• 제목/요약/키워드: Asphalt Concrete Pavement

Search Result 311, Processing Time 0.022 seconds

Effect of Tire Contact Stresses on Tensile Strains in the Surface of Thin Asphalt Pavement (접지압력이 앎은 아스팔트포장 표층 인장 변형률에 미치는 영향 분석)

  • Park, Dae-Wook;Park, Joon-Kyu
    • International Journal of Highway Engineering
    • /
    • v.10 no.2
    • /
    • pp.47-55
    • /
    • 2008
  • In this paper, comparisons are presented on the predicted tensile strains which can affect the fatigue life of a thin asphalt concrete (AC) pavement near the surface of pavement from three-dimensional (3D) finite element (FE) using 3D measured tire contact stresses of a radial tire and a bias ply tire and a layered linear elastic program (BISAR). The objective was to analyze the stress distributions for a 11R22.5 radial tire and a $10{\times}20$ bias ply tire, and to compare the predicted tensile strains at the top and bottom of AC surface using different analysis methods. The results show that the stress distributions of two tires are similar but the 11R22.5 radial tire has much higher vertical contact stress than that of the $10{\times}20$ bias ply tire. The predicted tensile strains at the bottom of AC layer under the center of tire showed higher value by BM (BISAR with the measured contact area) method, which the measured tire contact area is used in a layered elastic program, while the tensile strain at the top of AC surface of 3.5cm offset distance from tire edge by 3D FE analysis showed the highest values among three analysis methods.

  • PDF

Modeling of Friction Characteristic Between Concrete Pavement Slab and Subbase (콘크리트 포장 슬래브와 보조기층 간 마찰특성 모형화)

  • Lim, Jin-Sun;Son, Suk-Chul;Liu, Ju-Ho;Jeong, Jin-Hoon
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.211-218
    • /
    • 2010
  • Volume of concrete slab changes by temperature and moisture effects. At that time, tensile stress develops because the slab volume change is restrained by friction resistance between the slab and subbase, and then crack occurs occasionally. Accordingly, researchers have made efforts to figure out the friction characteristics between the slab and subbase by performing push-off tests. Lately, researches to analyze concrete pavement behavior by the friction characteristics have been performed by finite element method. In this study, The friction characteristics between the slab and subbase were investigated based on the friction test results for lean concrete, aggregate, and asphalt subase widely used in Korean concrete pavements. The energy method bilinearizing relation between nonlinear friction resistance and displacement were suggested. The friction test was modeled by 3-D finite element program, ABAQUS, and the model was verified by comparing the analyzed results to the test results. The bilinear model developed by the energy method was validated by comparing analysis results obtained by using the nonlinear and bilinear friction resistance displacement relation as input data. A typical Korean concrete pavement was modeled by ABAQUS and EverFE and analyzed results were compared to evaluate applicability of the bilinear model.

The Thermal conductivity analysis on the pavement applying geothermal snow melting system (지열 융설시스템을 적용한 포장체에서의 열전도 분석)

  • Lee, Seok-Jin;Kim, Bong-Chan;Seo, Un-Jong;Lee, Seung-Ha;Lee, Joo-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.221-228
    • /
    • 2010
  • A sliding accident on the road have a high percentage by road freezing, especially, it is often appeared at bridges and Tunnel of freezing areas. Thus, the stability of road operations is enhanced by preventing a partial freezing phenomenon. According to the geothermal snow melting system analysis, a pattern of thermal conductivity is found out about pavement materials of concrete and asphalt when it is buried. The thermal conductivity study is essential that be applied the geothermal snow melting system according to heating exchanger pipe laying of lower pavements. The model tests are conducted on low temperature in freezer using the manufactured test model which is equal to pavement materials. And Many variables are discovered from numerical analyzes of the same conditions with model test.

