M. Zubair Siddiqui;Annie R. Pearce;Kihong Ku;Sandeep Langar;Yong Han Ahn;Kyle Jacocks
International conference on construction engineering and project management
/
2009.05a
/
pp.302-309
/
2009
The effectiveness of Building Information Modeling (BIM) tools and processes has been recognized by the industry and owners are beginning to adopt Triple Bottom Line accounting practices, to enhance economic performance and environmental and social performance. However, the widespread and practical application of Green BIM remains largely unrealized. The authors identify that lack of understanding of the applicability of sustainability metrics to BIM design process is a significant barrier to this adoption. Through literature review this paper outlines the various sustainability metrics available to construction and elaborates on the potential of BIM for sustainable design. The paper maps and correlates applicable concepts of sustainability evaluation systems to BIM and describes the constraints in current BIM tools.
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.11
/
pp.770-777
/
2017
Building information modeling (BIM) has been receiving attention as an integrated information model instead of CAD since the 2000s. BIM technology was first used in the architectural field and was later introduced to the civil engineering field. However, the government announced a plan for the application of BIM to 20% of all SOC projects from 2020, so the adoption of BIM technology is expected to accelerate. In order to successfully adopt BIM, a systematic structure should be supported for integrated design information and implementation technology. Also, it is important to establish the relationship between information systems because many complicated factors are intertwined in the construction industry. In this study, we propose a framework for constructing integrated information through identifying the information relations for introducing BIM in the civil engineering industry. We applied this framework to a bridge project to confirm its effectiveness. This study can be applied to the integrated management of the construction process and costs by introduction of a work breakdown structure (WBS) to BIM. In addition, this study is expected to contribute to the adoption of BIM in the civil engineering field through the proposal of information system standardization in this field.
Journal of the Korean Institute of Landscape Architecture
/
v.42
no.3
/
pp.50-63
/
2014
Since the new millennium, BIM has been widely adopted to improve productivity in the field of architecture, engineering, and construction with the government policies of each country. After its first introduction into the field of landscape architecture in USA, BIM has been debated on its merits and limitations mainly by the European countries' academic and, at the same time, practical worlds. However, little attention has been paid to BIM, in particular, in the field of landscape architecture in Korea leaving many issues to solve to fully utilize BIM. The purpose of this study is to present the main issues and strategic agenda for the successful introduction of BIM in landscape architecture in Korea. This study shows that the new derived word of LIM(Landscape Information Modeling) instead of BIM appeared in the field of landscape architecture. Then, this paper discusses the main issues on standardization and interoperability in the adoption of LIM to create, integrate, and reuse landscape information. Finally, four strategic agenda are presented to successfully introduce LIM into the domestic field of landscape architecture by reviewing the societies of the landscape discipline in UK and Norway that play a leading role by organizing BIM working groups.
Journal of the Korean Institute of Educational Facilities
/
v.19
no.5
/
pp.37-43
/
2012
Results of experiments conducted in university-based design studio suggests that Building information Modeling invites the adoption of a dramatically different design process, traditional design process and BIM-aided design process. Experiment method is used the actual experiment by students. In contrast to traditional design process rooted in successive refinement of abstractions and dependence on tacit knowledge, the studio BIM-aided design process depends on a complete and comprehensive date base and alterative solutions by complete analysis for helping choice of finial result. BIM viewed as provocateur of design education provides great potential for the critical analysis of how architectural design is taught. The results reflect new ways of teaching and addressing BIM methods and process in the design studio project.
Korean Journal of Computational Design and Engineering
/
v.21
no.3
/
pp.281-295
/
2016
Lately, the management of domestic BIM performance is quite lacking, as the evaluation and management data from successful cases of BIM implementation both on projects and in companies, and related effects (time, cost and other physical gains) are not well kept for future use in BIM development. In order to overcome the above obstacles, a systematic approach to evaluating BIM adoption with focus on particular elements like BIM implementation environment and processes, and the physical factors yielded by BIM, is necessary. In this study, objective and detailed assessment indicators and weights that are appropriate for the domestic situation were derived through research for purposes of developing a web-based BIM maturity measurement program that is tailor-made for the Korean construction atmosphere. Through a company's self-maturity measurement, excellent quality of BIM deliverables and output can be achieved and managed. Furthermore, the domestic BIM capacity can gradually increase since design firms' BIM capability can be judged during procurement basing on measurement indicators.
International conference on construction engineering and project management
/
2020.12a
/
pp.103-113
/
2020
The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.
International conference on construction engineering and project management
/
2015.10a
/
pp.284-288
/
2015
Recently, the mandate on utilizing BIM implemented by public institutions of many countries has great impact on the significantly increasing practices of BIM. The improvement of work efficiency and productivity, which is occurred by BIM adoption, depends on the consistency and accuracy of data. To maximize the benefit of BIM, the interests in BIM data quality have been enlarging all over the world. The BIM data quality pre-check, which is conducted by designer in the design phase, offers opportunities for quality improvement by continuously assessing BIM data. However, BIM quality pre-check is being conducted under arbitrary interpretation of users because of the absence of specific review factors and assessment methods for checking BIM quality. The purpose of this study is to establish an automated BIM quality pre-checking system to improve BIM design quality effectively and efficiently. It could be expected to meet the owner's requirements and to minimize the cost and time occurred additionally from revising and reproducing data by constructing consistency and accuracy of it.
International conference on construction engineering and project management
/
2013.01a
/
pp.94-102
/
2013
The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.
Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.