• 제목/요약/키워드: Architectural Design Firms

검색결과 47건 처리시간 0.018초

BIM 프로세스 성숙도 측정 모델의 평가항목에 대한 연구 (A Study on the Evaluation Items of BIM Process Maturity Measurement Model)

  • 이재성;옥종호
    • 한국CDE학회논문집
    • /
    • 제21권3호
    • /
    • pp.281-295
    • /
    • 2016
  • Lately, the management of domestic BIM performance is quite lacking, as the evaluation and management data from successful cases of BIM implementation both on projects and in companies, and related effects (time, cost and other physical gains) are not well kept for future use in BIM development. In order to overcome the above obstacles, a systematic approach to evaluating BIM adoption with focus on particular elements like BIM implementation environment and processes, and the physical factors yielded by BIM, is necessary. In this study, objective and detailed assessment indicators and weights that are appropriate for the domestic situation were derived through research for purposes of developing a web-based BIM maturity measurement program that is tailor-made for the Korean construction atmosphere. Through a company's self-maturity measurement, excellent quality of BIM deliverables and output can be achieved and managed. Furthermore, the domestic BIM capacity can gradually increase since design firms' BIM capability can be judged during procurement basing on measurement indicators.

조경 설계 분야에서 파라메트릭 디자인의 사례 분석과 활용 가능성 (Case Analysis and Applicability Review of Parametric Design in Landscape Architectural Design)

  • 나성진
    • 한국조경학회지
    • /
    • 제49권2호
    • /
    • pp.1-16
    • /
    • 2021
  • 조경의 설계 행위는 설계가의 사고체계 내에서 형성되는 개념과 그것이 형상화되는 구체적인 재현 그리고 이를 실질적인 재료로 구축하는 일련의 과정으로 이루어지며, 이러한 디자인 프로세스는 4차 산업혁명 시대의 컴퓨터 기술과 IT 생태계의 비약적인 발전으로 많은 변화를 마주하고 있다. 컴퓨터 테크놀로지는 산업 초기에 수학적 계산(calculation)과 입력 데이터의 시각적 표현(graphic representation on display) 등 비교적 단순한 목적으로 개발되었다. 하지만 ibm과 매킨토시(macintosh)를 시작으로 개인용 컴퓨터(personal computer)의 성공적인 보급 이후 프로그램 언어와 하드웨어가 급속히 발전하고, 알고리즘(algorithm) 및 응용 소프트웨어가 전문화되면서 컴퓨터의 활용 목적이 사회 전반에 걸쳐 매우 다양해졌다. 본 연구는 이러한 디지털 사회 맥락의 변화를 바탕으로 컴퓨테이셔널 디자인(computational design), 파라메트릭 디자인(parametric design) 및 알고리즘 디자인(algorithm design) 등의 새로운 설계 방법들이 조경 설계 과정에서 어떠한 기능과 역할을 할 수 있는지에 관한 현황 및 쟁점을 진단하였으며, 그중 최근 가장 주목받는 파라메트릭 테크놀로지를 적극적으로 이용하는 디자인 방법론에 집중해 연구를 진행했다. 우선 현대 조경 및 건축 전반에서 파라메트릭 디자인의 주요 개념 및 특징들에 대해 살펴 논의의 근거를 마련했다. 그리고 이를 바탕으로 조경 분야에서 파라메트릭 디자인 활용에 관한 선행 연구를 분석하고, 조경 설계 회사들의 실제 활용 현황에 대해 분석했다. 그 결과, 조경 분야에서 파라메트릭 디자인 활용에 관한 연구는 연구의 수나 다양성 측면에서 타 분야와 비교했을 때 아직 충분한 논의가 진행되지 않은 것을 확인할 수 있었고, 사용 현황 분석에서는 최근 국외 조경 회사들을 중심으로 새로운 테크놀로지를 적극적으로 활용하려는 다양한 움직임이 조사되었다. 마지막으로 이러한 논의를 바탕으로 조경 설계 분야에서 파라메트릭 디자인 활용의 구체적인 사례 및 추후 다양한 가능성에 대해 검토했다.

