• Title/Summary/Keyword: BIM모델

Search Result 415, Processing Time 0.022 seconds

Deriving AR Technologies and Contents to Establish a Safety Management System in Railway Infrastructure (철도 인프라 안전 관리 시스템 구축을 위한 AR 기술 및 콘텐츠 도출)

  • Jeon, Hae-In;Yu, Young-Su;Koo, Bon-Sang;Seo, Hyeong-Lyel;Kim, Ji-Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.3
    • /
    • pp.427-438
    • /
    • 2022
  • With the recent growing importance over safety management the need for advanced and technical approaches for on-site safety inspection methods has increased. Railway construction is subject to its own particular set of temporal and spatial challenges due to its unique facilities and equipment. This study aimed to investigate the field characteristics of railway infrastructure and improve the conventional field safety management methods by identifying the most appropriate features of AR technology. Group interviews and surveys were conducted with field safety experts to derive the major problems and inspection needs. Subsequently, various features of AR, such as BIM model projection, and remote conferencing, were investigated to determine their applicability to address safety issues. As a result, four problems in the current safety management process, such as 'lack of time due to the conventional inspection method and inspection of areas that are difficult to access', and three major inspection types, such as 'observance of work procedures, status of installation, adequate dimensional spacing', were identified to be improved when adopting AR based techniques. Furthermore, AR technology utilizing plans to solve safety inspection problems and effectively manage major inspection types were proposed, and a follow up survey was conducted with the same field safety experts to derive the priority of technology development.

3D Architecture Modeling and Quantity Estimation using SketchUp (스케치업을 활용한 3D 건축모델링 및 물량산출)

  • Kim, Min Gyu;Um, Dae Yong
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.7 no.6
    • /
    • pp.701-708
    • /
    • 2017
  • The construction cost is estimated based on the drawings at the design stage and constructor will find efficient construction methods for budgeting and budgeting appropriate to the budget. Accurate quantity estimation and budgeting are critical to determining whether the project is profitable or not. However, since this process is mostly performed depending on manpower or 2D drawings, errors are likely to occur and The BIM(Build Information Modeling) program, which can be automated, is very expensive and difficult to apply in the field. In this study, 3D architectural modeling was performed using SketchUp which is a 3D modeling software and suggest a methodology for Quantity Estimation. As a result, 3D modeling was performed effectively using 2D drawings of buildings. Based on the modeling results, it was possible to calculate the difference of the quantity estimation by 2D drawing and 3D modeling. The research suggests that the 3D modeling using the SketchUp and the calculation of the quantity can prevent the error of the conventional 2D calculation method. If the applicability of the research method is verified through continuous research, it will contribute to increase the efficiency of architectural modeling and quantity Estimation work.

A Study on the Usage of Digital Design Tool on Architectural Design Process (건축 프로세스에서의 Digital Design Tool 활용에 관한 연구)

  • Jeon, Hyun-Woo;Choi, Jong-Chon;Kim, Khil-Chae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.567-572
    • /
    • 2009
  • 본 연구에서는 국외 설계사무실과 국내 설계사무실의 수행 프로젝트(표1)를 디지털 디자인 프로세스에서의 디지털 도구 활용 사례조사 결과를 일련의 설계 프로세스(기획(Pre-Design), 계획 설계(Schematic Design) 중간설계(Detail Design), 실시설계(Construction Design))를 11개의 설계 단위작업((1)자료수집, (2)도서화작업, (3)의사소통/프레젠테이션, (4)협력업체와의 협업, (5)디자인 실험, (6)디자인분석/유효성 검토, (7)빌딩시스템과 자재선정, (8)자재비교/견적, (9)디자인 발전, (10)RP를 이용한 모델 제작, (11)시공/제작)으로 분류하여(설계프로세스별로 디지털 디자인 툴의 활용 빈도를 조사 분석하는 것은 프로세스별로 중복된 설계 단위작업이 진행됨으로 연구결과의 의미가 잘못 해석될 수 있다.) 그 활용에 대한 유형을 분석하고 이를 바탕으로 설계과정에서의 디지털 디자인 툴의 활용특성을 도출하여 실무설계의 기초자료를 제공하는데 그 목적을 둔다.

