• Title/Summary/Keyword: Assembly Work

Search Result 517, Processing Time 0.035 seconds

Constructing the Development of Solids by Personal Computer (개인용 컴퓨터를 이용한 전개도 작성에 관한 연구)

  • 채희창;정인성
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.14 no.2
    • /
    • pp.367-375
    • /
    • 1990
  • A data structure representing 3-D objects was designed for the personal computer. It is very simple to be used in the personal computers which have small memory and low speed. A homogeneous transformation for developing 3-D objects was derived. Each developing procedure consists of five transformations : one translational-three rotational-one translational. Developing a solid is a creative work. So the results of developing vary with the order of surfaces to be developed. One method to reduce the length of seam was considered. The programs used in this study were written in Pascal and Assembly and a modeller that generates 3-D primitives was included. This program is an interactive dual-screen system. While all the menus in Korean are displayed at the monochrome monitor, the development figures with projective views are drawn at the color monitor. The program has wide applications for plate works.

Measurement technology of performance evaluation of optical collimator with high-functionality (고기능 광콜리메이터 성능평가 측정 기술)

  • Choi, D.S.;Je, T.J.;Hwang, K.H.;Kang, Y.H.
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.1355-1360
    • /
    • 2003
  • Currently, product of optical collimator for optical communication is depending on handiwork, and some companies are propelling semi-automatic system composite of manual and automatic operations. In this point of time, the importance of automatic system of optical collimator for optical communication is taking its place as a core technology in the development of parts with high-efficiency of optical communication. In order to develop such an optical collimator in this study, we designed an automatic assembly system, and developed a software for the system operation. At a result of that, we could carry out a single work process individually running processes of collimator fabrication, a constant work process constantly running all of the processes, and performance evaluation of the collimator.

  • PDF

Using Geometric Constraints for Feature Positioning (특징형상 위치 결정을 위한 형상 구속조건의 이용)

  • Kim, S.H.;Lee, K.W.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.13 no.9
    • /
    • pp.84-93
    • /
    • 1996
  • This paper describes the development of new feature positioning method which embedded into the top-down assembly modeling system supporting conceptual design. In this work, the user provides the geometric constraints representing the position and size of features, then the system calculates their proper solution. The use of geometric constraints which are easy to understand intuitively enables the user to represent his design intents about geometric shapes, and enables the system to propagate the changes automatically when some editing occurs. To find the proper solution of given constraints, the Selective Solving Method in which the redundant or conflict equations are detected and discarded is devised. The validity of feature shapes satisfying the constraints can be maintained by this technique, and under or over constrained user-defined constraints can also be estimated. The problems such as getting the initial guess, controlling the multiple solutions, and dealing with objects of rotational symmetry are also resolved. Through this work, the feature based modeling system can support more general and convenient modeling method, and keeps the model being valid during modifying models.

  • PDF

A Cost Model for an Activity in Ship Production (선박 건조의 생산단위에 대한 Cost Model)

  • Jeong-Je Kim
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.28 no.1
    • /
    • pp.197-205
    • /
    • 1991
  • A methodology of constructions a mathematical cost model for an activity constituting ship hull assembly process is proposed. The relationship between number of workers and processing time required for an activity can be formulated using an work study method, then manhours and shop floor area-hours required are calculated accordingly. The costs for unit manhour and unit shop floor area-hour respectively are calculated by distributing the overall annual cost of the company to the overall production resources consummed during the year. A general procedure of implementing the methodology has been demonstrated through a test on an exampled activity drawn from a real process.