국내 설계.감리 등 용역보증제도 현황 및 개선방안 연구 (A Study on the Improvement of Engineering and Construction Supervision Guarantee System in Korea)

  • 이용희;최재호
    • 한국건설관리학회논문집
    • /
    • 제12권3호
    • /
    • pp.53-61
    • /
    • 2011
  • 정부는 1990년대 대형건축물의 붕괴사고가 잇따르고 건축물의 사고로 인한 인적, 물적 손해에 대한 보전책이 불충분하다는 지적에 따라 '국가계약법'상에 일정규모 이상의 용역이나 건설공사에 대하여 의무보험에 가입하도록 하였다. 특히 2002년에 설계 및 감리 등의 기술용역 분야를 위한 보증제도가 도입된 후 여러 운영상의 문제점이 표출되고 있으나 이에 대한 구체적인 현황 분석 및 개선방안을 마련하기 위한 연구는 매우 미흡한 상황이다. 본 논문은 델파이 방법을 사용하여 기술용역 보증제도와 관련된 주요 제도 및 운영상의 문제점을 도출하고 이에 대해서 주요 보증시장 참가자인 발주청, 용역사, 보험사의 보험업무 실무담당자를 대상으로 설문조사를 실시하여 개선방안을 도출하였다. 주요 정책적 대안으로는 신용평가에 근간을 둔 보증한도의 조정, 비효율적인 연대보증인 제도의 폐지, 제3자 인적손해의 담보범위 포함과 보험가입금액의 상향, 보험 기간의 연장 및 기타 제도정비사항을 제시하였다. 제안된 개선방안들에 대한 이해당사자간에 공감대 형성은 국내 건설 산업계의 건전한 발전으로 이어질 것으로 기대해본다.

계층분석법을 이용한 녹색건축 인증제도 평가항목의 중요도 분석 -공동주택 인증기준을 중심으로- (Analyzing Weights of Certification Assessment Criteria on the G-SEED System Using the AHP Method -Focused on Certification Standards for Apartment Buildings-)

  • 최여진
    • KIEAE Journal
    • /
    • 제13권6호
    • /
    • pp.113-120
    • /
    • 2013
  • Many countries over the world have taken many discussions and endeavors on environmental improvements of energy savings and greenhouse gas emission reductions for solving global climate change problems. In Korea, pre-considerations of environment-conscious factors in buildings have been taken to be critical with new constructions and renovation markets. In this situation, the Korean Green Building Certification(KGBC) system to induce the diffusion of sustainable buildings was introduced in 2002 and developed as an improved version of the G-SEED(Green Standard for Energy and Environmental Design) system in 2013 after major revisions. This research examines the importance of assessment criteria on apartment buildings to certify green buildings using the AHP(Analytic Hierarchy Process) method and suggests a new direction on certification assessment standards from the AHP result. In order to apply the AHP method, the survey via e-mail was conducted to design staffs in domestic architectural firms. As a result, assessment criteria such as ecological environment, indoor environment, and energy & environment pollution among 7 main ones proved to be important on assessing the G-SEED system for apartment buildings, while criteria such as land use & transportation, material & resource, water circulation management, maintenance management did relatively unimportant.

비정형 건축물 공사의 생산성 분석 및 향상방안 - 노출콘크리트 공사를 중심으로 - (An Analysis and Improvement of Free Form Building's Construction Productivity - Focused on Exposed Concrete Work -)