  • PDF

A Study on Application of CPLM using Process Model of the Pre-design stage (건축 기획단계 프로세스 모델의 CPLM 적용에 관한 연구)

  • Park, Do-Young;Jun, Yeong-Jin;Moon, Sung-Kon;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.205-208
    • /
    • 2009
  • The purpose of this study is to apply the process model of the pre-design stage to CPLM(Construction Project Life-cycle Management). Life-cycle consists of 4 stage; Pre-design, Design, Construction, Maintenance. Each stage has organic relations between front and rear stage. Therefore it is important to manage and use the information data of each stage. But these data are not carried to the next stage smoothly, especially at the pre-design stage. It is even vague to define the process of the pre-design stage. To carry and share the information well, this study defines Pre-design stage process and CPLM at first, VA-Cityplanner which is the development system of the pre-design process model is applied to CPLM for the smooth current of the data between participants.

  • PDF

An Adversarial Attack Type Classification Method Using Linear Discriminant Analysis and k-means Algorithm (선형 판별 분석 및 k-means 알고리즘을 이용한 적대적 공격 유형 분류 방안)

  • Choi, Seok-Hwan;Kim, Hyeong-Geon;Choi, Yoon-Ho
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.31 no.6
    • /
    • pp.1215-1225
    • /
    • 2021
  • Although Artificial Intelligence (AI) techniques have shown impressive performance in various fields, they are vulnerable to adversarial examples which induce misclassification by adding human-imperceptible perturbations to the input. Previous studies to defend the adversarial examples can be classified into three categories: (1) model retraining methods; (2) input transformation methods; and (3) adversarial examples detection methods. However, even though the defense methods against adversarial examples have constantly been proposed, there is no research to classify the type of adversarial attack. In this paper, we proposed an adversarial attack family classification method based on dimensionality reduction and clustering. Specifically, after extracting adversarial perturbation from adversarial example, we performed Linear Discriminant Analysis (LDA) to reduce the dimensionality of adversarial perturbation and performed K-means algorithm to classify the type of adversarial attack family. From the experimental results using MNIST dataset and CIFAR-10 dataset, we show that the proposed method can efficiently classify five tyeps of adversarial attack(FGSM, BIM, PGD, DeepFool, C&W). We also show that the proposed method provides good classification performance even in a situation where the legitimate input to the adversarial example is unknown.

A Study on the Possibility of Initial Cost Saving in the New Housing Model Considering Long-life and Constructability - Focused on the Case Analysis with Converting Skeleton and Cladding to New Systems - (장수명화와 시공성을 고려한 새로운 공동주택 모델의 초기 비용절감 가능성 연구 - 구조체와 외장전환 사례분석을 중심으로 -)

  • Kim, Soo-Am;Shin, Sung-Eun;Chung, Joon-Soo;Shon, Young-Jin
    • Journal of the Korean housing association
    • /
    • v.23 no.6
    • /
    • pp.49-59
    • /
    • 2012
  • This study suggested a new model in consideration of long life and constructability of apartment house suggested in the former part. New model suggested the possibility of cost saving based on the idea that people trend to reject because of the recognition that the new model would cost a lot of expense which work as the barrier for the expansion and distribution at the local market so as to prepare the ground for its activation. The Study was aimed at verifying the possibility of cost saving through comparing it with the existing standard apartment house system centered on the skeleton and cladding system among the new structural design models suggested in the former part. Assuming that these existing standard both models should be changed structural design into new model system, the quantity volume, cost and construction period along with the alteration of finished materials between two models were compared altogether. Simultaneously BIM library was built for easy taking-off bill of quantity and consideration of working methodology for construction working cycle, which was translated into construction cost so as to derive the cost of the two subject systems to be counted. Through the analysis, it was concluded that new model would secure variability in the future and constructability along with shortening the construction period (29%) and achieve cost saving (13%) of construction against the those of existing model.

