Comparison of Blast Fragmentation Efficiencies from Conventional Bench and Double Air Deck Charge Blast Methods in Limestone Mine (석회석 광산에서 기존 일반발파와 이중분상 Air Deck 발파공법의 비교연구)

  • Kang, Dae-Woo;Hur, Won-Ho;Yang, Kook-Jung;Park, Dong-Chul
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.13-31
    • /
    • 2011
  • Air deck charge blast methods have been applied to improve the fragmentation in open cut bench blastings for mining developments. However, during large scale bench blasting operations, there exist some problems such as boulder productions due to explosive charge concentration. Especially, in case of lime stone mining, when air deck method is applied, there has been unintentionally concentrated on charging because the inside holes are often broken by erosion and decomposition. In this study, compared with general blasting, air deck blasting has been focused in lime stone mining. In other to maximize its efficiency, inside hole was examined by endoscope in advance and deck charge using air tube was applied to the section in which concentration might be taken place. Blasting efficiency, fragmentation, charging reduction rate, and total working hours (from charging to blasting) were the main object for comparing, and as a result, air deck was more efficient then the general blasting in all aspects except total working hours.

A Study on the Design of PLHBM (선대구경 수평보링 발파공법(PLHBM)의 설계 연구)

  • Beak, Jong-Hyun;Beak, Sang-Hyun;Han, Dong-Hun;Won, Ah-Ram;Kim, Chang-Seop
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.66-76
    • /
    • 2012
  • Blasting technology aims to maximize digging efficiency as well as minimize vibration and noise. So, it is key point of blasting technology to raise blasting effect as much as possible and reduce vibration and noise and the design of PLHBM that is the tunnel blasting method having such merit was studied in this paper. PLHBM has the excellent blasting efficiency as it drills the empty hole with high caliber of 250~1,000mm at centre cut, contributes to blasting vibration reduction effect much and can be usefully applied to tunnel blasting sites. So it is judged that it enables the development of tunnel blasting method to be advanced one more step by studying and suggesting the design method of PLHBM.

Basic Study for Theoretical Design of Rock Blots at Seong Ju Tunnel (성주 터널에 사용될 Rock Bolt의 이론적인 설계 기준에 관하여)

  • 강선덕
    • Explosives and Blasting
    • /
    • v.16 no.2
    • /
    • pp.23-33
    • /
    • 1998
  • This study has been carried out to design the standards of rock bolts which are recommended to be used for supporting material in Seong Ju tunnel, Under recently planned to construct. Due to the weak bedding rocks along the Tunnel, NATM supporting method is assumed to be applied and the design and calculation for rock bolts which are important material for this supporting method. Though the study, the results obtained are as follows. 1) The rocks defined s coarse sandstone, fine sandstone, medium sandstone, sandy shale and silty shale are normal rocks in strength, and black shale, greywacke and conglomerate are weak rocks in strength. 2) When the length of 3∼4meters of rock bolts are used, the distances of bolts are supposed to be 1.3∼1.8m in sandstone and 1.3∼2.0m in shale and for greywacke the distance should be 1.5m.

  • PDF

The Development of Soundproof System for the Blasting Noise Reduction in Tunnels (터널 발파소음 감쇠를 위한 방음시스템 개발)

  • 노상림;김욱영;조영천;이상필;유지영
    • Explosives and Blasting
    • /
    • v.22 no.1
    • /
    • pp.67-74
    • /
    • 2004
  • Blasting in urban area has become a serious issue in our living because it causes inconvenience to the resident living by construction area. Therefore, the practical solution and the better method for reducing blasting noise are highly required. However, finding practical solutions for the blasting noise is very difficult due to the lack of basic data and insufficient existing research. In order to overcome the limitation of existing sound barrier, we applied a new material to multi-layer soundproof system in the construction site, Kuksabong Tunnel in Yang Nyung-Ro. The statistical method was used to analyze blasting noise data. Through all these processes, it was verified that the soundproof system in this study was very effective method to decrease blasting noise.

A Study On a Method of Improvement From Domestic NATM Case (NATM 시공 사고 사례에 의한 개선방안 연구)

  • 이상웅
    • Explosives and Blasting
    • /
    • v.13 no.3
    • /
    • pp.19-30
    • /
    • 1995
  • NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly, we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data. Poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for setting technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites having occured accidents is badly geological survey, nonconfirmationi of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are Summarised as follows : 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre0boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel . 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring management, should be posted at field.

