• Title/Summary/Keyword: Authorized inspection agency

Search Result 4, Processing Time 0.019 seconds

Human resource planning for authorized inspection activity

  • Lee, Seung-hee;Field, Robert Murray
    • Nuclear Engineering and Technology
    • /
    • v.51 no.2
    • /
    • pp.618-625
    • /
    • 2019
  • When newcomer countries consider a nuclear power programme, it is recognized that the most important organizations are the Nuclear Energy Programme Implementing Organization (NEPIO), the regulator, and an operating organization. Concerning the number of construction delays these days, one of the essential organizations is an Authorized Inspection Agency (AIA). According to World Nuclear Industry Status Report, all of the reactors under construction in eight out of the thirteen countries have experienced delays. Globally, the Flamanville 3 project and Sanmen Unit 1 are 6.5 years and 5 years late respectively. One of the major reasons of delay is due to inappropriate manufacturing and inspection on safety class components. The recommendations are made to develop such an organization: (i) find existing inspection organizations in relevant industries, (ii) contract with expatriates who have experience on nuclear inspection, (iii) develop a legislative framework to authorize the inspection organization with enforcement, (iv) include a contract clause in the BIS for developing the AIA, (v) hold training programmes from vendor country, (vi) during manufacturing and construction, domestic AIA shall be involved.

주택자재 품질검사제도

  • Jeong, Jae-Gun
    • Fire Protection Technology
    • /
    • s.18
    • /
    • pp.36-39
    • /
    • 1995
  • Our laboratory(FILK), an authorized quality inspection agency in Choong-Chung Buk Do and Kyung-Ki Do, has been executing quality inspection of the products of housing material manufacturers. This report, made for more details on inspection, introduces the quality inspection system of housing materials.

  • PDF

Study on Numerical Analysis for Structural Safety Verification of Overflow Preventer System for LNG Tank (LNG탱크 수위 넘침 방지 시스템의 구조 안전성을 검증하기 위한 수치 해석에 관한 연구)

  • Ryu, Young-Chun;Park, Young-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.4
    • /
    • pp.1801-1806
    • /
    • 2014
  • This paper proposed the design technology for the level meter of the overflow preventer system of LNG storage tank. The parts of LNG ship should be developed under considering the cryogenic environment. Therefore, we proposed the structure of level meter to prevent overflow of LNG tank using the numerical analysis method. The proposed level meter for the overflow preventer is manufactured and the performance is verified through international authorized inspection agency.

The Development of EPSM(Exciter Power Supply Module) Localization in Generator Exciter(EX2100) System (발전기 여자기시스템 주제어전원공급장치 국산화 개발)

  • Lee, Ki-Seon;Park, Jung-Cheul;Chu, Soon-Nam
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.2
    • /
    • pp.101-107
    • /
    • 2016
  • The main target in this paper is the localization of VME Type EPSM in Generator Exciter(EX2100) System. Developed EPSM has the compatibility with the existing product in the structure and shape and electrical feature and so on, but it has a much improved capacity and reliability in comparison with origin company product. this paper, to improve these functions, put emphasis on protection, monitoring, power capacity increase(over 120%), an enlarged scale of input voltage supply, AC/DC dual voltage use and so on. After manufacturing product localization, it was carried out several tests for the performance and reliability verification of developed product. These tests were performed in Authorized Inspection Agency(KTL) and field application test and maker self-test were additionally performed. Finally, the results of all tests were "success".