• Title/Summary/Keyword: Automation Mapping

Search Result 77, Processing Time 0.022 seconds

Library-based Mapping of Application to Reconfigurable Array Architecture

  • Han, Kyu-Seung;Choi, Ki-Young
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.9 no.4
    • /
    • pp.209-215
    • /
    • 2009
  • Reconfigurable array architecture is recently attracting much attention. It is a flexible hardware architecture, which can dynamically change its configuration to execute various functions while maintainning high performance. However, pursuing flexibility and performance at the same time leads to complexity, thereby makes the mapping of applications a difficult process. There have been attempts to use compiler or high level synthesis techniques to solve the problem. In this paper, we propose yet another method, which uses libraries for the mapping to provide an abstracttion of the internal structure and at the same time to reduce the development time and efforts through the automated process. We have selected a JPEG decoder as an example to apply the proposed method. As a result, we obtained about 20% less performance compared to manual mapping but development time is dramatically reduced to less than 1%.

Design of a Feature-based Multi-viewpoint Design Automation System

  • Lee, Kwang-Hoon;McMahon, Chris A.;Lee, Kwan-H.
    • International Journal of CAD/CAM
    • /
    • v.3 no.1_2
    • /
    • pp.67-75
    • /
    • 2003
  • Viewpoint-dependent feature-based modelling in computer-aided design is developed for the purposes of supporting engineering design representation and automation. The approach of this paper uses a combination of a multi-level modelling approach. This has two stages of mapping between models, and the multi-level model approach is implemented in three-level architecture. Top of this level is a feature-based description for each viewpoint, comprising a combination of form features and other features such as loads and constraints for analysis. The middle level is an executable representation of the feature model. The bottom of this multi-level modelling is a evaluation of a feature-based CAD model obtained by executable feature representations defined in the middle level. The mappings involved in the system comprise firstly, mapping between the top level feature representations associated with different viewpoints, for example for the geometric simplification and addition of boundary conditions associated with moving from a design model to an analysis model, and secondly mapping between the top level and the middle level representations in which the feature model is transformed into the executable representation. Because an executable representation is used as the intermediate layer, the low level evaluation can be active. The example will be implemented with an analysis model which is evaluated and for which results are output. This multi-level modelling approach will be investigated within the framework aimed for the design automation with a feature-based model.

Automation of Photogrammetric Tasks (항공사진측량의 자동화)

  • 염재홍
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2000.10a
    • /
    • pp.16-24
    • /
    • 2000
  • Automation of the mapping process is a major concern in the geomatics discipline as the role of geospatial information is becoming more important in the information society. Automation has been successful in some tasks of the mapping process, whereas it is faced with difficulties in other more complex tasks. Some of the automation technologies which have been applied to the production of maps are reviewed in later paragraphs.

  • PDF

Research on Protocol Conversion Gateway based on IEEE1815.1 (IEEE 1815.1 기반 이기종 프로토콜 변환 게이트웨이 기술 연구)

  • Lee, Seokjun;Kwon, Sungmoon;Shon, Taeshik;Park, Sungwan
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.26 no.5
    • /
    • pp.1201-1209
    • /
    • 2016
  • While the legacy electric grid evolving into the smart grid, various communication standards have been used for interoperability between many components. In this situation, the needs emerged for protocol conversion and mapping method for connecting the outside components to the operation center. In this paper, according to the surge of IEC 61850-based substation automation, we studied the protocol conversion gateway for linking legacy DNP3-based control center and IEC 61850-based substation automation. This paper is based on the IEEE 1815.1 standard for the protocol mapping. We suggested the direction of development the gateway and developed prototype for evaluate the proposed gateway. Also, we bring up a security problem and give a solution.

Software Development for Glass-Bulb Automatic Design Integrated System Using Design Axiom (설계공리를 이용한 유리벌브 제품설계 자동화 시스템 구축)

  • Do, Sung-Hee;Park, Gyung-Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.20 no.4
    • /
    • pp.1333-1346
    • /
    • 1996
  • As the automation system in manufacturing field works more efficientely, the automation scheme is applied to many areas. In order to reduce the entire manufacturing, cost the design process must be automated. However, design process is so complicated, it is very difficult to construct the design automation system. The axiomatic approach to design provides a general theoretical framework for all design fields, including mechanical design. The key concepts of axiomatic design are : the existence of domains, the characteristic vectors within the domains that can be decomposed into hierarchies through zigzagging between the domains, and the design axioms. Using this approach, the glass bulb design process was analyzed and the design automation software was developed. Through menu display, a user can select or furnish the design input and generate the drawing with ease.

