Recently, the application of BIM for port & harbour facilities has been increasing, as it is widely applied to the infrastructure field both at domestic and abroad. However, the port and harbour projects still have very poor facilities information management system and the application level of BIM is very low compared to other facilities. Even if BIM is applied for those project, it is very difficult to determine in advance what information is needed without an accurate understanding of the business process. The purpose of this study is to develop a BIM framework for port & harbour facilities and to examine its applicability. To do this, we structured the classification of the port & harbour facilities and constructed object-based classification system based on ISO12006-3 standard. We also derived the BIM framework requirements from the viewpoint of process, standard, interface, and information, and confirmed the linkage of the BIM object classification system in the framework item. The applicability of the BIM framework for inspection process cases of port & harbour was examined. Accordingly, this study can solve requirement setting method, which is the non - procedural and non - systematic project information, in the BIM application process of the port & harbour project with the BIM framework. In addition, the framework is expected to be integrated into the system to play a key role in the selection of project objectives, and the ability to clearly identify the information requirements required by the BIM manager to perform the project.
국내 주요 공공발주기관의 BIM 도입 환경 수준이 높아짐에 따라 많은 설계 및 시공사에서는 BIM 수행 과정에서의 실질적인 업무 생산성 향상 방안에 대한 관심이 높아지고 있다. 이에 본 연구에서는 대표적인 BIM 설계 자동화 방안으로 BIM기반 설계 과정에서 반복적으로 수행되는 BIM 라이브러리 배치작업을 자동화하는 방안을 제시하였다. 특히 직선, 곡선, 수직 평면과 곡면 등 BIM 라이브러리의 배치 대상면을 구분하고, 각각에 대해 두 객체의 중심 거리와 선형 길이에 따른 배치간격, 배치방향 등을 고려하여 BIM 라이브러리 자동 배치 모형을 Dynamo로 구현하였다. 사례적용을 통해 다양한 배치 환경 및 조건에 따라 배치가 가능하고, 작업시간도 단축할 수 있는 것으로 확인되어 지형 특성에 맞게 배치해야 하는 각종 조형물이나 구조물들의 정확한 배치가 가능할 뿐만 아니라 배치 자동화를 통해 업무 생산성도 획기적으로 향상될 수 있을 것으로 기대된다.
As the needs for the mega-sized, high-rise and irregular shape of building increase, domestic application of BIM in construction industry is increasing in recent years. In this circumstance, interests in BIM modeling and modeling detail level have been also increased. BIM that is based on a three-dimensions, requires a specific and precise building expressions. And model expression level required for each phase such as design, construction, and maintenance of the construction project could be different as its needs. Because that it is not clear to define the criteria for the expression level of construction BIM model, It is difficult to decide how detail and what to model is appropriate in the practical application of BIM model. It could be the reason why the productivity in construction project became lower and lower. In this study we consider the way how to improve the productivity of BIM and analyze the appropriate representation level of construction BIM model through the experts' survey. The results of study could suggest the basis for an appropriate expression level of construction BIM model.
Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.
Recently, research on the application of BIM has continuously been active not only in architecture but also in civil engineering in order to improve work efficiency across the project's planning, design, construction and maintenance phases. However, the empirical applications of BIM targeting to civil engineering scope of construction sites still lags compared to architectural sized projects. This is because BIM tools are mainly based upon vertical structures of architecture, thereby most of them have difficulties and limitations to get utilized on horizontal structures of civil engineering. Therefore, this study intends to propose automation technology of design using BIM library and to indicate its field availability through case application on a railway project representing linear infrastructure. In addition, it put forward the utilization plan of the automation technology upto 4D and 5D by continue making use of the BIM model created in the project's design stage up through the maintenance stage. The novel method of the technology proposed in this paper incorporates the automatic creation of the BIM library based on two-dimensional tunnel cross-sections and sweeping of it over three-dimensional alignment to create a BIM model of linear infrastructure. The proposed technology is anticipated to improve the efficiecny of modeling process of railway projects based on linear structures.