  • PDF

Validation of Permanent Deformation Model for Flexible Pavement using Accelerated Pavement Testing (포장가속시험을 이용한 소성변형예측 모델의 검증)

  • Choi, Jeong Hoon;Seo, Youngguk;Suh, Young Chan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4D
    • /
    • pp.491-497
    • /
    • 2009
  • This paper presents the results of accelerated pavement tests (APT) that simulate permanent deformation (rutting) of asphalt concrete pavements under different temperatures and loading courses. Also, finite element (FE) analysis has been conducted to predict the test results. Test section for APT is the same as one of test sections at Korea Expressway Corporation test road and is subjected to a constant moving dual tire wheel load of APT at three different temperatures: 30, 40, $50^{\circ}C$. The moving wheel is applied at different loading courses within a 75cm wide wheel path to account for traffic wandering. Also, the effect of wandering on permanent deformation development is investigated numerically with three wandering schemes. In this study, ABAQUS is adopted to model APT pavement section with plain stain elements and creep strain rate model is used to take into account viscoplastic stain of asphalt concrete mixtures, and elastic layer properties are back-calculated from FWD measurements. Plus, the effect of boundary condition and subgrade on FE permanent deformation predictions is investigated. A full FE model that accounted for subgrade provided more realistic rut depth predictions, indicating subgrade has contributed to surface rutting.

Regularities for temperature variation in subgrade of highway

  • Teltayev, Bagdat B.;Suppes, Elena A.
    • Geomechanics and Engineering
    • /
    • v.13 no.5
    • /
    • pp.793-807
    • /
    • 2017
  • Regularities of temperature variation were determined in points of subgrade of the highway. Measurement of temperature was performed by special sensors, based on the effect of thermal resistance. Regular measurements of temperature were performed for two sections of the highway with asphalt concrete and cement concrete pavements for continuous period from November 2010 to March 2016. Multi-year experimental data, which we obtained, allowed establishing of peculiarities for temperature variation in points of subgrade in time and temperature distribution in the depth for annual cycle. Characteristics were determined for winter period-depth, duration and freezing rate, duration and defreezing rate for pavement and subgrade of the highway.

Field Application Evaluation of Black VES-LMC (흑색 VES-LMC의 현장적용성 평가)

  • Jung, Won-Kyong;Kil, Yong-Su;Kim, Yong-Bin;Yun, Kyong-Ku
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.177-183
    • /
    • 2011
  • VES-LMC(very-early strength latex modified concrete) has been widely used as repair material for bridge deck overlay or rehabilitation, because it could be opened to the traffic after 3 hours of curing. However, the bright color of VES-LMC disturb driver's sigh. A black VES-LMC, matching to asphalt concrete, was developed and applied at a filed for driver's comfort and safety. The black VES-LMC included 2% carbon black in cement weight ratio. A series of performance evaluation for black VES-LMC was done in terms of field applicability, pavement color and temperature change. The field applicability test result showed that there were no change of workability, slump and air void, and the compressive strengthen developed more than 20MPa after 4 hours of placement. The thermal stress of black VES-LMC was smaller than that of OPC and asphalt concrete, which means the stability of black VES-LMC. The performance evaluation result showed that the black VES-LMC could prevent road icing at below zero temperatures and promote thawing at melting temperature.

Study on the Functional Evaluation of Permeable Asphalt Concrete Pavement in Seoul City (서울시 배수성 아스팔트 포장의 기능적 평가 연구)

  • Lee, Sang-Yum;Kim, In-Tae;Mun, Sung-Ho;Kwon, Soo-Ahn
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.33-39
    • /
    • 2012
  • The functional evaluation of constructed permeable pavements was conducted in terms of water permeable performance and noise reduction measurements in Seoul city. The field measurements of noise was based on two methods such as pass-by and novel close proximity(NCPX). The pass-by test and NCPX method are related to noise propagation and tire/pavement interaction noise measurement, respectively. For the water permeable tests, five sections were chosen; furthermore, the measurements were conducted for both of wheel path and non-wheel path area. For the pass-by measurement, three sections were chosen; furthermore, two different locations, which were near measurement point to traffic noise and far measurement point inside park or hosing complex, were selected for each section. Finally, tire/pavement interaction noise measurements were carried out at four locations. The results show that the functional performance of water permeability and noise reduction was well remained within 2 or 3 years after permeable pavement construction.