Microsoft Kinect-based Indoor Building Information Model Acquisition (Kinect(RGB-Depth Camera)를 활용한 실내 공간 정보 모델(BIM) 획득)

  • Kim, Junhee;Yoo, Sae-Woung;Min, Kyung-Won
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.31 no.4
    • /
    • pp.207-213
    • /
    • 2018
  • This paper investigates applicability of Microsoft $Kinect^{(R)}$, RGB-depth camera, to implement a 3D image and spatial information for sensing a target. The relationship between the image of the Kinect camera and the pixel coordinate system is formulated. The calibration of the camera provides the depth and RGB information of the target. The intrinsic parameters are calculated through a checker board experiment and focal length, principal point, and distortion coefficient are obtained. The extrinsic parameters regarding the relationship between the two Kinect cameras consist of rotational matrix and translational vector. The spatial images of 2D projection space are converted to a 3D images, resulting on spatial information on the basis of the depth and RGB information. The measurement is verified through comparison with the length and location of the 2D images of the target structure.

Heating and Cooling Energy Demand Analysis of Standard Rural House Models (농어촌 주택 표준모델의 냉난방에너지요구량 분석)

  • Lee, Chan-Kyu;Kim, Woo-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.8
    • /
    • pp.3307-3314
    • /
    • 2012
  • The annual energy demand of the standard rural house models was analyzed using the DesignBuilder. Indoor temperature set-point, U-value of outer wall, type of window, and degree of ventilation were selected as simulation parameters. In all the simulation cases, heating energy demand was higher than cooling energy demand regardless of the building size. When the lower U-value of the outer wall was applied to account for the thicker insulation layer, heating energy demand was decreased while cooling energy demand was increased. However, it is better to reduce the area of outer wall which is directly exposed to outdoor air because reducing the U-value of the outer wall is not effective in decreasing heating energy demand. Among the four different window types, the double skin window is most favorable because heating energy demand is the lowest. For a fixed infiltration rate, higher ventilation rate resulted in an increased heating energy demand and had minor impact on cooling energy demand. As long as the indoor air quality is acceptable, lower ventilation rate is favorable to reduce the annual energy demand.

CNC Twisted Tube Method for 3D Coordinate Control Technology for Freeform Structure -Focused on The ARC in DaeGu- (비정형구조의 3차원 좌표제어를 위한 CNC Twisted Tube 공법 적용 -대구 대표물문화관(The ARC)를 중심으로-)

  • Ryu, Han-Guk;Kim, Sung-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.434-440
    • /
    • 2013
  • Generally, the envelope of a freeform building is composed of a structure made with rectangular or C-shaped steel pipe, and steel or aluminum panel finishes on the structure. However, these construction methods increase material loss and cost and time. There are also numerous cases of misunderstanding of design and difficulties in construction, which frequently cause construction errors. Such construction errors decrease construction productivity, resulting in poor construction quality and the need for rework, as well as cost and time overruns. To solve the problem, this study proposes a 3D coordinate control technology for freeform structure implemented through a CNC(Computerized Numerical Control) Twisted tube method, and by extension, develops a BIM-based envelope construction method for freeform building.

Workspace Generation and Interference Optimization Algorithm by Work-type using 3D Model Object in a Construction Project (건설프로젝트의 작업유형별 3차원 작업공간 생성 및 간섭 최적화 방안)

  • Kim, HyeonSeung;Moon, HyounSeok;Kim, ChangHak;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1911-1918
    • /
    • 2014
  • The increase of input resources, such as labor and equipment, in a construction project causes workspace interference between activities and it influences on the productivity and quality of construction activities. To solve this problem, many studies related to the workspace interference have been performed, however they verified the workspace concerning with only the geometric location of activities or generated the shape of workspace by a whole object concept not separated units of detailed operations. It is difficult for project manager to reasonably analyze the workspace conflict, because the size of workspace cannot reflect the characteristics of an activity and input time of a resource. This paper presents a methodology that can generate three-dimensional models in order to optimize the workspace shape and size by considering with the characteristics of each activity and input time of each resource. The suggested method can be used for the active BIM system that optimizes the workspace conflict without additional construction duration and for the searching algorithm of optimized moving path for construction equipment.