  • PDF

Consideration for Solution of a Difficult Problem and Application of CM.VM in Blasting Excavation for Korea-China and Korea-Japan Sea Bottom Tunnel (한중.한일 해저터널 발파굴착의 난제해결과 CM.VM 적용에 대한 고찰)

  • Shin, Chang-Yong;Ahn, Myung-Seog;Park, Ho-Kyung
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.71-75
    • /
    • 2010
  • A plan of construction of subsea tunnels connecting Korea-Japan and Korea-China have been discussing over the past several ten years. This paper were wrote about the present capacity of our engineer, the cooperation plan of politics and economy. Especially we examined and studied resolution method and technical problem in the construction of Sub-sea tunnel. In terms of excavation technology, Blasting and water resistance technology should be cared considering the status of rock such as fault in the deep sea. After of a construction work, it should be carefully designed and constructed for the fire and leakage management in Tunnel, It should be applied to High Construction Management Professional and Value Management(CVS) etc.

Application of Rock Splitter to Rock Excavation in an Open pit (노천현장 암 파쇄 굴착에 따른 할암공법의 적용성 고찰)

  • Won, Yeon-Ho;Kang, Choo-Won
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.63-70
    • /
    • 2010
  • This study is investigated the extent of the noise and ground vibration in an adjacent zone of a cattle pen and an antiquated housing structures for judgement of the spot applicability on the extents of the noise and ground vibration of the rock-splitting method by an oil pressure. It is studied by measuring and analysing in an adjacent position the extents of the noise and ground vibration according to the work process of the rock-splitting method, such as drilling, rock-splitting, arranging rock, loading and by being compared with the permitted level on the noise and ground vibration fixed at the spot. To the results, it is identified that the influence to the noise has to be considered, even if the rock-splitting method is applied as an excavation method to lower a ground vibration by the classification on blasting method of the ministry of land, transport and marine affairs.

Application of TSP Suvey to Predict the Ground Conditions Ahead of Tunnel Face (터널막장 전방 파악을 위한 TSP(Tunnel Seismic Prediction) 탐사 사례 연구)

  • Cho, Sung-Won;Lee, Hyo;Yoo, Jae-Won;Kim, Do-Hun Dave;Nam, Seung-Hyeok
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.40-49
    • /
    • 2013
  • To predict ground conditions ahead of the tunnel face, seismic refraction survey has been widely used. But due to the development in seismic equipment and techniques, tomography using borehole and others are actively applied in recent years. This study has a purpose to prevent stability problems during excavation and construction of tunnels by predicting unfavorable ground conditions such as fault, fractured zone and rock quality variation zone ahead of the tunnel face using TSP survey equipment. In this study, the validity of predicting ground conditions ahead of tunnel face by TSP survey has been evaluated through the case study in the road construction site.

Effects of Blasting Vibrations on Strength and Physical Properties of Curing Concrete (발파진동의 크기가 양생콘크리트의 강도와 물성에 미치는 영향)

  • 박근순
    • Explosives and Blasting
    • /
    • v.16 no.4
    • /
    • pp.18-28
    • /
    • 1998
  • Effects of blasting vibrations on curing concrete have not been well studied. As a result, unreasonable and strong blasting vibration constraints have been placed on blasting when it occur in the vicinity of curing concrete. To study the effects of blasting on curing concrete blocks of $33.3{\times}27.7{\times}16.2cm$ were molded and placed on the quarry. Several sets of concrete blocks were subjected separately to peak vibrations of 0.25, 0.5, 1.0, 5.0 and 10cm/sec. The impulses of blasting vibrations were applied with thirty-minute intervals. Along with unvibrated concrete blocks, the vibrated concrete samples cored with 60.3mm in diameter were measured for elastic moduli, sonic velocity and uniaxial compressive strength. Test results can be summarized as follows; 1. The blasting vibrations between 6 and 8 hours after pour generally lowered on the uniaxial compressive strength of the concrete. 2. A low blasting vibration of 0.25cm/sec did not affect the uniaxial compressive strength. As the magnitude of the blasting vibration increases, compressive strength of concrete is decreased. 3. Physical properties of the P-wave velocity, Young’s modulus, and Poisson's ratio showed a weakly decreasing trend in the concrete blocks vibrated between 6 and 8 hours after pour.

  • PDF

Analysis of Ground Behavior applied to the Design of Underground Opening Structures (지하공동구조물의 설계시 적용되는 지반거동해석)

  • 박남서;이성민
    • Explosives and Blasting
    • /
    • v.15 no.1
    • /
    • pp.44-60
    • /
    • 1997
  • The design of underground cavern is basically governed by the mechanical properties of ground mass distributed around excavation. It is seldom possible to consider all the factors of ground mass properties in the evaluation of ground mass behavior as well as to classify those factors to a simple category. Until computer sciences have developed to calculate complex and laborious mechanical simulation of underground openings, ground behavior was quantitatively and qualitatively evaluated using empirical classification system. In this paper, analysis methods of ground behavior for underground cavern using the prediction of loosening zone, empirical method derived from rock mass classification and element stress analysis are described with chronological sequence.