• Title/Summary/Keyword: Application schedule

Search Result 398, Processing Time 0.023 seconds

Effect of Retaining Preconsruction Primer (PCP) on the Quality of High Performance Protective Coatings Systems

  • Chung, M.K.;Baek, K.K.;Lee, H.I.;Lee, C.H.;Shin, C.S.
    • Corrosion Science and Technology
    • /
    • v.3 no.2
    • /
    • pp.59-66
    • /
    • 2004
  • In construction of new ships and large steel bridges in Korea, pre-construction primers (PCP), also known as shop primer, are routinely used and retained as an integral part of the protective coating system. Retention of PCP's can significantly reduce building schedule and cost. Retaining PCP through the so-called "sweep blasting" procedure eliminates or minimizes the necessity of a second blast operation, thus shortening overall schedule as well as reducing labor cost and hazardous waste disposal cost. This study evaluates the feasibility of retaining PCP as the part of primer for high performance protective coating systems applied to ships' hull, bottom and ballast tanks. Upon proving that the retention of the PCP is a viable option, the process of coating application can he improved significantly in terms of cost and working schedule of new ships and large steel bridges. Results indicate that use of the PCP via sweeping blasting in conjunction with standard high performance protective coating systems does not degrade the overall performance of the coating systems. At the same time, it is also highly recommended that the secondary surface preparation should consist of grit blasting of weld burnt and other damaged areas to SSPC SP-IO grade (Sa 2.5 Gr.), Near White Blast Cleaning with proper application and attention to detail.

An Efficient List Scheduling Algorithm in Distributed Heterogeneous Computing System (분산 이기종 컴퓨팅 시스템에서 효율적인 리스트 스케줄링 알고리즘)

  • Yoon, Wan-Oh;Yoon, Jung-Hee;Lee, Chang-Ho;Gim, Hyo-Gi;Choi, Sang-Bang
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.46 no.3
    • /
    • pp.86-95
    • /
    • 2009
  • Efficient DAG scheduling is critical for achieving high performance in heterogeneous computing environments. Finding an optimal solution to the problem of scheduling an application modeled by a directed acyclic graph(DAG) onto a set of heterogeneous machines is known to be an NP-complete problem. In this paper we propose a new list scheduling algorithm, called the Heterogeneous Rank-Path Scheduling(HRPS) algorithm, to exploit all of a program's available parallelism in distributed heterogeneous computing system. The primary goal of HRPS is to minimize the schedule length of applications. The performance of the algorithm has been observed by its application to some practical DAGs, and by comparing it with other existing scheduling algorithm such as CPOP, HCPT and FLB in term of the schedule length. The comparison studies show that HRPS significantly outperform CPOP, HCPT and FLB in schedule length.

Control Effect of Environmental-friendly Organic Materials against Major Pear Diseases (친환경 유기농자재를 이용한 배 주요병해 방제효과)

  • Yoon, Deok-Hoon;Patk, Hae-Jun;Nam, Ki-Woong
    • The Korean Journal of Pesticide Science
    • /
    • v.14 no.4
    • /
    • pp.401-406
    • /
    • 2010
  • This study was conducted to investigate the control effects of the environmental-friendly materials against major diseases of pear and to elucidate factors related to spore disperse of pear scab and pear rust. Spore disperse was deeply related ambient temperature in the early stage of disease occurrence and the maximum spore disperse was affected greatly by the air humidity, Percent of infected leaves of pear scab in plot treated with Trichoderma harzianum-YC459 was 29.3% and 43.3% in plot treated with Sulfur-80%. Two formulations above-mentioned were less effective to control pear scab than the chemical pesticide, hexaconazole. Control effect in plots single- and mixed-treated with Trichoderma harzianum-YC459, Sulfur-80% and hexaconazole against pear scab were compared with that in plot treated with chemicals by conventional application schedule in pear orchard. The incidence of pear scab was lower in plot treated with the environmental-friendly materials than that of untreated plot. However there was no significant difference among the treatments at the 5% level. Application of Sulfur-80% reduced significantly the incidence of pear scab (7.8%) compared to that (10.3%) in plot treated by conventional application schedule in organically cultivated pear orchard. Alternative application of Trichoderma harzianum-YC459 and Sulfur-80% (4.3%) suppressed the incidence of pear rust than that (7.1%) in plot treated by conventional application schedule in organically cultivated pear orchard.

A Study on the Comparison and Application of the Methods of Measuring Projects'Progress (프로젝트 진도 측정 방법의 비교와 적용에 관한 연구)

  • Min, Taek-Kee;Song, Chang Yong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.3
    • /
    • pp.87-94
    • /
    • 2013
  • The progress that becomes a basis for measuring the outcome of project is a core of project control. Follow-up corrective actions are determined depending on the degree of their differences. The methods of measuring the project progress have been developed though a variety of research and many were verified through the cases. Among such methods, this study selected Start/Finish method and Fixed Formula method. In order to check the limitations of the progress utilized in the two methods, the study compared their progresses to the progress of Percentage Complete method and analyzed the differences shown in their actual applications. Through this, it suggested the forms and scale of the projects appropriate to the application of Fixed Formula method. As for the research progress method, the study first generated a number of virtual project schedules for the establishment of an analysis model. These project schedules were varied in a way that they had different project periods and the number of different activities. The study also generated numerous project schedules for difference test. After establishing a virtual schedule plan by the scale of projects, it measured their progresses by period, analyzed the differences and repeated this procedure to obtain the results.

