• Title/Summary/Keyword: Available Capacity

Search Result 1,160, Processing Time 0.028 seconds

A Study on Level-of-Service Changes of Expressway in Accordance with the Revision of Traffic Capacity at Work-Zone (교통용량 개정에 따른 고속도로 공사구간의 서비스 수준에 대한 연구)

  • Ryu, SungWoo;Park, Kwon-Jea;Han, SeungHwan;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.16 no.3
    • /
    • pp.109-117
    • /
    • 2014
  • PURPOSES : This study analyzes the available working time at work-zone on the Expressway in accordance to the new capacity manual. METHODS : Sensitivity analysis on variables were conducted to calculate the adjusted capacity at work-zone based on previous researches. RESULTS : The main factors which affect available working time at the work-zone were its capacity, number of lanes, terrain and lane width. Other factors have minimal effect on the available working time. Based on the analysis, a calendar of lane closures was suggested. CONCLUSIONS : A series of studies concluded that the capacity at work-zone in the new capacity manual reduced to 76-82% of the existing manual. As such, the available working time decreased. Furthermore, the factors affecting the available working time needs to be considered when making a plan to rehabilitate the distressed pavement.

Improvement of Available Battery Capacity in Electric Vehicles

  • Liu, Yow-Chyi
    • Journal of Power Electronics
    • /
    • v.13 no.3
    • /
    • pp.497-506
    • /
    • 2013
  • This paper proposes a new method to improve the available battery capacity in electric vehicles by connecting lead-acid batteries with lithium-ion battery in parallel to supply power. In addition, this method combines the discharge characteristics of batteries to improve their efficiency and lower their cost for electric vehicles. A lithium-ion battery set is used to connect with N sets of lead-acid batteries in parallel. The lead-acid battery supplies the initial power. When the lead-acid battery is discharged by the load current until its output voltage drops to the cut-off voltage, the power management unit controls the lead-acid battery and changes it to discharge continuously with a small current. This discharge can be achieved by connecting the lead-acid battery to a lithium-ion battery in parallel to supply the load power or to discharge its current to another lead-acid or lithium-ion battery. Experimental results demonstrates that the available capacity can be improved by up to 30% of the rated capacity of the lead-acid batteries.

Analysis of Counterflow Heat Exchangers with the Concept of Available Energy (가용에너지를 이용한 대향류 열교환기의 해석)

  • 김수연;정평석
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.16 no.11
    • /
    • pp.2189-2195
    • /
    • 1992
  • The performance of heat exchanger as an energy conversion device can be described by the available energy output and efficiency. The efficiency is defined as the ratio of the available energy output and the exergy of the heat source flow. In present study, a counterflow heat exchanger is analyzed and the conditions to obtain maximum output is numerically determined. As a result, the avilable energy obtained by the cold flow can be determined as functions of the heat capacity flow, the cold flow inlet temperature and the heat transfer capacity of heat exchanger. At the maximum output condition the heat capacity flow of the cold fluid is larger than that of the heat source, and the heat capacity flow ratio is equal to the ratio of the cold flow inlet temperature and the atmospheric temperature. And the avilable energy output increases as the heat transfer capacity of the heat exchanger become larger, but in the economic point of view there is also an optimum heat transfer capacity for a given heat source flow.

Probabilistic Approach to Time Varying Available Transfer Capability Calculation (확률론적 기법을 이용한 시변 가용송전용량 결정)

  • Shin, Dong-Jun;Kim, Kyu-Ho;Kim, Jin-O
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.11
    • /
    • pp.533-539
    • /
    • 2005
  • According to NERC definition, Available Transfer Capability (ATC) is a measure of the transfer capability remaining in the physical transmission network for the future commercial activity. To calculate Available Transfer Capability, accurate and defensible Total Transfer Capability, Capacity Benefit Margin and Transmission Reliability Margin should be calculated in advance. This paper proposes a method to quantify time varying Available Transfer Capability based on probabilistic approach. The uncertainties of power system and market are considered as complex random variables. Total Transfer Capability is determined by optimization technique such as SQP(Sequential Quadratic Programming). Transmission Reliability Margin with the desired probabilistic margin is calculated based on Probabilistic Load Flow analysis, and Capacity Benefit Margin is evaluated using LOLE of the system. Suggested Available Transfer Capability quantification method is verified using IEEE RTS with 72 bus. The proposed method shows efficiency and flexibility for the quantification of Available Transfer Capability.

A New Available Bandwidth Measurement Technique with Accurate Capacity Estimation (정확한 고정대역폭 추정을 통한 새로운 가용대역폭 측정 기법)

  • Cho Seongho;Choe Han;Kim Chong-kwon
    • Journal of KIISE:Information Networking
    • /
    • v.32 no.4
    • /
    • pp.495-507
    • /
    • 2005
  • Measuring the end-to-end available bandwidth in the Internet is a useful tool for distributedapplication services or QoS (Quality-of-Service) guarantee. To measure the end-to-end available bandwidth, Single-hop Gap model-based packet train measurement techniques are well-known. However, the error of packet train output gap can happen by network topologies. This error of the output gap causes the inaccuracy of the available bandwidth measurement. In this paper, we propose a new end-to-end available bandwidth measurement technique with accurate capacity measurement and fast convergence methods. To solve the erroneous capacity measurement problem of the back-to-back packet train transmission, we propose a new available bandwidth measurement method by decoupling the capacity measurement with the initial gap of the packet train. Also, we propose a new technique to predict the proper initial gap of the packet train for faster convergence. We evaluate our proposed method by the simulation in various topologies comparing with previous methods.