Estimation for optimum crush depth to prevent reflection crack for Rubblized-PCC in PCC pavements (노후콘크리트포장 원위치 파쇄기층(Rubblized-PCC)의 반사균열 억제를 위한 적정 파쇄 깊이 산정)

  • Lee, Seung-Woo;Chon, Sang-Min
    • International Journal of Highway Engineering
    • /
    • v.6 no.4 s.22
    • /
    • pp.101-108
    • /
    • 2004
  • Asphalt overlay method is a general method to extend the of life old concrete pavements. However, reflection cracks are the typical problem of the AC overlay on distressed concrete pavement. Joint sealing, stress absorbtion layer have been used to prevent reflection cracks however partial success of to delay the timing of reflection cracking was recognized. Reflection crack problem can be eliminated by using rubblization method, which crush concrete pavement slab into piece of aggregate size that can be used base material. Previous research on rubblization method indicated that the size of rubblized PCC ranged 40-70mm at upper layer, and more than 100mm at lower layer. In this study, the adequate depth of rubblized PCC that ran prevent reflection cracking of AC overlay is estimated base on the simulation test of reflection cracking with 0, 10, 20cm rubblized PCC base.

  • PDF

Study About the Evaluation of Driving Stability Using 3-axis Accelerometer Test (3축 가속도 시험을 통한 도로 노면의 주행 안정성 평가에 대한 연구)

  • Lee, Dong-Hyun;Kim, Ji-Won;Mun, Sung-Ho;Jeong, Won-Seok
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.141-149
    • /
    • 2012
  • This paper attempts to evaluate driving stability by the vibration of human body. The purpose of this research is to establish an evaluation methodology for controling the quality of road surface. The study was conducted to investigate the relationship between road surface profiles (IRI, International Roughness Index) and the fatigue caused by the vibration of human body. Furthermore, 3-axis acceleration in driving vehicles was examined based on sampling sections under various road conditions. The acceleration value of frequency bands were analyzed by the characteristics of road surface, and realized the range of human influence by conditions and type of road surface with ISO-2631 standards. In general, more human fatigue by vehicle vibration was appeared in concrete pavements with high IRIs based on the analysis from given test data. Whereas, The SMA asphalt pavement and the diamond grinded concrete pavement reduce the human fatigue.

A Study on the Relation between IRI and PrI (평탄성 지수 IRI와 PrI의 상관관계에 관한 연구)

  • Kim, Kook-Han;Lee, Byung-Duck;Choi, Go-Il;Yang, Sung-Cheol
    • International Journal of Highway Engineering
    • /
    • v.5 no.1 s.15
    • /
    • pp.11-18
    • /
    • 2003
  • Road roughness, as the key factor influencing not only drivers' ride quality and safety but also pavement deterioration, is one of the most important pavement performance indicator to be evaluated by users' subjective assessment. For this reason, a specific number of the pavement roughness has been adopted to monitor the condition of a road for pavement management systems and to evaluate the quality of newly constructed sections, however, none of the unified methodology was internationally accepted. In Korea highway network, road roughness has been used mainly to evaluate newly placed pavement by using 7.6m CP (California Profile meter) to calculate PrI (Profile Index). But this instrument is manually operated to measure road profiles by traffic closure and their interpretation depends on personal bias. Therefore, problems arisen from the manually operated instrument will be overcome by using the APL (Longitudinal Profile Analyzer) which can be operated in the speed of 80km per hour. A study was conducted to correlate the relation from both concrete and asphalt pavement between IRI (measured by APL) and PrI (measured by 7.6m CP). Test results showed that there was a good correlation between IRI and PrI.

  • PDF