Scan-to-Geometry Mapping Rule Definition for Building Plane Reverse engineering Automation (건축물 평면 형상 역설계 자동화를 위한 Scan-to-Geometry 맵핑 규칙 정의)

  • Kang, Tae-Wook
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.21-28
    • /
    • 2019
  • Recently, many scan projects are gradually increasing for maintenance, construction. The scan data contains useful data, which can be generated in the target application from the facility, space. However, modeling the scan data required for the application requires a lot of cost. In example, the converting 3D point cloud obtained from scan data into 3D object is a time-consuming task, and the modeling task is still very manual. This research proposes Scan-to-Geometry Mapping Rule Definition (S2G-MD) which maps point cloud data to geometry for irregular building plane objects. The S2G-MD considers user use case variability. The method to define rules for mapping scan to geometry is proposed. This research supports the reverse engineering semi-automatic process for the building planar geometry from the user perspective.

Thermal Analysis of High Density Permanent Magnet Synchronous Motor Based on Multi Physical Domain Coupling Simulation

  • Chen, ShiJun;Zhang, Qi;He, Biao;Huang, SuRong;Hui, Dou-Dou
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.1
    • /
    • pp.91-99
    • /
    • 2017
  • In order to meet the thermal performance analysis accuracy requirements of high density permanent magnet synchronous motor (PMSM), a method of multi physical domain coupling thermal analysis based on control circuit, electromagnetic and thermal is presented. The circuit, electromagnetic, fluid, temperature and other physical domain are integrated and the temperature rise calculation method that considers the harmonic loss on the frequency conversion control as well as the loss non-uniformly distributed and directly mapped to the temperature field is closer to the actual situation. The key is to obtain the motor parameters, the realization of the vector control circuit and the accurate calculation and mapping of the loss. Taking a 48 slots 8 poles high density PMSM as an example, the temperature rise distribution of the key components is simulated, and the experimental platform is built. The temperature of the key components of the prototype machine is tested, which is in agreement with the simulation results. The validity and accuracy of the multi physical domain coupling thermal analysis method are verified.

Applicability Evaluation of Mobile Mapping System for Road Construction Surveying (도로 시공측량을 위한 모바일맵핑시스템의 적용성 평가)

  • Park, Joon Kyu;Lee, Keun Wang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.3
    • /
    • pp.169-175
    • /
    • 2022
  • Korea's construction industry has a shortage and aging of construction manpower, low productivity compared to other industries, and a high rate of industrial accidents. The Ministry of Land, Infrastructure and Transport is preparing for the 4th industrial revolution and is expanding investment in construction automation and innovative growth engines to improve productivity in the construction industry. In order for new technologies to be utilized in the road construction field, the accuracy of the technologies and the applicability of each type of work must be evaluated. In this study, the accuracy of the mobile mapping system was tried to verify based on the relevant work regulations, and to suggest the applicability of the mobile mapping system to high-speed driving tracks through data acquisition and analysis on road construction sites. The accuracy of the equipment used in the study was verified in accordance with the relevant work regulations, and the possibility of applying the mobile mapping system used for the study to road construction surveying was presented with a maximum error of less than 10cm in the horizontal and vertical directions. In addition, the possibility of utilizing the road construction survey using the mobile mapping system was presented through comparison with the existing method for data acquisition time for construction surveying, production of construction status survey results, and calculation of heatmap and earthworks. In the future, the use of construction status surveying of the mobile mapping system will greatly improve the efficiency of construction work.

A Study About Distribution Automation System Based on CIM (CIM 기반의 Distribution Automation System에 관한 연구)

  • Lee, Hee-Joo;Seo, Jeong-Il;Han, Ju-Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.5
    • /
    • pp.913-920
    • /
    • 2011
  • Distribution systems for operating the various systems should be operated organically. Distribution systems for organic operations extend the functionality of the system and system integration for the extension is doing. However, in systems integration for each unique non-standard definition of linkage and exchange systems are used. Non-standard definition of a unique linkage and exchange systems in the maintenance and expansion will result in many negative results. To solve these problems, the system and the exchange of information about the links between systems should define standards. IEC (International Electrotechnical Commission) power to solve these problems in the field of the Common Information Model (Common Information Model, CIM) standard (IEC61970, IEC61968) is defined as the transmission and distribution system integration and standardization for the exchange of information. In this paper, standardized system for building CIM-based distribution automation system should describe the process of building. In addition, the process of establishing a common information model needed (CIM) defined and associated services for a defined set of models is proposed in the standardization process.