• Title/Summary/Keyword: BIM활용

Search Result 495, Processing Time 0.025 seconds

A Study on Process Inovation of Tower-Crane Planning by Using BIM (BIM 정보를 활용한 장비 선정 Process Inovation에 관한 연구)

  • Jang, Se-Jun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.446-449
    • /
    • 2008
  • Construction project has been changing a huge size and the complicated, so information of each parties are overflow. For more successful construction, more communications are required. Nowadays, BIM has been used widely to solve the problem. But BIM information is used by attribute parties. Many of parties cannot use BIM information. Therefore, this study's purpose is to develope prototype of BIM usage for tower crane. It will overcome current information dividing.

  • PDF

기술초대석 - BIM Tool 소개 두번째 : Digital Project Part 1

  • Choe, Il-Seop;Choe, Seok-Dong;Kim, Ji-Hyeon
    • 건축구조
    • /
    • v.19 no.1
    • /
    • pp.36-41
    • /
    • 2012
  • Digital Project(이하 DP)는 동대문 DDP, 여수엑스포, 한강예술섬등 비정형건축물의 BIM에 주로 활용되는 BIM Tool이다. 기계, 전기, 자동차분야에 널리 사용되는 Catia V5를 기반으로 건축분야에 맞게 건축, 구조, MEP 모듈을 탑재한 것이다. DP에 대한 자세한 소개는 본 회지 7 8월호를 참조하길 바란다. 현재 국내에는 DP가 많이 보급되지 않았고 배우기에도 Revit에 비해 상대적으로 까다롭기 때문에 유저층이 많지 않지만, 해외에서는 유저가 많으며 많은 Add-in이 만들어지고 있다. 이번호에서는 지난호에서 소개했던 Revit과 동일한 모델을 이용해 구조설계프로세스에 따라 구조BIM을 생성하고 활용하는 방법을 소개하도록 하겠다.

  • PDF

Bim Strategy Plan through Domestic Construction Companies BIM Project Case Analysis - focused on the BIM USE of the project from 2009 to 2015 - (국내 건설회사 BIM 프로젝트의 사례 분석을 통한 BIM전략 수립 방안 - 2009년부터 2015년까지 프로젝트의 BIM Use를 중심으로 -)

  • Jo, Yong-Hyun;Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.1-11
    • /
    • 2016
  • In South Korea, there have been attempts to enhance BIM work practices in various aspects. Public Procurement Service(PPS) has recently published 'basic guidelines to improve BIM work practices in construction and facility management'. It defines roles and responsibilities of project members in their application of BIM. It also developed a set of modelling standards and guidelines for effective model creation, management and communication among BIM users. Moreover, numerous construction companies have tried to cultivate BIM specialized manpower throughout entire construction phases. However, there are still challenges faced by firms during BIM adoption. Therefore, this study aims to provide practical counsel for construction companies to help them create optimized facilities and deliver high performance by analyzing BIM-based domestic construction projects in Korea from 2009 and 2015. The study will investigate types of client, project, BIM application range, and application technology.

A Study on the good use of Construction Management Model based on BIM (CM(ConstructionManagement)에의 효율적 BIM활용에 관한 연구)

  • Min, Young-Gi;Kim, Kyung-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.87-95
    • /
    • 2010
  • The CM(Construction Manager) of D-university has been seeking the advice of my BIM-team to adopt CM(Construction Management) and BIM best practices to improve project delivery results, and has authored best practice reports for spatial validation, BIM, 3D, 4D and 5D performance. Building Information Modeling(BIM) Process, Integration, and Adoption looks at BIM implementation from a company and project level laying out a process for companies to use BIM. Following this studies, participants will be able to: 1. BIM participants has been creating a BIM process diagram for a project, and has been evaluating and selecting process options for a specific BIM project. 2. BIM participants has been describing the roles and responsibilities of participants in the BIM process, and has been communicating the BIM process to management, colleagues, and project stakeholders. 3. BIM participants has been identified consistent factors influencing BIM return on investment at the project level and the company level, and has been outlining a process for BIM adoption on the project level and company level.

A Method of Facility Management based on BIM (BIM을 이용한 시설물 유지관리 방안)

  • Nah, Hei-Sook;Choi, Won-Sik;Kim, Nam-Gon;Moon, Hyoun-Seok;Seo, Myoung-Bae
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2013.05a
    • /
    • pp.435-436
    • /
    • 2013
  • 최근 유지관리 단계에서 BIM (Building Information Modeling)을 이용하여 시설물 유지관리 효율성과 성능개선을 도모하기 위한 연구들이 시작되고 있다. 현행의시설물 유지관리 업무에서는 준공도서를 효과적으로 활용하고 있지 못하고 있으며, 유지관리 단계의 의사결정을 위한 정보체계 미흡, 자산관리 체계 미흡 등으로 효율성 측면에서 유지관리 운영의 한계를 나타내고 있다. 이를 해결하기 위해 본 연구에서는 시설물의 3차원 형상정보 관리체계와 능동적 의사결정 모델 등 BIM기술을 활용한 유지관리 방법론을 제시한다. 제시된 방법론의 핵심인 BIM모델을 활용함으로써 시설물의 유지관리 정보의 통합관리와 시설물 성능관리에 대한 효율적 의사결정을 지금보다 쉽게 할 수 있을 것이다.

