy performance assessment in the early design phase is important. The purpose of this study is to suggest construction of BIM data interoperability for energy performance assessment based on BIM. To archive this purpose, the authors have investigated advantage of BIM-based energy performance assessment through comparison with traditional energy performance assessment and suggested requirement for construction of open BIM environment such as BIM data creation, BIM data software practical use, BIM data application and verification. In addition, the authors have suggested BIM data interoperability and BIM energy property mapping method focused on materials.

  • PDF

Ontology-based Facility Maintenance Information Integration Model using IFC-based BIM data

  • Kim, Karam;Yu, Jungho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.280-283
    • /
    • 2015
  • Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.

  • PDF

Applying the Cloud Computing Technology for Mobile BIM based Project Management Information System (모바일 BIM 공사관리시스템을 위한 클라우드 컴퓨팅 기술 활용 방안)

  • Lee, Jong-Ho;Eom, Shin-Jo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.145-148
    • /
    • 2011
  • As a futuristic construction model, building information model(BIM) based project management system(PMIS) and mobile PMIS have been showing visible sign. However, researches on the 3D BIM based PMIS using mobile device are hard to find, result from limitation of mobile device application(slow speed at huge BIM file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying feasibility of mobile BIM PMIS based on cloud computing as a business model. In case of applying mobile BIM PMIS, 3D drawings and integrated building informations are possible on mobile devices in real time. it would support increasing the productivity of project participants as designer, engineer, supervisor, and etc. Globally, BIM based PMIS and Mobile BIM system, cloud computing based mobile BIM simulator are in the concept or experimental phase, therefore it is possible to secure global leading technology of IT and construction merger in the mobile BIM.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.

CRITICAL FACTORS FOR ASSESSMENT OF BIM BASED QUANTITY-TAKE OFF

  • Seong-Ah Kim;Chang-Hee Lee ;Sangyoon Chin;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.7-11
    • /
    • 2011
  • Quantity take-off (QT) is one of the most important tasks for determining the total cost of a construction project, and it requires accuracy and reliability for the result. Accuracy and reliability in BIM-based QT are also required to assure the completeness of the result. However, there has been no basis to measure the completeness of the BIM-based QT result. As BIM is increasingly being adopted in the construction industry with a wide variety of purposes, it becomes more important to have a method to improve the completeness of BIM-based QT and criteria to measure it. This research focuses on the hypothesis that the completeness of BIM-based QT relies on the accuracy and reliability of BIM and the BIM-based QT process. As a basic research to determine the completeness of BIM-based QT, this research analyzes and derives factors that affect the completeness of BIM-based QT.

  • PDF

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF