Analitic study of the PSC box structure based on BIM (BIM기반의 PSC 박스 구조물의 해석기법)

  • Lee, Heon-Min;Park, Jae-Geun;Jo, Sung-Hoon;Choi, Jung-Ho;Shin, Hyun-Mock
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.179-180
    • /
    • 2009
  • Recently Development of construction system that subjective operators share and control information efficiently based on the three-dimensional space and design information throughout life cycle of construction project is progressing dynamically. In this study, therefore, we research about interface method between 3-D modeling data for civil-structure-design, especially psc-box-girder design and analysis program, and analysis method of the psc box structure based on BIM(Building Information Management)

  • PDF

ICT-BIM based Quality Nonconformity Control Method for Construction Project (ICT-BIM 기반 건설프로젝트 품질부적합 관리 시스템)

  • Son, Sang-Hyuk;Lee, Hyung-Guk;Bae, Sang-Hee;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.76-77
    • /
    • 2016
  • This paper presents an automated construction quality nonconformity control method. Existing quality control process are confined attributed to the dependence on human quality personnels. They are inefficiency for continuos quality improvements and may cause project schedule delays when any nonconformity is handled timely fashion. For sure, It is important to identify the add hoc quality nonconformity control processes and to implement them into an automated system that controls its' work-flow. It would be desirable to develop the construction project quality nonconformity control system using Building information modeling(BIM) and Information and Communications Technologies(ICT). It may provide an effective platform to prevent quality issues that exist in the existing quality management practice.

  • PDF

A study on the necessity of electrical installations BIM library standard (전기설비 BIM라이브러리 표준화 필요성 연구)

  • Nam, Ki-Beom;Yoo, Sang-Bong;Son, Yeong-Seon;Jeong, Sang-Woong;Kim, Gi-young
    • Proceedings of the KIPE Conference
    • /
    • 2014.07a
    • /
    • pp.560-561
    • /
    • 2014
  • 전기설계업체들은 현재 설계사마다 혹은 프로젝트마다 새로운 라이브러리를 구축하고 이러한 라이브러리를 업체 고유 노하우라고 하여 공개하지 않아 업체별 중복 제작에 따른 경제적 낭비가 발생하고 있다. 또한, 일부 공개된 라이브러리는 주관적인 관점에서 작성되어 지거나 전기 분야의 전문지식이 없는 소프트웨어 공급 업체들이 만들어 배포하다보니 전기설계 품질확보에 많은 문제가 되고 있다. 이러한 문제의 해결을 위해서는 전문성을 갖춘 전문가가 전기분야의 BIM라이브러리를 구축하고 활용할 수 있도록 표준화를 시킬 필요가 있다.

  • PDF

COBie Document Prototype for supporting BIM based Smart Maintenance of Buildings (BIM 기반 건축물 스마트 유지관리 지원 COBie 문서 프로토타입)

  • Koo, Kyo-Jin;Park, Sang-Hun;Cho, Dong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.60-68
    • /
    • 2019
  • For effective building maintenance, the collection and management of various maintenance date such as work history information and material information is required. Despite the introduction of information management technologies and systems to reduce the amount of maintenance work of buildings, which have become larger and more complex, the maintenance information is not being utilized properly. As an alternative, research on the introduction and utilization of BIM is being conducted continuously. However, the BIM models generated at the design phase are not utilized in practice due to a lack of architectural maintenance information. This study proposed a COBie document prototype to support BIM-based smart maintenance tasks performed by building managers. In order to formalize various types of maintenance work procedures, a BIM-based maintenance process model is presented in two categories: inspection and maintenance. Among the BIM attribute data of the BIM model generated at the design phase, the parameters corresponding to the maintenance necessary information for each basic process are derived. Based on this, we proposed a COBie document prototype consisting of seven spreadsheets. The results of a case study confirmed that the KBIMS library-based BIM model created at the design phase without the maintenance information can be used at the maintenance phase.

Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models (BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구)

  • Choi, Hyunjun;Yun, Seokheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.89-97
    • /
    • 2019
  • Recently, BIM has been actively introduced in construction projects. In particular, the introduction of BIM in cost estimating process is expected to improve the accuracy and efficiency of the cost estimate. However, the quantity calculation and BoQ documents preparation process still require manual work. Although the BIM model may support quantification process, it is still problematic that the level of detail of the model must be very detailed to meet the items in BoQ. To address this, it is necessary to analyse the LOD criteria and to analyze the extent to which quantity can be computed according to the level of detail in the BIM model. For the analysis of LOD-based work items, the work item grades were divided into A,B, and C. In this study, the ratio and cost of each item that can be calculated at the LOD level in the detailed design phase are reviewed for each type of work, and the method for improving the quantity calculation using BIM is proposed. In the LOD 300 stage(Detailed design stage), the largest number of items in the class B, the major improvement class, are window and glass work. In addition, the most expensive type of work was analyzed by reinforced concrete work. In the future, it is necessary to suggest appropriate improvement way for items with high item ratios and items with high cost ratios. The results of this study are expected to be used as a BIM-based cost estimation or as basic data for improving the current BoQ system.

An RFID and BIM based Simulator for Construction Material Logistics and Progress Management (RFID와 BIM을 활용한 건설 자재 물류 및 진도관리 시뮬레이터 개발)

  • Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.46-54
    • /
    • 2011
  • There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design RIM data to construction BIM data.

A Study on the Review Method of Zero Energy Independence Rate in Building Applied with BIM-based BIPV (BIM기반 BIPV 적용 건축물의 제로에너지 자립률 검토 방법에 관한 연구)

  • Choi, Kyu-Hyeok;Jeon, Hyun-Woo;Park, Kyung-Do
    • Journal of Digital Convergence
    • /
    • v.20 no.2
    • /
    • pp.277-287
    • /
    • 2022
  • ZEB is a building that increases the energy independence of the building itself, and new and renewable elements that can produce energy are essential, and BIPV is the most notable technology. In ZEB's design, BIPV should be planned early in the design, but BIPV plans are insufficient in the early stages. Therefore, this study derived elements for theoretical consideration of BIM and ZEB and analysis of ZEB independence rate based on BIM, a convergence design technology, and analyzed BIPV energy production and building energy consumption. Finally, by calculating the energy independence rate and reviewing the rating criteria in the project model, a basic research method for calculating the energy independence rate of ZEB at the beginning of the design was presented. Through this, it is expected that design productivity can be improved by supporting the decision of ZEB subjects.

A Study on Cost Estimate for Building Parts in the Schematic Design Phase -Focusing on Educational Research Facility- (부분별 코스트산정법을 활용한 계획설계 비용예측에 관한 연구 - 교육연구시설을 중심으로 -)

  • Kim, Yo-Han;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.18-25
    • /
    • 2011
  • Construction cost estimation in the early phase provides the opportunity to make reasonable decisions related to the project. For estimating this cost, various methods have been developed. But several problems have been recognized like accuracy, relation beteewn design and cost etc. In this study, we developed the method of cost estimating for building parts. The modified method has defferent ratio of space functions to calculate cost more correctly. Also historical cost data is used in this modified method for architects to estimate cost conveniently. By this modified method, we expects architects should easily design buildings based on cost.

Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase (BIM기반 초기 설계 단계 철근 물량 산출 프로세스 구축)

  • Song, Chi-Ho;Kim, Chee-Kyeong;Lee, Si Eun;Choi, Hyunchul
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.5
    • /
    • pp.447-454
    • /
    • 2016
  • In the meantime, looking at the present status of how to estimationte the quantity of rebar based on 3D BIM getting the limelight in these days, commercial BIM tools provide rebar modeling functions however it takes a vast amount of modeling time for modeling of rebar in use of that function hence there is no BIM software at present for practical use. Therefore, in this study, we organized and presented a practical rebar quantity estimationtion process in BIM-based design work-site and intended to develop a program named Rebar Automatic Arrangement Program - hereinafter called RAAP - which enables automatic rebar arrangement based on much more precise cross-sectional information of bars in column, beam, slab and wall than the one from existing 2D method under the conditions without any cross-sectional information in the initial design phase. In addition, we intended to establish rebar quantity estimationtion process in the initial design phase through interworking of modeling & quantity estimationtion functions in consideration of joint, anchoring length of BuilderHUB as a BIM software with RAAP. The results from this study are practical in developing a technology that is able to estimationte quantity with more improved reliability than the one from existing 2D-based methods with less effort when the quantity of framework is estimationted in the uncompleted state of cross-sectional design for structural members in the initial design phase of a construction project. And it is expected that it could be utilized as a basic study from which a reasonable quantity estimationtion program can be established in the initial design phase.

Case Study of Civil-BIM & 3D Geographical Information (3차원 지형자료와 토목 BIM의 사례적용 연구)

  • Park, Jae-Sun;Pyeon, Mu-Wook;Jo, Jun-Ho;Lee, Gun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.6
    • /
    • pp.569-576
    • /
    • 2011
  • Recently the establishment of high accuracy 3D spatial information has been largely stimulated according to the increase in need of such 3D spatial information. In the fields of constructions and civil works, studies on increasing the productivity in these fields through converging them with other fields using the established 3D spatial information have been conducted. In such a tendency, BIM (Building Information Modeling) technologies have been rapidly applied to the fields of constructions and civil works. In particular, in the fields of constructions and civil works that represent a life span of plan-design-construction-maintenance, some BIM application methods and plans for the characteristics in each step have been proposed. Thus, the objective of this study is to simulate a project that is reasonable and can be optimized in connection with 3D spatial information and BIM technologies escaped from the conventional civil construction process that is based on empirical, statistical DB, and 2D information. For achieving this objective, 3D terrain data for the subject area engaged in this study using aerial photographs and airborne LiDAR was established. Also, a counter plan for the issues, which cannot be solved in the conventional methods for managing civil work projects, is applied through implementing bridge-based civil structure BIM by combining them with objective information.