BIM Application Method for the Quality Management of Modular Houses (모듈러주택 품질관리를 위한 BIM 적용 방안)

  • Lee, Dong Gun;Kim, Jin Won;Sohn, Jeong Rak
    • Land and Housing Review
    • /
    • v.10 no.2
    • /
    • pp.59-67
    • /
    • 2019
  • The recent paradigm shift in the construction industry has led to a growing demand for industrial construction. In particular, interest in modular housing, one of the areas of industrialization architecture, is soaring. Modular housing is a construction method for completing a building by transporting factory-built modules to the site and assembling them. However, modular housing in Korea has various problems such as errors in design books, lack of factory drawings, and lack of on-site construction plans. BIM is a tool for accumulating, producing and managing various information through 3D models and is a solution to solve various problems of modular housing. In this study, problems of modular housing and BIM utilization of modular housing were presented as ways to ensure the quality of modular housing. Therefore, this study analyzed the problems that are occurring in the construction process of modular housing. And, to address the problem of modular housing, BIM utilization measures were proposed for each modular process step. However, the application of BIM in domestic modular project is currently being carried out in pilot research project. Because of this, the BIM utilize method for modular housing is limited based on the BIM use for general projects and the examples for some modular pilot projects.

Interoperable Model Generation for Steel Structures with Structural BIM(S-BIM) according to the Improvement of Data Exchange System (S-BIM 기반 철골구조물에서의 정보호환체계 개선에 따른 상호운용 모델 구축)

  • Han, Sang-Woo;Cho, Young-Sang
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.656-659
    • /
    • 2011
  • 최근 우리나라뿐만 아니라 전 세계적으로 고층건물의 규모가 점점 커짐에 따라 고층 건물은 초기단계에서부터 막대한 자원과 비용이 발생하고 도중에 설계변경이 어렵거나 불가능한 경우가 많아졌다. 때문에 초기구조설계과정과 실시설계, 시공과정에서의 차이를 최대한 줄이는 것이 사업의 경제성을 좌우할 만큼 중요한 비중을 차지한다. 이러한 정보를 제대로 관리할 초고층 BIM 정보환경이 구축된다면 발주자 설계자 시공자가 얻게 될 이익은 결코 적지 않을 것이다. S-BIM 프로세스 상에서 철골조를 형성하기 위해서는 세 단계의 프로세스를 거치는데 구조 해석 및 설계 단계, 구조 해석 및 설계 결과 데이터베이스 구축, 철골구조설계 및 형상화 모듈에 의한 부재 생성이다. 본 연구에서는 구조해석 및 설계(Analysis and Design, A&D) 데이터베이스를 C#코딩을 통해 형상, 길이 및 위치 정보를 결정하는 데 필요한 정보를 모듈 상에 불러오고, 이를 이용한 부재의 치수, 길이, 좌표 값을 산정하였다. 모듈 결과 생성된 정보를 BIM 플랫폼 상에 모델링함으로써 사용자 입력 값을 최소로 하여 기존 BIM 플랫폼의 모델링 방법 대비, 생산성이 향상된 철골구조설계의 자동화를 구현해 보고자 하였다.

  • PDF

The Development of Automated System for 3D Design and Stability Evaluation of Caisson (케이슨의 3D 설계 및 안정 검토 자동화 시스템 개발)

  • Lee, Hurn-Min;Kim, Hyeon-Seung
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.105-113
    • /
    • 2020
  • In this research, the automated system for 3D modeling and stability evaluation of caisson was developed. It is possible to build a BIM model while examining the stability of the structures to improve the practical use of BIM technology. This study analyzed industry cases and guidelines for caisson stability evaluation and BIM-based modeling. As a result, the data for calculating the stability evaluation of caisson as well as the modeling parameters were derived. In particular, the automated system for 3D modeling, which reflects more than 30 parameters, allows for BIM models for various types of the caisson, such as open-cell caisson, open-cell caisson with uneven, slit caisson, slit caisson with uneven, and curved caisson. The study tested the proposed system using case studies and found that it helps not only to automate the BIM model with various caisson types as parameters but also to make partial shape changes accessible. The study also confirmed that the stability evaluation can be quickly carried out with shapes changed. Finally, the study results suggest that the proposed method should complete the task seven times as fast as the conventional work method.

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

3D BIM-based Building Energy Efficiency Solution for Carbon Emission Reduction (탄소저감을 위한 3D BIM 기반 건물 에너지 효율화 방안)

  • Lee, Dong Hwan;Kwon, Kee Jung;Shin, Ju Ho;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1235-1242
    • /
    • 2013
  • This study deals with the BIM (Building Information Modeling)-based energy performance analysis implemented in EnergyPlus. The BIM model constructed at Revit is updated at Design Builder, adding HVAC models and converted compatibly with the EnergyPlus. We can obtain the input values about HVAC system and building environment such as HVAC system efficient, the number of air changes and energy consumption of equipment on applying GAs (Genetic algorithms). After modification about HVAC system, Optimization about HVAC system energy consumption can be analyzed. In order to maximize the building energy performance, a genetic algorithm (GA)-based optimization technique is applied to the modified HVAC models. Throughout the proposed building energy simulation, finally, the best optimized HVAC control schedule for the target building can be obtained in the form of "supply air temperature schedule". Throughout the supply air temperature schedule is applied to energy performance simulation, we obtained energy saving effect result on simulation.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

A Study on The Correlation Analysis Between IFC and CityGML for Efficient Utilization of Construction Data and GIS Data (건설데이터와 GIS데이터의 효율적 활용을 위한 IFC와 CityGML 간의 연관성 분석 연구)

  • Hwang, Jung Rae;Kang, Tae Wook;Hong, Chang Hee
    • Spatial Information Research
    • /
    • v.20 no.5
    • /
    • pp.49-56
    • /
    • 2012
  • Recently, various researches have been attempted to link or integrate BIM and GIS. In particular, some of the researches were progressed to convert the data model between the BIM standard model IFC and the GIS standard model CityGML. However, it is hard to utilize the previous research results yet because characteristics and domains of between two data models are very different, In order to obtain the correlation between BIM and GIS, in this research, we analyzed the characteristics between IFC and CityGML objects of each LOD, And, we analyzed the correlation of IFC and CityGML by performing mapping between IFC and CityGML objects from view point of building with these characteristics. In this research, based on these correlation analysis results, we proposed the efficient interrelation plan between IFC and CityGML.

Applying Novelty Detection for Checking the Integrity of BIM Entity to IFC Class Associations (Novelty detection을 이용한 BIM객체와 IFC 클래스 간 매핑의 무결성 검토에 관한 연구)

  • Koo, Bonsang;Shin, Byungjin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.78-88
    • /
    • 2017
  • With the growing use of BIM in the AEC industry, various new applications are being developed to meet these specific needs. Such developments have increased the importance of Industry Foundation Classes, which is the international standard for sharing BIM data and thus ensuring interoperability. However, mapping individual BIM objects to IFC entities is still a manual task, and is a main cause for errors or omissions during data transfers. This research focused on addressing this issue by applying novelty detection, which is a technique for detecting anomalies in data. By training the algorithm to learn the geometry of IFC entities, misclassifications (i.e., outliers) can be detected automatically. Two IFC classes (ifcWall, ifcDoor) were trained using objects from three BIM models. The results showed that the algorithm was able to correctly identify 141 of 160 outliers. Novelty detection is thus suggested as a competent solution to resolve the mapping issue, mainly due to its ability to create multiple inlier boundaries and ex ante training of element geometry.

A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.