• Title/Summary/Keyword: BIM(building information model)

Search Result 421, Processing Time 0.025 seconds

A Study of the Establishment of BIM Design Environment based on Virtual Desktop Infrastructure(VDI) of Cloud Computing Technology (클라우드 컴퓨팅 기술을 활용한 데스크탑 가상화 기반의 BIM 설계 환경 구축에 관한 연구)

  • Shin, Joonghwan;Lee, Kyuhyup;Kwon, Soonwook;Choi, Gyuseong;Ko, Hyunglyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.118-128
    • /
    • 2015
  • Recently BIM technology has been expanded for using in construction project. Due to the high-cost of BIM infrastructure development, lack of regulations, lack of process and so forth, usage of BIM has been delayed than initial expectations. In design phase, especially, collaboration based on BIM system has been a key factor for successful next generation building project. Through the analysis of current research trends about IT technologies, virtualization and BIM service, data exchange such as drawings, 3D model, object data, properties using cloud computing and virtual server system is defined as a most successful solution. The purpose of this study is to enable the cloud computing BIM server to provide several main functions such as editing models, 3D model viewing and checking, mark-up and snapshot in high-performance quality by proper design of VDI system. Concurrent client connection performance is a main technical index of VDI. Through testing of test-bed server client, developed VDI system's multi-connect control is evaluated. Performance-test result of BIM server VDI effect to development direction of cloud computing BIM service for commercialization.

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

Development of AAB (Algorithm-Aided BIM) Based 3D Design Bases Management System in Nuclear Power Plant (Algorithm-Aided BIM 기반 원전 3차원 설계기준 관리시스템 개발)

  • Shin, Jaeseop
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.28-36
    • /
    • 2019
  • The APR1400 (Advanced Power Reactor 1400MW) nuclear power plant is a large-scale national infrastructure facility with a total project cost of 8.6 trillion won and a project period of 10 years or more. The total project area is about 2.17 million square meters and consists of more than 20 buildings and structures. And the total number of drawings required for construction is about 65,000. In order to design such a large facility, it is important to establish a design standard that reflects the design intent and can increase conformity between documents (drawings). To this end, a design bases document (DBD) reflecting the design bases that extracted in regulatory requirements (e.g. 10CFR50, Korean Law, etc.) is created. However, although the design bases are important concepts that are a big framework for the whole design of the nuclear power plant, they are managed in 2-dimensional by the experts in each field fragmentarily. Therefore, in order to improve the usability of building information, we developed BIM(Building Information Model) based 3-dimensional design bases management system. For this purpose, the concept of design bases information layer (DBIL) was introduced. Through the simulation of developed system, design bases attribute and element data extraction for each DBIL was confirmed, and walls, floors, doors, and penetrations with DBIL were successfully extracted.

Automatic indoor progress monitoring using BIM and computer vision

  • Deng, Yichuan;Hong, Hao;Luo, Han;Deng, Hui
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.252-259
    • /
    • 2017
  • Nowadays, the existing manual method for recording actual progress of the construction site has some drawbacks, such as great reliance on the experience of professional engineers, work-intensive, time consuming and error prone. A method integrating computer vision and BIM(Building Information Modeling) is presented for indoor automatic progress monitoring. The developed method can accurately calculate the engineering quantity of target component in the time-lapse images. Firstly, sample images of on-site target are collected for training the classifier. After the construction images are identified by edge detection and classifier, a voting algorithm based on mathematical geometry and vector operation will divide the target contour. Then, according to the camera calibration principle, the image pixel coordinates are conversed into the real world Coordinate and the real coordinates would be corrected with the help of the geometric information in BIM model. Finally, the actual engineering quantity is calculated.

  • PDF

Development of Graph based Deep Learning methods for Enhancing the Semantic Integrity of Spaces in BIM Models (BIM 모델 내 공간의 시멘틱 무결성 검증을 위한 그래프 기반 딥러닝 모델 구축에 관한 연구)

  • Lee, Wonbok;Kim, Sihyun;Yu, Youngsu;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.45-55
    • /
    • 2022
  • BIM models allow building spaces to be instantiated and recognized as unique objects independently of model elements. These instantiated spaces provide the required semantics that can be leveraged for building code checking, energy analysis, and evacuation route analysis. However, theses spaces or rooms need to be designated manually, which in practice, lead to errors and omissions. Thus, most BIM models today does not guarantee the semantic integrity of space designations, limiting their potential applicability. Recent studies have explored ways to automate space allocation in BIM models using artificial intelligence algorithms, but they are limited in their scope and relatively low classification accuracy. This study explored the use of Graph Convolutional Networks, an algorithm exclusively tailored for graph data structures. The goal was to utilize not only geometry information but also the semantic relational data between spaces and elements in the BIM model. Results of the study confirmed that the accuracy was improved by about 8% compared to algorithms that only used geometric distinctions of the individual spaces.