Moral Hazard for the Available Capacity in Electricity Capacity Markets (용량시장의 발전가능용량 전략적 입찰 분석)

  • Kim, Jin-Ho;Park, Jong-Bae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2150-2156
    • /
    • 2010
  • In this paper, we investigate how an electricity capacity market design may encourage generators to exaggerate their available capacity. In order for an analytical approach, a two player game model is introduced. We focus on two pure strategy Nash equilibria: an equilibrium at which generators offer their true capacities, and an equilibrium at which generators offer exaggerated capacities. The latter case is caused by asymmetries of information between players and so called 'moral hazard' in terms of the economics literature. This paper shows that, considering practical electricity markets, the moral hazard case is highly probable. Moreover, it is shown that, with the considered capacity market design in the real world, the better the electricity energy market performs, the higher the risk of moral hazard becomes.

KTX Impact on Train Operation Pattern ; An Empirical Analysis (KTX 개통후 서울~천안구간의 열차운행패턴 분석)

  • Lee Jin-Sun;Kim Kyoung-Tae
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.6 s.31
    • /
    • pp.507-512
    • /
    • 2005
  • Railroad transportation system has experienced major changes due to KTX introduction. Kyungbu corridor especially Seoul to Cheonan has line capacity problem and its solution has been a primary concern to researchers and policy decision makers. This study explored pattern of train operation between Seoul and Cheonan after the introduction of KTX in 2004. Both the number of trains and available seat capacity per day have increased but maximum number of trains per specific hour has not been changed much. Demand for train shows that if concentrated in a specific time, so number of trains during the peak hour should be increased. But, it is difficult ? 새 line capacity, so increasing seat capacity per train might be an option. An increase in an avaliable sear should be considered the characteristics of each train lines.

A Study on Analysis of Reserves and Available Capacity of Unutilized Energy in Rural Community (농어촌지역 미활용에너지의 부존량과 이용 가능량 분석)

  • Park, Mi-Lan;Ryoo, Yeon-Su;Kim, Jin-Wook;Lee, Yong-Uk;Bae, Sung-Don;Chae, Kap-Byung
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.6
    • /
    • pp.19-25
    • /
    • 2014
  • Alternative sources of energy take a higher interest in order to reduce the greenhouse gas under the Climate Change Convention, fossil fuel consumption, and lower social anxiety about nuclear power such as crisis involving the Fukushima plant, problem of obsolete equipment. The energy consumption of agriculture, forestry and fisheries in South Korea is 3,082,000toe by 2011, reliance on electrical energy(35%) and oil(57.2%) is very high with 92.2%. In this study, we examined reserves and available capacity of temperature difference energy for thermal discharge from plant, treated sewage, river water, dam, and agricultural reservoir in rural community. Reserves of unutilized energy are 455,735Tcal/yr in rural community, these accounts for 78% of total reserves 582,385Tcal/y. Thermal discharge from plant has the most reserves of unutilized energy in rural community, it is estimated that it has the reserves of 277,410Tcal/y. Available capacity of unutilized energy in rural community is total 134,147Tcal/y, thermal discharge from plant available for heating is the most 128,035Tcal/y, and it shows in the order of treated sewage 4,318Tcal/y, river water 1,653Tcal/y, and reservoir 141Tcal/y. Elevating temperature area of green house by 2012 is 21,208ha. The amount of energy required for heating the greenhouse a year is dbout 11,365Tcal/y with 8.5% of the total available capacity of unutilized energy.

Seismic Design of Mid-to-Low Rise Steel Moment Frames Based on Available Connection Rotation Capacity (접합부 회전능력에 기초한 중/저층 철골모멘트골조의 내진설계)

  • Ahn, Jae Kwon;Lee, Cheol Ho
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.6
    • /
    • pp.715-723
    • /
    • 2007
  • A displacement-based seismic design procedure was proposed for mid-to-low-rise steel moment frames. The proposed method was totally different from the current R-factor approach in that it directly uses available connection rotation capacity as a primary design variable. To this end, the relationship between available connection rotation capacity and seismic response modification (R factor) was established first; this relationship has been a missing link in current ductility-based design practice. A step-by-step displacement-based iterative design procedure was then proposed and verified using inelastic dynamic analysis.

Order Promising Rolling Planning with ATP/CTP Reallocation Mechanism

  • Chen, Juin-Han;Lin, James T.;Wu, Yi-Sheng
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.1
    • /
    • pp.57-65
    • /
    • 2008
  • Available-to-promise (ATP) exhibiting availability of manufacturing resources can be used to support customer order promising. Recently, one advanced function called Capable-to-promise (CTP) is provided by several modern APS (advanced planning system) that checks available capacity for placing new production orders or increasing already scheduled production orders. At the customer enquiry stage while considering the order delivery date and quantity to quote, both ATP and CTP are allocated to support order promising. In particular, current trends of mass customization and multi-side production chain derive several new constraints that should be considered when ATP/CTP allocation planning for order promising - such as customer's preference plants or material vendors, material compatibility, etc. Moreover, ATP/CTP allocation planning would be executed over a rolling time horizon. To utilize capacity and material manufacturing resource flexibly and fulfill more customer orders, ATP/CTP rolling planning should possess resource reallocation mechanism under the constraints of order quantities and delivery dates for all previous order promising. Therefore, to enhance order promising with reliability and flexibility to reallocate manufacturing resource, the ATP/CTP reallocation planning mechanism is needed in order to reallocate material and capacity resource for fulfilling all previous promised and new customer orders beneficially with considering new derived material and capacity constraints.