  • PDF

Error Recovery Script of Immunity Debugger for C# .NET Applications

  • Shinde, Rupali;Choi, Min;Lee, Su-Hyun
    • Journal of Information Processing Systems
    • /
    • v.15 no.6
    • /
    • pp.1438-1448
    • /
    • 2019
  • We present a new technique, called VED (very effective debugging), for detecting and correcting division by zero errors for all types of .NET application. We use applications written in C# because C# applications are distributed through the internet and its executable format is used extensively. A tool called Immunity Debugger is used to reverse engineer executable code to get binaries of source code. With this technique, we demonstrate integer division by zero errors, the location of the error causing assembly language code, as well as error recovery done according to user preference. This technique can be extended to work for other programming languages in addition to C#. VED can work on different platforms such as Linux. This technique is simple to implement and economical because all the software used here are open source. Our aims are to simplify the maintenance process and to reduce the cost of the software development life cycle.

A Study on MES Construction for Automobile Plant in China (중국 자동차 공장의 MES 구축 연구)

  • Lee, Doo-Yong;Zhang, Jing-Lun;Jang, Jung-Hwan;Yoo, Sung-Hee;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.265-270
    • /
    • 2012
  • This paper deals with the application and effects of MES for H automobile plant in China. There existed the production planning and the different work order in PL painting plant, but we can simultaneously prepare the painting parts and parts delivery and assembly according to painting color by introducing MES. We can respond the change of production planning and operate integratively the PL painting, parts storage and parts delivery and then we can results in reasonable logistics. We obtained the exact production information, correct work order, precise delivery order. We obtained not only the improvement of logistics but also the reduction of inventory.

Waste Elimination in Construction Process using Value Stream Analysis - Focused on Waste Elimination of Re-bar Works (가치흐름 분석을 통한 건설프로세스의 낭비제거 방안)

  • Mun Jeong-Mun;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.416-421
    • /
    • 2001
  • The domestic reinforcement concrete works have mainly worked the process of re-bar fabrication/assembly on site and re-bar works affected by structural safety, durability, and schedule with form work. Accordingly, This study analyzes the process of re-bar fabrication/assembly on site to apply lean production principles to construction Value Stream Analysis(VSA) is analyzed into value-adding activity and non-value-adding activity on construction process through value analysis and Value Stream Mapping(VSM). In the results, non-value-adding activity generates waste such as the activity steps, labors, equipments, materials, time, and so on. Additionally, push-driven production is investigated making low productivity from the overproduction and so on. To resolve the problems in the process, The purpose of this paper eliminates waste factor through maximizing the value-adding activity generating value added and minimizing non-value adding activity. Particularly, it makes flow production and pull-driven production through minimizing work-in-process(WIP ).

  • PDF

A Study on the Necessity of Smart Factory Application in Electronic Components Assembly Process (전자부품 조립공정에서 스마트팩토리 적용 필요성에 대한 연구)

  • Kim, Tae-Jong;Lee, Dong-Yoon
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.9
    • /
    • pp.138-144
    • /
    • 2021
  • In the electronic component assembly business, when product defects occur, it is important to track incoming raw material defects or work defects, and it is important to improve suppliers or work sites according to the results. The core task of the smart factory is to build an integrated data hub to process storage, management, and analysis in real time, and to manage cluster processes, energy, environment, and safety. In order to improve reliability through accurate analysis and collection of production data by real-time monitoring of production site management for electronic parts-related small and medium-sized enterprises (SMEs), the establishment of a smart factory is essential. This paper was developed to be utilized in the construction by defining the system configuration method, smart factory-related technology and application cases, considering the characteristics of SMEs related to electronic components that want to introduce a smart factory.