Comparison of 3D Reconstruction Methods to Create 3D Indoor Models with Different LODs

  • Hong, Sungchul;Choi, Hyunsang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.674-675
    • /
    • 2015
  • A 3D indoor model becomes an indiscernible component of BIM (Building Information Modeling) and GIS (Geographic Information System). However, a huge amount of time and human resources are inevitable for collecting spatial measurements and creating such a 3D indoor model. Also, a varied forms of 3D indoor models exist depending on their purpose of use. Thus, in this study, three different 3D indoor models are defined as 1) omnidirectional images, 2) a 3D realistic model, and 3) 3D indoor as-built model. A series of reconstruction methods is then introduced to construct each type of 3D indoor models: they are an omnidirectional image acquisition method, a hybrid surveying method, and a terrestrial LiDAR-based method. The reconstruction methods are applied to a large and complex atrium, and their 3D modeling results are compared and analyzed.

  • PDF

Probabilistic GMP Calculation Method based on BIM (BIM기반 확률론적 GMP 산정방안에 관한 연구)

  • Go, Gun-Ho;Jin, Zheng-Xun;Kim, Hyun-Joo;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.122-123
    • /
    • 2018
  • Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.

  • PDF

Construction Process Analysis of Han-Ok for BIM Based Modern Han-Ok Construction Simulation (BIM 기반의 현대식 한옥 시공시뮬레이션 구현을 위한 한옥 공정분석 연구)

  • Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.3-10
    • /
    • 2011
  • Currently, technologies for industrialization and dissemination for Han-Ok are developed actively. Also BIM technologies are actively developed. However, it is difficult to find the research and study cases for construction method and process for Han-Ok. BIM is the technology for managing information with element as a unit for building design, construction and management, and it is closely related to Han-Ok using assembling method for building construction. We analyzed the basic construction processes for IK-Gong and MinDoRi house, typical types of Han-Ok. Also we developed the Work Breakdown Structure of construction process for Han-Ok and suggested the method for construction simulation using BIM. Simple BIM model of Han-Ok which is Ik-Gong type is used for case study. It was possible to link automatically between 3D elements objects and construction activities about 95% in the case study. More studies of construction method for various type of Han-Ok and rules for link between elements and construction activities are required for Industrialization and dissemination of Han-Ok.

Integrating a Machine Learning-based Space Classification Model with an Automated Interior Finishing System in BIM Models

  • Ha, Daemok;Yu, Youngsu;Choi, Jiwon;Kim, Sihyun;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.60-73
    • /
    • 2023
  • The need for adopting automation technologies to improve inefficiencies in interior finishing modeling work is increasing during the Building Information Modeling (BIM) design stage. As a result, the use of visual programming languages (VPL) for practical applications is growing. However, undefined or incorrect space designations in BIM models can hinder the development of automated finishing modeling processes, resulting in erroneous corrections and rework. To address this challenge, this study first developed a rule-based automated interior finishing detailing module for floors, walls, and ceilings. In addition, an automated space integrity checking module with 86.69% ACC using the Multi-Layer Perceptron (MLP) model was developed. These modules were integrated into a design automation module for interior finishing, which was then verified for practical utility. The results showed that the automation module reduced the time required for modeling and integrity checking by 97.6% compared to manual work, confirming its utility in assisting BIM model development for interior finishing works.

Artificial Intelligence Image Segmentation for Extracting Construction Formwork Elements (거푸집 부재 인식을 위한 인공지능 이미지 분할)

  • Ayesha Munira, Chowdhury;Moon, Sung-Woo
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.1-9
    • /
    • 2022
  • Concrete formwork is a crucial component for any construction project. Artificial intelligence offers great potential to automate formwork design by offering various design options and under different criteria depending on the requirements. This study applied image segmentation in 2D formwork drawings to extract sheathing, strut and pipe support formwork elements. The proposed artificial intelligence model can recognize, classify, and extract formwork elements from 2D CAD drawing image and training and test results confirmed the model performed very well at formwork element recognition with average precision and recall better than 80%. Recognition systems for each formwork element can be implemented later to generate 3D BIM models.