A Study on Schedule Management in Construction Projects by CCPM (CCPM을 이용한 건설사업 일정관리에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.84-92
    • /
    • 2004
  • Construction work varies with the project types. However, the success of all project types depends upon three conditions i.e. schedule, quality and cost. If these three conditions are fulfilled, then project said to be successful. In this paper, scheduling of a construction Project has been dealt with the application of CCPM method. CCPM has been introduced as a new theory in construction industry in 1997 at the United States, but its application is still insufficient in domestic field due to the absence of systematic study, A simulation has been conducted in a Bridge construction project to validate the possibility of CCPM in order to complement PERT/CPM in construction field. The result of study shows that the CCPM could be effective to reduce the project time duration than existing PERT/CPM technique.

A Hierarchical Solution Approach for Occupational Health and Safety Inspectors' Task Assignment Problem

  • Arikan, Feyzan;Sozen, Songul K.
    • Safety and Health at Work
    • /
    • v.12 no.2
    • /
    • pp.154-166
    • /
    • 2021
  • Background: Occupational health and safety (OHS) is a significant interest of all governments to prevent workplace hazards. Although appropriate legislation and regulations are essentials for the protection of workers, they are solely not enough. Application of them in practice should be secured by an efficient inspection system. Fundamental components of an inspection system are inspectors and their audit tasks. Maintaining the fair balanced task assignment among inspectors strictly enhances the efficiency of the overall system. Methods: This study proposes a two-phased goal programming approach for OHS inspectors' task assignments and presents a case study. Results: The solution approach gives the balanced assignment of inspectors to the workplaces in different cities of the country in the planning period. The obtained schedule takes into account the distances covered by the work places and the number of the workplaces' employees to be audited and pays attention to the human factors by considering the preferences of the inspectors. The comparisons between the obtained optimal schedule and the implemented one that is produced manually show that the approach not only maintains the technical requirements of the problem, but also provides social and physical balance to the task assignment. Conclusion: Both the approach and the application study are expected to offer fruitful inspirations in the area of safety management and policy and they provide a good guide for social policy and organizational aspects in the field of OHS inspectors' task assignment.

SNS Integrated Management API and Its Application (SNS 통합관리 API와 응용)

  • Jin, Jae-Hwan;Park, Jong-Moon;Lee, Myung-Joon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.16 no.3
    • /
    • pp.499-510
    • /
    • 2012
  • An SNS(Social Network Service) is an online service that supports an effective way to share information over virtual communities. Recently, as SNSs such as Twitter, Facebook, and Me2day are getting bigger, the purposes of using popular SNSs are expanded to broadcastings, politics, marketings and so on. In this paper, we propose an API to integrate and manage open APIs for various SNSs, presenting a library as an implementation of the proposed API. Also, utilizing the developed library, a smartphone application is provided which supports integrated management of popular SNSs and personal schedules. Using the library, developers can reduce costs when they need to implement specific functions for managing various SNSs. With the developed application, we can read and write to/from the related SNSs on same screen, automatically reminding our schedule and sharing the schedule with friends over the SNSs.

A Conceptual Framework to Study the Effectiveness of Interface Management in Construction Projects

  • KEERTHANAA, K.;SHANMUGAPRIYA, S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.3
    • /
    • pp.1-21
    • /
    • 2019
  • The management of mega construction projects which incorporate a large number of stakeholders, technologies, data, work culture etc., is cumbersome. The experts in the construction arena advocate that interface management serves as a precise tool in resolving these conflict points due to the intricate nature of the construction projects. Interface management is a current trending management practice in the construction industry which is also a beneficiary to mega/fast track projects in enhancing the project performance. The main objective of this study is to validate a model for assessing the relationships among interface management, IT applications, project performance & project benefits. The mediating effect of interface management in relationship between project performance & interfacial factors was also investigated. The research model was validated using PLS-SEM (Partial Least Square-Structural Equation Modelling) approach. Data were collected from clients, contractors, consultants in large scale projects through questionnaire survey and smart-PLS software was used to analyse the conceptual model. The research model comprises eleven hypothesis and the significance of these hypothesis were tested using T- statistics values. The research implies that people/participants factor is greatly influenced by interface management with the path coefficient of 0.608 and also enhancement of project's schedule performance due to the interface management is strongly appealing (Path coefficient = 0.711). The results also reveal IT application is significantly associated with interface management practice (Path coefficient =0.723) and also the effect of IT application on project performance (schedule, cost, quality & safety) is successfully mediated through interface management practice. The practical application of this validated model was done through case study. The case study aims at measuring the impact of interface management on interfacial factors and role of interface management in improving the project performance in the construction organisations.

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

An Integrated Construction Management System Based on the Earned Value Concept (EV개념에 의한 통합건설공사관리시스템)

  • Chung Chul-Won;Lee Jeom-Su;Oh Kyu-Whan;Chang Jin-Sik;Lee Yu-Seop;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.155-162
    • /
    • 2001
  • Recently, in Korea, a few construction companies have been tried to develop a management system, which is able to integrate schedule and cost. In spite of these attempts, however, advanced management techniques can be hardly applied under the BoQ based management system. In order to improve these problems, many studies have been peformed, but yet could not overcome practical limitations. Besides, the application of historical data is below the level since it is so difficult to accumulate and feed-back historical data under the unique character of construction industry. Consequently, lots of time and effort have being wasted to establish control criteria. The newly generated Information is not systematically managed as well. Therefore, this study suggests Integrated Construction Management System complemented the existing practical problems.

  • PDF