  • 이은영;김예상
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.38-46
    • /
    • 2014
  • 2007년 독일의 건축 잡지 바우넷에서 선정한 세계 5대 설계사들의 2006 ~ 2010년 설계한 전체 설계 중 25%가 비정형 건축물로, 비정형 건축물은 도시, 국가의 랜드마크로서 그 사회적, 경제적 파급효과가 매우 크다. 국내 또한 인천세계도시축전 기념관, 킨텍스 제2전시관, 동대문디자인 플라자 등 비정형 건축물이 증가하고 있다. 그러나 이러한 설계 트렌드 및 증가하고 있는 비정형 건축물의 수요에 반해 이를 충족할 만한 비정형 건축 프로젝트의 설계 및 시공 관리 경험 부족으로 인해 비정형 프로젝트는 수익성을 기대하기 어렵고, 완공 후에도 많은 문제들이 부각되고 있다. 특히 국내 인력의 비정형 프로젝트 수행 경험부족으로 인해 불확실한 공사비 예측, 설계 과다변경 등으로 인해 완공 후에도 품질 문제를 비롯한 공사비 상승 관련 문제들이 계속 발생하고 있으며, 이와 같은 비정형 건축물의 특성을 고려하지 못한 초기 계획은 프로젝트 수행 시 실제와 그 차이가 커 프로젝트 관리 리스크로 작용하지만 아직 비정형 건축물 프로젝트 관련 실적자료나 사례분석 자료 구축은 미비로 인해 어려움을 겪고 있는 실정이다. 따라서 본 연구에서는 비정형 건축물 공사 중 생산성이 낮은 공종을 선정하여 작업 프로세스 분석 및 실제 현장 생산성 자료 분석을 통해 실질적인 생산성 자료 구축 및 비정형 건축물 공사 생산성 향상 방안을 제시하고자 한다.

토목설계 전문가 설문조사를 통한 BIM 활성화 방안 (Strategies to Revitalize BIM(Building Information Modeling) by the Survey Questionnaires from Design Experts in Field of Civil Engineering)

  • 서명배;주기범
    • 한국콘텐츠학회논문지
    • /
    • 제12권11호
    • /
    • pp.446-457
    • /
    • 2012
  • 최근 건설공사에 이슈가 되고 있는 건축정보모델링(BIM)은 건설경기 둔화와 수주물량 감소에 따라 위기위식이 팽배한 건설산업의 새로운 돌파구로 주목받고 있다. 이미 건축분야는 국내외적으로 BIM을 도입하기 위해 관련연구가 활발히 진행되고 있다. 하지만 토목공사의 경우 건축공사와 달리 작업체계가 비반복적, 수평적, 비정형적이며, 프로젝트 수행 범위가 넓어 발생하는 정보의 양도 방대하여 건설사나 설계사에서는 BIM 구축을 위한 초기 투자비용의 부담과 투자대비 효과에 대한 의문과 부담을 갖고 있다. 이에, 국내 토목분야에 BIM을 적용하기 위해 토목설계 전문가들을 대상으로 BIM 기술수준을 파악하고 과거대비 현재 토목분야의 BIM에 대한 인식변화 분석을 통해 토목분야 BIM 활성화 저해요인을 파악하고 이를 해결할 수 있는 방안을 제시하였다. 도출된 활성화 방안은 가이드 개발, 제도 개발, 납품성과 검증, 국제표준 상정 등 4가지 분야로 구성된다. 연구결과는 토목분야 BIM 적용을 위한 표준과 납품 성과품의 검수 및 검증체계 개발 연구과제의 연구방향 설정을 위한 기초자료로 활용될 수 있을 것이다.

국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가 (Evaluation of Capability for Practicing CM at Risk in Korea)

  • 류한국;이상원;최재현
    • 한국건설관리학회논문집
    • /
    • 제21권2호
    • /
    • pp.79-87
    • /
    • 2020
  • 국내 시공책임형 건설사업관리(CMAR) 시장은 2019년 12월 현재 국토교통부 주도하에 수행된 시범사업을 종료하고 본 사업으로 전환되는 시점에 있으며, 발주방식의 다각화와 건설기술의 고도화를 위해 지속적으로 성장할 것으로 예측된다. 본 연구는 건설사의 CMAR 수행을 위한 자가 역량평가 도구를 개발하여 역량 수준을 평가함으로써, 수행역량을 향상하기 위해 수행되었다. CMAR 시범사업에 참여한 기업을 대상으로 수행단계와 관리영역에 따라 표준 핵심역량과 요소 기술역량을 규정하여 평가한 결과, 설계전단계 및 계약구매단계의 사업관리일반 역량이 시공단계에 비해, 설계이전 단계의 품질관리 영역이 타 영역에 비해 낮게 평가되었다. 또한 GMP를 기초로 한 시공단계의 사업비 관리영역은 높은 중요도에 비해 역량수준이 낮게 평가되었으며, 요소기술 역량에 해당하는 의사조정, 수행절차 최적화, 목표가치 달성역량 등도 초기 기술 적용수준으로 평가되어, 지속적인 역량향상이 요구된다.