Occupational Characteristics of Semiconductor Workers with Cancer and Rare Diseases Registered with a Workers' Compensation Program in Korea

  • Park, Dong-Uk;Choi, Sangjun;Lee, Seunghee;Koh, Dong-Hee;Kim, Hyoung-Ryoul;Lee, Kyong-Hui;Park, Jihoon
    • Safety and Health at Work
    • /
    • v.10 no.3
    • /
    • pp.347-354
    • /
    • 2019
  • Background: The aim of this study was to describe the types of diseases that developed in semiconductor workers who have registered with the Korea Workers' Compensation and Welfare Service (KWCWS) and to identify potential common occupational characteristics by the type of claimed disease. Methods: A total of 55 semiconductor workers with cancer or rare diseases who claimed to the KWCWS were compared based on their work characteristics and types of claimed diseases. Leukemia, non-Hodgkin lymphoma, and aplastic anemia were grouped into lymphohematopoietic (LHP) disorder. Results: Leukemia (n = 14) and breast cancer (n = 10) were the most common complaints, followed by brain cancer (n = 6), aplastic anemia (n = 6), and non-Hodgkin lymphoma (n = 4). LHP disorders (n = 24) accounted for 43%. Sixty percent (n = 33) of registered workers (n = 55) were found to have been employed before 2000. Seventy-six percent (n = 42) of registered workers and 79% (n = 19) among the registered workers with LHP (n = 24) were found to be diagnosed at a relatively young age, ${\leq}40years$. A total of 18 workers among the registered semiconductor workers were finally determined to deserve compensation for occupational disease by either the KWCWS (n = 10) or the administrative court (n = 8). Eleven fabrication workers who were compensated responded as having handled wafers smaller than eight inches in size. Eight among the 18 workers compensated (44 %) were found to have ever worked at etching operations. Conclusion: The distribution of cancer and rare diseases among registered semiconductor workers was closely related to the manufacturing era before 2005, ${\leq}8$ inches of wafer size handled, exposure to clean rooms of fabrication and chip assembly operations, and etching operations.

Status of Industrial Environments of Some Industries in Taegu Kyungpook Area (대구지방 산업장에 있어서 건강장애요인과 작업환경검사에 대한 기업인의 수용태도 (ll))

  • Kim, Du-Hui;Seong, Su-Won
    • 월간산업보건
    • /
    • s.8
    • /
    • pp.4-30
    • /
    • 1988
  • Examination of working environments was conducted to get more detailed data about harmful working environments and to make a contribution to more effective management. Study was carried out on 722 factories located in Taegu city and eight counties in Kyungpook Province, Korea, for a period of one year, from February 1 to December 30, 1986. The total number and proportion of workers exposed to harmful material was 37,697, 45.2% among 83,368 workers. The results according to exposed material were as follows: 1. In the case of noise, proportion of exceeding the 8-hour TLV was 59%, Included were nail-cutting in assembly metal manufacturing industry and weaving process in textile. 2. Dust in mill process of coal manufacturing industries exceeded the TLV of second class of dust at all parts and exceeded the TLV at 6% as a whole.: 3. The fields of industry lower than 70 lux of illumination were storage equipment of food, auto-winder of textile, painting of wood wares and coal mixing, and 44% of all cases was lower than standard. 4. As a result of temperature index investigation(WBGT), about 12% of all sujects exceeded limit value. Included parts were rolling machine and reducing room. 5. In the case of organic solvents, TLV was exceeded at about 8%, The parts exceeded TLV according to materials belonged to this category were as follows. 1) Toluene: adhesive work in assembly metal manufacturing 2) Xylene: printing and paint mixing in chemical manufacturing 3) Methyl ethytl ketone: paint mixing in all parts examined and coating machine partially in chemical manufacturing 4) Methyl isobutyl ketone: printing in chemical manufacturing 5) Acetone: vapor polishing in assembly metal manufacturing 6. Among specified chemical materials, the concentration of HC1 in the air in metal assembly manufacturing factory exceeded TLV. in one of three assembly metal manufacturing examined. Others, such as benzene, acetic acid, formic acid, sodium hydroxide, formalin, ammonia, copper, chromate etc. were lower than TLV in its indoor atmospheric concentration. As a whole, the proportion of exceeding TLV was about 0.8% 7. The concentrations of inorganic lead were lower than TLV in all parts examined. The results of this investigation show the fact that current management of working environments is not satisfactory, and so more active management is needed.

  • PDF