An architectural pre-design, which is conducted prior to the architecture design, supports fundamental configuration during the entire AEC project by predicting the cost, demand, etc., of the building, and is therefore gaining importance. In particular, the massing calculation of the pre-design phase should be prioritized, as it is fundamental to architectural outline. However, most architects depend on only their experience and intuition while conceptualizing an integrated framework of design conditions, including the building code and requirements for the massing calculation of the object. Therefore, many difficulties arise in terms of performing appropriate tasks. Thus, the purpose of this study is to implement a knowledge-based BIM for explicitly representing the design knowledge, which is the basis of decision making for an architect while performing the massing calculation. In particular, the 3D knowledge relevant to a project can be provided and accumulated in the massing calculation by the BIM system; this facilitates an integral understanding. Consequently, the approximate result of massing calculation in 3D BIM environment, through both the knowledge-based BIM template and plug-in, can be swiftly provided to the architect. In addition, the architect can invent various alternatives, estimate resulting costs, and reuse the accumulated knowledge in future BIM design processes.
To apply an analysis method of life cycle cost when assessing economics of equipment system, we should basically set up preconditions such as useful life, price escalation rate, interest rate, etc. as well as consider a calculation algorism of source energy and heat source system, which is a complex process for life cycle costing. For this reason, equipment designers tend to plan heat source systems, without a thorough investigation on economics of alternative systems at the pre-design phase. In this process, architectural designers should adopt a proper heat source system, which is one of the most important factors for planning an appropriate architectural design, through a discussion with equipment designers in a short time. In order to offer an evaluation method for equipment designers to analyze economics of an alternative heat source system easily at the pre-design phase, this research would define the simplified economics, evaluation method through analysis of existing papers for economics evaluation, and examine validity through comparison of simplified method values ($LCC_{EC}$) and life cycle costing values ($LCC_{15}$) for six alternative heat source systems.
합리성과 효율성을 끊임없이 요구받고 있는 현대사회의 시대적 흐름은 사회 전체의 패러다임이 되었다. 이 패러다임은 건축설계와 건설업계에도 큰 영향을 미치고 있다. 디지털 도구의 발전과 인터넷을 통한 정보기술(Information Technology)로 대변되는 현대 기술은 건축설계와 건설업계에서 파라메트릭 디자인(Parametric Design)과 BIM(Building information Modeling)이라는 두 개의 큰 흐름을 생성하고 발전하고 있다. 비록 각기 다른 이유로 탄생했으나 효율성과 합리성이라는 공통의 목적으로 서로의 경계를 넘나들면서 건축설계와 건설업계에 큰 영향력을 보이고 있다. 이러한 맥락에서 본 연구는 BIM 설계에 적용을 초기 기획설계단계에서의 파라메트릭 디자인이 어떻게 이루어져야 하는지에 대한 내용을 예시를 통해 구현해 보고자 했다. 해체주의(Deconstructivism) 건축가 "프랭크 게리"(Frank O. Ghery)의 작품인 월트디즈니 홀(Walt Diseny Consert Hall) 설계의 프로세스에 대한 고찰과 체코프라하의 네덜란덴 빌딩(National Nederlanden Building)의 형태를 파라메트릭 설계 툴(Tool)을 사용하여 기획설계단계에서의 형태를 구현하고자 했다. 향후 이 연구는 기획설계단계에서의 파라메트릭 디자인의 범위를 넘어서 궁극적인 BIM의 적용 즉 계획 및 실시설계 그리고 시공에 이르는 건설산업 전반에 적용 가능한 기초 자료로서의 목적에 사용되고자 한다. 향후 파라메트릭 디자인 알고리즘을 활용한 계획 및 실시설계단계에서의 BIM의 적용을 진행하고자 한다.
정부의 건설산업 혁신방안 중 기술혁신을 위한 주요과제의 하나인 시공책임형 CM 사업의 제도화를 위해 2017년부터 현재까지 시범사업이 활발하게 이루어지고 있지만, 시공이전단계 사업관리의 핵심인 GMP를 결정하는데 핵심도구인 설계VE와 관련한 기준 및 프로세스는 아직 정립되지 않은 실정이다. 이에 시공책임형 CM과 설계VE 관련 연구 및 운영실태, 그리고 사업참여자 인식조사를 통해 기존 설계VE 프로세스에 대한 문제점을 도출하고, 시공책임형 CM 사업에 적합한 설계VE 프로세스를 제안하고자 하였다. Schedule, Cycle, Process 등 3가지 측면에서 적용안을 제안하였으며 심층면접조사(FGI)를 통해 적절성과 적용성을 검증하였다. 본 연구의 결과는 향후 이루어질 발주기준 정립 및 법제화에 대한 기초자료로 활용될 수 있을 것으로 기대한다.
With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.
최근 국내에서는 BIM 적용을 의무화하는 프로젝트의 증가로 인하여 BIM 기술의 도입이 확대되고 있지만, 중소설계사무소에서는 관련 제도 미비, 인프라 구축비용, 상이한 프로세스 등과 같은 다양한 문제로 인해 BIM 확산이 저조한 실정이다. 본 연구에서는 이러한 문제 중에서 BIM 운영관리를 위해 필요한 인프라 구축 및 유지비용 절감 방안으로 타 산업에서 최근 적용이 모색되고 있는 클라우드 컴퓨팅 기술 중 하나인 VDI 시스템을 BIM 분야에 적용하기 위한 연구를 수행하였다. 연구 수행절차로는 중소설계사무소의 BIM 기반 환경에서 문제점을 분석하고 타 산업에서 VDI의 활용 요소가 BIM 환경의 저해요인을 해소 할 수 있는지 분석한 후, 건설 산업에 적합한 VDI 시스템 적용 방안을 모색하여 Server 규모산정 프로세스를 구축하였다. 이를 바탕으로 BIM 인프라 환경에 적용하여 자원관리의 효율성을 분석하여 BIM 환경에서 성공적인 VDI 도입에 일조 하고자 한다.