  • PDF

Analysis of Substitutability of 2D Electronic Drawing Using the BIM Model -Focusing on the Electronic Delivery System in Road Field- (BIM 모델을 활용한 2D 전자도면 대체 가능성 분석 -도로분야 전자납품체계를 대상으로-)

  • Seo, Myoung-Bae;Ju, Ki-Beom;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.441-450
    • /
    • 2013
  • With the recent increase in BIM orders in civil engineering, project owners are supplied with BIM-based products. Due to the lack of related guidelines, however, and the vague regulations on the creation and level of drawings as well as on the products list, many owners receive BIM-based products along with the existing 2D products. This can lead to task overlapping by designers or contractors and can cause the owners to have more data to maintain. If the existing 2D-based electronic supply system is changed to a BIM ordering system to reduce such a burden, it is necessary to examine the 2D products that can be extracted from or substituted for the BIM model so as to minimize the overlapping products. Therefore, in this study, BIM modeling of road construction projects whose enforcement plan by the Ministry of Land and Transportation has been completed was conducted, and based on the study results, the possibility of extracting 2D drawings from a total of 3,767 drawing items was determined. The results showed that 2,549 drawing items (67%) could be extracted as 2D drawings from the BIM model, and in particular, drawing items related to general connection work, earthwork, and amenities work could be most effectively substituted. The results of this study can be used as the base data for reducing the number of 2D drawings or substituting them in developing a BIM-based product supply system in the future.

A Study on the Design Change History Management for BIM-based Architecture-Structure Collaboration (BIM 기반 건축-구조분야 협업을 위한 설계변경 이력관리 방안 연구)

  • Park, kyoung Jun;Ock, Jong Ho
    • Korea Science and Art Forum
    • /
    • v.37 no.3
    • /
    • pp.135-145
    • /
    • 2019
  • IFC(Industry Foundation Classes) is used for information exchange in BIM-based collaboration process, and it does not secure reliability of information exchange results between fields due to structural limitations. In the end, it is a realistic problem that we have to use specialized BIM software by field, and we can not secure smooth interoperability in the process of information exchange and change. This study was conducted to find ways to secure the interoperability of BIM work between architecture and structure fields by utilizing Open Source provided by software developers to solve these problems. First, through expert survey and in-depth interview, information and improvement factors required in the process of collaboration between architecture and structure were derived. Second, in order to find a solution to the improvement factors, existing studies related to Open-API and domestic and overseas APIs were investigated and analyzed. Third, Ad-On was developed to secure interoperability by using Open API, mainly BIM S/W, which is mainly used in each field. As a result of the study, the possibility of securing interoperability through the management of the design change history between fields was confirmed by using API. It is judged that the application range of API will be expanded to the construction and maintenance field in the future. Therefore, in order to increase the usability for application diffusion, further research on interface improvement through user-centered verification is needed.

Functional Analysis of 4D CAD System and Improvement of Function for Applying Linear Construction Project (4D CAD시스템의 기능분석 및 선형시설물 적용을 위한 기능 개선 방안)

  • Kim, Hyeon-Seoug;Kang, Leen-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.269-278
    • /
    • 2018
  • In Korea, BIM technology is applied mainly to building construction projects, but is expected to be applied rapidly to civil engineering projects because the government is currently considering the mandatory application of BIM for infrastructure facilities. Because the infrastructure project is processed in a horizontal work area, the application of BIM technology is more useful in the schedule management of the construction phase than the interference management of the design phase. The 4D CAD system is a typical BIM technology applied to the schedule management in the construction phase, but the application to the actual project is limited due to the lack of practical functions. This study examined the functions of four representative 4D CAD systems commercialized so that the selection criterion can be provided according to the characteristics of the project, and suggests that the functions that should be improved to have practicability. As a result of functional analysis, the application characteristics of each system were analyzed and the user convenience was suggested. In addition, a linear 4D simulation methodology was developed to improve the functions applicable to civil engineering projects, and ways to improve the utilization of the infrastructure projects as the construction phase BIM were suggested. In railway and road construction projects, most activities, such as earthwork, bridges, and tunnels proceed along the distance axis in a horizontal space. Therefore, a linear 4D simulation method, in which an activity is expressed along a distance axis, can be more practically useful rather than a simple 4D simulation method with a Gantt chart.

A Study on the Application of BIM for Improving the Quality of Architectural Design (건축설계 성과물 품질향상을 위한 BIM활용에 관한 연구)

  • Jeong, Soo-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.35-36
    • /
    • 2012
  • BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM-based project in current transitional period of adopting BIM. The purpose of this study is to develop and apply of quality control requirement for improving the quality of BIM-based architectural design through case study. In particular, by focusing on BIM quality control and its relevant subjects, the minimum standards for BIM quality management are suggested. Also, BIM template is suggested to support the effective application of BIM-based architectural design.

  • PDF

A Study on the Expression Level of BIM Model for utilizing in Construction Phase (시공단계 활용을 위한 BIM모델의 표현수준에 관한 연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.253-254
    • /
    • 2016
  • In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.

  • PDF