• Title/Summary/Keyword: Application schedule

Search Result 398, Processing Time 0.023 seconds

Development of a Smart Application for Protecting Dementia Patients (치매환자의 보호를 위한 스마트 앱 개발)

  • Hwang, Hyun Suk;Ko, Yun Seong;Ban, Ga Un;Kim, Chang Soo
    • Journal of Korea Multimedia Society
    • /
    • v.16 no.9
    • /
    • pp.1089-1097
    • /
    • 2013
  • The applications for considering their position and daily patterns of dementia patients have been developed in an early stage even if the older patients who have weaker or serious symptoms has increased in various forms. In this paper, we develop an android-based application which displays positions and pathways of patients on maps and provide messages in the cases of dangerous situations. Guardians need to register schedules including safe areas and personal information of their patients. This system registers behavior status categorized as normal or abnormal each position which is sent to a database. In particular, the deviation status is assigned in case the patients are not within the safe areas that their guardians registered on their schedule. The wandering status is assigned in case the patients are repeatedly passed by their pathways. This smart application contains the modules such as patient position sending, guardian and patient information, patient schedule and safe zone registration, position and behavior status registration, pathway display and message sending, and rescue request. This system sends the notification and alarm service providing normal and abnormal behavior with deviation and wandering status of patients respectively.

A Study on the status and improvement of construction management in Susung Culture & Art Center (수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Park, Byung-Hak;Yoo, Byung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.45-52
    • /
    • 2006
  • Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

  • PDF

EVMS Application Process based on Project Management Processes (Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스)

  • Baek Sung-Min;Ahn Byung-Ju;Kim Jae-Jun;Kong Gun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System) came to the proper method for integrated cost-schedule control and Government announced EVMS application plan. After that, many studies related adaptability, activation, model, and process reflecting the characteristics of the domestic construction industry are proceeded in construction sites and schools. This thesis is a study of EVMS process. The purpose of this paper is to analyze the problems of previous researches for EVMS Process and to suggest the EVMS application Process based on Project Management Processes of PMBOK. In this kind of view, this thesis suggests the new direction to study EVMS process. And furthermore, this process is suggested for showing a framework of EVMS in Korean construction project are identified.

A Case Study of SE and EVMS Techniques Application on Surion Helicopter R&D Program (수리온헬기 개발사업에서 시스템 엔지니어링 및 사업성과관리 기법 적용 사례연구)

  • Byun, Hyung Kyun;Lee, Sang Woo
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.51-62
    • /
    • 2012
  • The System Engineering(SE) and the Earned Value Management System(EVMS), as parts of the scientific project management methodology, have been applied to Surion Helicopter R&D Program. The concept and application process of SE methodology, requirements management and applications output by DOORS program are described in this study. The concept and application process of EVMS, analysis results of schedule/cost variance for Surion RF equipment are also discussed in this study. Though the Surion R&D program is still on-going, it is found that the measures of effectiveness of SE and EVMS applications are verified.

Automatic Alignment System for Group Schedule of Event-based Real-time Response Web Processing using Node.js

  • Kim, Hee-Wan
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.11 no.1
    • /
    • pp.26-33
    • /
    • 2018
  • A web application running on the Internet is causing many difficulties for a program developer, and it requires to process multiple sessions at the same time due to the occurrence of excessive traffic. Web applications should be able to process concurrent requests efficiently and in real time. Node.js is a single-threaded server-side JavaScript environment implemented in C and C ++ as one of the latest frameworks to implement event models across the entire stack. Nodes implement JavaScript quickly and robust to achieve the best performance using a JavaScript V8 engine developed by Google. In this paper, it will be explained the operation principle of Node.js, which is a lightweight real-time web server that can be implemented in JavaScript for real-time responsive web applications. In addition, this application was practically implemented through automatic alignment system for group scheduling to demonstrate event-based real-time response web processing.

A Fundamental Study on the Float Application of Construction Schedule Management (건설 프로젝트 공정관리에 있어서 Float 활용에 대한 기초연구)

  • 이상범;진유나;송진우;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.133-137
    • /
    • 2003
  • Float has been just recognized spare time for disposing of unexpected conditions as by-product of CPM(critical-path-method) calculations, in spite of important method for construction period, taking in material, human supply and cost reducation in construction process management. Also float necessary follow method of contract by ownership problem and effect construct management of use. The purpose of this study was to examine current recognition and application grade of float in construction project. In addition, the study proposes improvement strategies of float application for efficient progress plan and control.

  • PDF

Formulation and optimization of cubic polynomial joint trajectories for industrial robots (산업용 로보트를 위한 3차 다항식 조인트궤적의 구성과 최적화)

  • 김태산;배준경;박종국
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10a
    • /
    • pp.92-97
    • /
    • 1988
  • The path planning is done at the joint level. Cubic spline functions are used for constructing joint trajectories for industrial robots. For N-joint robot, Cartesian knots are transformed into N sets of joint displacements, with one set for each joint. For industrial application the speed of operation affects the productivity. An algorithm is developed to schedule the time intervals between each pair of adjacent knots such that the total traveling time is minimized subject to the physical constraints on joint velocties acceleration and jerks.

  • PDF

A Scheduling Technique for Pipelined Datapath Synthesis (파이프라인형 데이타패스 합성을 위한 스케쥴링 기법)

  • 이근만;임인칠
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.29A no.4
    • /
    • pp.74-82
    • /
    • 1992
  • This paper deals with the scheduling problems, which are the most important subtask in High-level Synthesis. ILP(integer linear programming) formulations are used as a scheduling problem approach.For practical application to digital system design, we have concentrated our attentions on pipelined datapath scheduling. For experiment results, we choose the 5-th order digital wave filter as a benchmark and do the schedule. Finally, we can obtain better and near-optimal scheduling results.

  • PDF

Application of Genetic Algorithms to a Job Scheduling Problem (작업 일정계획문제 해결을 위한 유전알고리듬의 응용)

  • ;;Lee, Chae Y.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.3
    • /
    • pp.1-12
    • /
    • 1992
  • Parallel Genetic Algorithms (GAs) are developed to solve a single machine n-job scheduling problem which is to minimize the sum of absolute deviations of completion times from a common due date. (0, 1) binary scheme is employed to represent the n-job schedule. Two selection methods, best individual selection and simple selection are examined. The effect of crossover operator, due date adjustment mutation and due date adjustment reordering are discussed. The performance of the parallel genetic algorithm is illustrated with some example problems.

  • PDF

Reports on the Meetings of ISO/TC108 Mechanical Vibration and Shock and ISO/TC108/SC3 Use and Calibration of Shock Measuring Instruments Tokyo, Nov. 4-8, 2002

  • Kim, Kwang-Joon
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.468-474
    • /
    • 2003
  • 1. Schedule for the meetings of ISO/TC108 Mechanical vibration and shock and ISO/TC108/SC3 Use and calibration of shock measuring instruments 2. Minutes for the seventh meeting of ISO/TC108/WG23 Mechanical vibration and shock - Resilient mounting systems - Information for the application of source and receiver isolation (omitted)

  • PDF