BIM과 모듈러 공법은 건설 산업의 위기를 극복하는데 도움이 되는 중요한 기술로 인식되고 있다. 그러나 현재 국내 모듈러 건축 프로젝트에서 BIM의 활용은 미미한 수준이며 구체적인 활용지침이 제시되지 못하고 있다. 이에 따라 본 연구에서는 모듈러 건축공사의 현장시공계획단계를 위한 BIM 활용성 분석을 목적으로 하였다. 첫째, 기존문헌 고찰과 전문가 인터뷰를 통해 적용 가능한 BIM 업무를 선정하였으며, 모듈러 건축공사의 시공계획서를 분석하여 BIM 활용 업무를 5가지로 분류하였다. 이후 설문을 통해 각 항목에 대한 BIM 활용성을 필요성과 효율성으로 분석하였으며 이를 BIM utilization Index(BIM UI)를 통해 제시하였다. 설문 결과 모듈간 접합부 시공상세도 구축, 양중계획 검토, 기타공사 주요 시공부위의 상세도 구축, 현장공정 계획 검토, 그리고 현장배치계획 검토가 0.811, 0.787, 0.770, 0.729, 0.699 순으로 분석되었다. 이후 사례연구를 통해 BIM을 적용한 BIM 기반 시공계획서를 도출하여 전문가 자문을 실시하고 논의하였다. 본 연구의 결과는 향후 모듈러 프로젝트에서 BIM의 적정한 활용 방안을 제시하는데 활용될 수 있을 것이다.
최근 BIM은 국외의 적용 성공 사례를 통해 비용, 공기의 절감의 효과가 입증되어 건설업계에서 최대 이슈로 부각되고 있다. 본 논문에서는 기존 토목공사 설계단계의 업무와 정보관리 체계의 문제점을 파악한 후 설계 단계시 BIM기반의 토목공사 정보관리 모델을 제안한다. 논문에서 제시된 BIM기반 정보관리 모델은 교량공사를 대상으로 적용성을 검토하고 있으며, 이러한 설계단계의 지능화, 자동화된 통합정보관리는 참여자간의 효율적인 정보관리가 가능하도록 한다.
This study intended to introduce the method of designing an eco-friendly building based on BIM(Building Information Modeling) and BIM-based application. The proposed application aimed to generate the environmental performance of the designed alternative automatically in real-time manner in the process of architectural design. We focused on the feasibility of BIM-based eco-friendly design process and the applicability of the developed application for the architectural design practice. In this manner, in the end of paper, we proposed the so-call EcoBIM which is the performance evaluation module for the designed alternative using BIM in the real-time manner and the new design process with it. EcoBIM generate the coefficient of overall heat transmission of wall, roof and slab of the designed alternative with their physical characteristics such as thickness, thermal resistance and so on.
Recently, interest in the necessity and practical application of BIM (Building Information Modeling) is also increasing in the civil engineering field. However, there are difficulties in building BIM models and utilizing BIM modeling in the civil engineering field due to various reasons. To this end, it is necessary to develop management tools and research on management methods that can effectively utilize the BIM library in the civil engineering field. Libraries in the civil engineering field are complementary to each other, so library management in consideration of library management in various combinations and continuous updates is important. BIM library management was proposed through the development of a management tool that reflects these characteristics, which is expected to contribute to improving productivity in the field of civil design.
BIM은 지금까지 건설업무에 적용하는데 많은 시행착오를 겪어 왔다. BIM인 이슈화된지 10여년이 지났지만 활성화가 안 되고 있는게 현실이다. 본 연구는 철근콘크리트공사에 BIM적용을 제안하고자 한다. 철근콘크리트 공사는 건축공사비 중 가장 큰 비중을 차지하는 반면에 재료의 수가 적고 한정적이다. 또한 구조물 공사에 대한 모델링을 하여야 다른 모델링을 할 수 있으므로 철근콘크리트공사의 3D모델은 모든 3D모델링의 바탕이 되기 때문에 3D 모델링을 가장 처음 하여야 한다. 철근 콘크리트공사에 대한 수량산출 프로그램개발 및 사례를 통하여 BIM기반의 철근콘크리트 공사에 지식기반의 수식DB를 적용하여 시공단계까지 활용할 수 있는 BIM기반의 산출정보를 구축하였고, 적용성을 검증하였다. 이로써 BIM기반의 타 공종도 구현 가능성을 제시함으로써 정보화, 지능화 시대에 건설산업도 BIM기반의 활성화가 가능하다는 것을 확인하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.