발주제도 혁신을 통한 국내 건설산업의 글로벌 경쟁력 강화를 목적으로 시작된 시공책임형 CM 사업이 공공부문에서 시범사업의 형태로 시행되고 있다. 그러나 정식 발주제도로 나아가기 위한 관련 법령 제정까지는 시간이 필요해 보이며, 사업에 대한 성과분석도 아직까지 미진한 상황이다. 이에 본 논문에서는 현재 시행되고 있는 4개의 시범사업의 사업이전단계사업관리(Pre-Construction Service)에 대한 성과분석을 통해 사업의 효과와 신뢰성을 검증하고자 하였다. Team Building, 설계도서 정합성, 공기검토, VE, BIM 활용 등 총 5개의 분야에 대해 성과분석을 진행했으며, 참여자 면담조사를 통해 문제점을 확인하고 그에 대한 개선안을 제시하였다. 본 연구의 결과는 향후 이루어질 발주제도 법제화에 대한 기초자료로 활용될 수 있을 것으로 기대한다.
About 30% of the total annual energy consumption on the earth is used in the architectural activities, including construction, maintenance management, and demonstration of a building. Also, 40% of the natural resource consumption, 50% of $CO_2$ emissions, and 20%~50% of industrial waste emissions are produced from a building. Unfortunately, the percentage of its energy consumption is staidly increasing year by year, about 8% every year, and it recently causes a sustainable architectural concept to come to the fore globally. Indeed, the importance of the sustainable architecture is increasingly becoming a worldwide trend. BIM(Building Information Modeling) is considered a new paradigm and a powerful method in building design, construction and maintenance. BIM has characteristics similar to a building's systems. All of the components in a model have a parametric relationship to each other. Understanding and capitalizing on these interrelationships typically takes numerous iterations that span multiple projects. Optimizing the integrated strategies and technologies for a high-performance, sustainable design requires a continual look at understanding how they work together to deliver the best potential. Throughout all of these concepts, we are going to be using a variety of tools that revolve around a BIM model. Some of the tools will require a heavier use of BIM than others, but all of them will utilize the model geometry you've created as part of your design. This study presents importance and validity of energy performance analyzation in the pre-design phase for the sustainable architecture with the support of Building Information Modeling (BIM) technology.
The 6th International Conference on Construction Engineering and Project Management
/
pp.392-395
/
2015
This study analyzes critical factors that affect issues of resolving time in BIM-based coordination using a case study. According to recent buildings that are meant to be more complex, BIM-based design coordination is regarded as an essential stage of the project delivery process. In the design coordination phase, a relocation of architectural, structural, mechanical, and electrical elements is conducted to avoid interference. In addition, the procedure of the development of each element in detail for the actual construction is carried out. Delays in coordination can affect delays in the entire delivery schedule of the project, and therefore many researches have focused on efficient coordination methods and how to shorten the period. In this study, we conducted a detailed analysis of the issue-resolving process using a case study, and found out that the participation of decision-makers for issue-resolving and the physical combination of trades affect delays in coordination time. In particular, we proposed the concept of organizational relation, indicating the level of decision-makers for issue-resolving, and the concept of physical relation, indicating the physical complexity of the issue, and we analyzed the effects of coordination delays.
This is part of a study on the origin of modernist forms and settings. Forms in Modern Architecture are totally new as though they seemed to be originated from some remote culture. Archaeological studies and Laugier's primitivist attitude to the classical architecture provided a way leading, in the end, to pure structures and abstract forms. An application of the classical elements was combined with the ultimate image of nobility, simplicity and rationality. What the seventeenth and eighteenth century theorists realized in the ruines of the classical structures were not the ones with their original organic vitality but the deteriorated, naked and abstracted ones. The essence of the classical structures has been the one of the main references of the modern white architecture. Ration and Nature were the quintessential terms in the design process of the Enlightenment architects of the late eighteenth and nineteenth centuries as they were in the twentieth century architecture. Pure geometric and symbolic forms were new inventions for the new revolutionary age after the development of architectural Styles, successive until Baroque and Roccoco, ceased to go on to the next phase. Many of their buildings appeared so modem in character, for they were omitted all but the essential structure and decoration. Other sides of rationality in the pre-modern age were evolved in terms of the paradigmatic research and the logic in structure. Durand developed a systematic typological approach to the forms. Geometry was the basis of his designs and his illustrations resembled endless simple geometrical problems. One of the other rational approaches was mainly developed by Viollet-le-Duc. To him, Gothic architecture was the model in which each members functioned actively and exerted counterpressure and the Middle Ages invented new fantastic forms. The several ways of rational approaches in architecture were led to the 'tabula rasa' planning in modern architecture. Nature was remained untouched and not deformed as Ledoux's houses in the $H{\hat{o}}tel$ de $Th{\acute{e}}lusson$ were setted on informal gardens. It is part of the modem image that Nature flows or interpenetrates through the white prisms of the strictest classical purity and machines.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.