• Title/Summary/Keyword: BIM Adoption

Search Result 64, Processing Time 0.027 seconds

GREEN BIM APPROACHES TO ARCHITECTURAL DESIGN FOR INCREASED SUSTAINABILITY

  • M. Zubair Siddiqui;Annie R. Pearce;Kihong Ku;Sandeep Langar;Yong Han Ahn;Kyle Jacocks
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.302-309
    • /
    • 2009
  • The effectiveness of Building Information Modeling (BIM) tools and processes has been recognized by the industry and owners are beginning to adopt Triple Bottom Line accounting practices, to enhance economic performance and environmental and social performance. However, the widespread and practical application of Green BIM remains largely unrealized. The authors identify that lack of understanding of the applicability of sustainability metrics to BIM design process is a significant barrier to this adoption. Through literature review this paper outlines the various sustainability metrics available to construction and elaborates on the potential of BIM for sustainable design. The paper maps and correlates applicable concepts of sustainability evaluation systems to BIM and describes the constraints in current BIM tools.

  • PDF

A Study on Applying Information Framework for BIM Based WBS -Focusing on Civil Construction- (BIM기반의 WBS 구축을 위한 정보프레임워크 도입방안 연구 -토목사업의 적용을 중심으로-)

  • Nam, Jeong-Yong;Jo, Chan-Won;Park, So-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.770-777
    • /
    • 2017
  • Building information modeling (BIM) has been receiving attention as an integrated information model instead of CAD since the 2000s. BIM technology was first used in the architectural field and was later introduced to the civil engineering field. However, the government announced a plan for the application of BIM to 20% of all SOC projects from 2020, so the adoption of BIM technology is expected to accelerate. In order to successfully adopt BIM, a systematic structure should be supported for integrated design information and implementation technology. Also, it is important to establish the relationship between information systems because many complicated factors are intertwined in the construction industry. In this study, we propose a framework for constructing integrated information through identifying the information relations for introducing BIM in the civil engineering industry. We applied this framework to a bridge project to confirm its effectiveness. This study can be applied to the integrated management of the construction process and costs by introduction of a work breakdown structure (WBS) to BIM. In addition, this study is expected to contribute to the adoption of BIM in the civil engineering field through the proposal of information system standardization in this field.

The Current Status of BIM in the Field of Landscape Architecture and the Issues on the Adoption of LIM (BIM에 관한 조경분야의 동향 및 LIM 활성화 방안)

  • Kim, Bok-Young;Son, Yong-Hoon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.3
    • /
    • pp.50-63
    • /
    • 2014
  • Since the new millennium, BIM has been widely adopted to improve productivity in the field of architecture, engineering, and construction with the government policies of each country. After its first introduction into the field of landscape architecture in USA, BIM has been debated on its merits and limitations mainly by the European countries' academic and, at the same time, practical worlds. However, little attention has been paid to BIM, in particular, in the field of landscape architecture in Korea leaving many issues to solve to fully utilize BIM. The purpose of this study is to present the main issues and strategic agenda for the successful introduction of BIM in landscape architecture in Korea. This study shows that the new derived word of LIM(Landscape Information Modeling) instead of BIM appeared in the field of landscape architecture. Then, this paper discusses the main issues on standardization and interoperability in the adoption of LIM to create, integrate, and reuse landscape information. Finally, four strategic agenda are presented to successfully introduce LIM into the domestic field of landscape architecture by reviewing the societies of the landscape discipline in UK and Norway that play a leading role by organizing BIM working groups.

The Experiment of Architectural Design Education by means of BIM (BIM을 이용한 건축디자인 교육의 실험연구)

  • Kim, Yong-Il;Yang, Kwan-Mok
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.19 no.5
    • /
    • pp.37-43
    • /
    • 2012
  • Results of experiments conducted in university-based design studio suggests that Building information Modeling invites the adoption of a dramatically different design process, traditional design process and BIM-aided design process. Experiment method is used the actual experiment by students. In contrast to traditional design process rooted in successive refinement of abstractions and dependence on tacit knowledge, the studio BIM-aided design process depends on a complete and comprehensive date base and alterative solutions by complete analysis for helping choice of finial result. BIM viewed as provocateur of design education provides great potential for the critical analysis of how architectural design is taught. The results reflect new ways of teaching and addressing BIM methods and process in the design studio project.

A Study on the Evaluation Items of BIM Process Maturity Measurement Model (BIM 프로세스 성숙도 측정 모델의 평가항목에 대한 연구)

  • Lee, Jae-sung;Ock, Jong-ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.281-295
    • /
    • 2016
  • Lately, the management of domestic BIM performance is quite lacking, as the evaluation and management data from successful cases of BIM implementation both on projects and in companies, and related effects (time, cost and other physical gains) are not well kept for future use in BIM development. In order to overcome the above obstacles, a systematic approach to evaluating BIM adoption with focus on particular elements like BIM implementation environment and processes, and the physical factors yielded by BIM, is necessary. In this study, objective and detailed assessment indicators and weights that are appropriate for the domestic situation were derived through research for purposes of developing a web-based BIM maturity measurement program that is tailor-made for the Korean construction atmosphere. Through a company's self-maturity measurement, excellent quality of BIM deliverables and output can be achieved and managed. Furthermore, the domestic BIM capacity can gradually increase since design firms' BIM capability can be judged during procurement basing on measurement indicators.

Risk Identification and Management Strategies for BIM Projects

  • Ng, Ron C.W.;Cheng, Jack C.P.;Das, Moumita
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.103-113
    • /
    • 2020
  • The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.

  • PDF

A study on the Development of BIM-based Quality Pre-checking System in Architecture Design Phase

  • Shin, Jihye;Choi, Jungsik;Kim, Inhan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.284-288
    • /
    • 2015
  • Recently, the mandate on utilizing BIM implemented by public institutions of many countries has great impact on the significantly increasing practices of BIM. The improvement of work efficiency and productivity, which is occurred by BIM adoption, depends on the consistency and accuracy of data. To maximize the benefit of BIM, the interests in BIM data quality have been enlarging all over the world. The BIM data quality pre-check, which is conducted by designer in the design phase, offers opportunities for quality improvement by continuously assessing BIM data. However, BIM quality pre-check is being conducted under arbitrary interpretation of users because of the absence of specific review factors and assessment methods for checking BIM quality. The purpose of this study is to establish an automated BIM quality pre-checking system to improve BIM design quality effectively and efficiently. It could be expected to meet the owner's requirements and to minimize the cost and time occurred additionally from revising and reproducing data by constructing consistency and accuracy of it.

  • PDF

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF

3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique (파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링)

  • Tanoli, Waqas Arshad;Raza, Hassnain;Lee, Seung-Soo;Park, Sang-Il;Seo, Jong-won
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.