• Title/Summary/Keyword: Application schedule

Search Result 398, Processing Time 0.025 seconds

Design and Implementation of a Project Work Unit-based Scheduling Application (프로젝트 작업 단위 기반 일정 관리 애플리케이션의 설계 및 구현)

  • Bomin Kim;Minyoung Kim
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.6
    • /
    • pp.1173-1178
    • /
    • 2023
  • In modern society, there is a tendency to emphasize efficiency and lead to detailed planning of team projects and individual tasks within organizations. In a 24-hour routine, the ability to use time effectively is considered an indicator of conscientiousness, and people try to imitate planned and organized people and utilize various systems to manage their daily lives. The reason why you want to perform a given task efficiently is because it affects the success or failure of the project by completing the task within a set period of time. Neglecting the project schedule is considered a major risk that threatens a successful outcome. This applies not only to large-scale organizational projects but also to individual life, and utilizes a variety of schedule management tools that emphasize time-based efficient management. In project management, it is necessary to carefully understand the detailed work progress rather than simply based on Today. In this paper, we propose an Android application that can manage schedules by accessing the user's project in units of tasks rather than dates, and introduce its implementation. The application we implemented in this paper can manage the project's goals and schedule by registering the project to which the user belongs. In addition, it provides the ability to approach work efficiently by visualizing the progress of the entire project or individual goals. As a result, users can use the application we propose in this paper to focus on their projects and manage schedules by task, thereby improving the overall efficiency of the project.

A Study on the Application of Resource Leveling Heuristic for Ship Erection Scheduling (부하평준화 휴리스틱을 이용한 선박 탑재 일정계획 편성 연구)

  • Baek, Tae-Hyun;Chung, Kuy-Hoon;Park, Ju-Chull
    • IE interfaces
    • /
    • v.12 no.3
    • /
    • pp.354-361
    • /
    • 1999
  • In this paper, resource leveling heuristics are developed for ship erection scheduling. The heuristics, which enable scheduling with limited resources, are composed of the gradual resource limit decrease anti the resource allocation. At first, earliest start(ES) schedule is derived by PERT to get initial resource limit. And then, the heuristics lower the resource limits by a given increment and derive a new schedule from day-by-day resource allocation procedure. The procedure is repeated until the project duration reaches at the given ship erection duration, called dock cycle. Through the application of the heuristics for real world ship erection projects, wc can observe significant improvement in resource leveling.

  • PDF

Improved Link System of Schedule and 3D Object for VR-base Construction Project (가상건설기반의 건설공사 일정 및 3D객체 연동시스템의 개선된 구축방안)

  • Kwon, Jung-Hui;Moon, Hyoun-Seok;Park, Seo-Young;Gi, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.289-294
    • /
    • 2007
  • Virtual reality (VR) technology for construction project includes 3D CAD application and 4D CAD system for visualizing construction schedule data. 3D CAD application is more important in the design phase and 4D CAD system is effective tool in the construction phase. This study suggests a methodology to develop VR functions that can be used for project life cycle. The results of this study includes composition algorithms to make VR systems such as bird's eye view system, VR drawings system, VR telepresence system and VR risk management system. Those methodologies can be used for integrated VR system with nD CAD object.

  • PDF

An Improvement Study on National Fire Safety Code of Sprinkler System for Hydraulic Calculation Application (수리계산 적용을 위한 스프링클러설비의 화재안전기준 개선방안 연구)

  • Lee, Keun-Oh;Kang, Joo-Hyeong
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.1 s.79
    • /
    • pp.7-12
    • /
    • 2007
  • There are two kinds of design process for sprinkler system. one is pipe schedule system and the other is hydraulically designed system. We have inefficient results when we design by hydraulically designed system because the design process for sprinkler system is restricted by domestic fire code. Therefore, it is essential to do an introduction of hydraulically designed system which is based on engineering for enhancing reliability and efficiency of sprinkler system. This study presents points at issue by comparing and studying design standards of sprinkler system from Korea, Japan and NFPA, and presents improvement plans of national fire safety code of sprinkler system by processing, comparing and analyzing designs according to piping schedule and hydraulically designed system about domestic objects. Installation standards of sprinkler system have to be applied not by object buildings but by hazard classification. It is hard to design an efficient sprinkler system for fire control when water supply requirement of sprinkler systems allocated according to a size of a building because the same purpose but other buildings may request more water requirement or less. We should sublate the pipe schedule system from national fire safety code and need to introduce the hydraulically designed system. The pipe schedule system presents easy access because it is based on the forecasted engineering calculations but it is applied to only small buildings like NFPA due to its low reliability.

New OTP Authentication Approach based on Table Pattern Schedule (테이블 패턴 스케줄 기반 OTP 인증)

  • Balilo, Benedicto B. Jr.;Gerardo, Bobby D.;Medina, Ruji P.;Byun, Yung-Cheol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.12
    • /
    • pp.1899-1904
    • /
    • 2017
  • This paper presents a new one-time password approach generated based on $4{\times}4$ pattern schedule. It demonstrates generation of passkey from initial seed of random codes and mapping out in table pattern schedule which will produce a new form of OTP scheme in protecting information or data. The OTP-2FA has been recognized by many organizations as a landmark to authentication techniques. OTP is the solution to the shortcomings of the traditional user name/password authentication. With the application of OTP, some have benefited already while others have had second thoughts because of some considerations like cryptographic issue. This paper presents a new method of algorithmic approach based on table schedule (grid authentication). The generation of OTP will be based on the random parameters that will be mapped out in rows and columns allowing the user to form the XY values to get the appropriate values. The algorithm will capture the values and extract the predefined characters that produce the OTP codes. This scheme can work in any information verification system to enhance the security, trust and confidence of the user.

Visualization and Optimization of Construction Schedule Considering the Geological Conditions in the Complicated Underground Cavern (지하비축기지 건설시 지질조건을 고려한 건설공정의 가시화와 최적화 사례)

  • Choi, Yong-Kun;Park, Joon-Young;Lee, Sung-Am;Kim, Ho-Yeong;Lee, Hee-Suk;Lee, Seung-Cheol
    • Tunnel and Underground Space
    • /
    • v.19 no.3
    • /
    • pp.167-173
    • /
    • 2009
  • Underground storage cavern is known as the most complicated underground project because of the complexity of construction schedule, tunnel size, and geological problems. In order to optimize the construction schedule of underground storage cavern, two up-to-date technologies were applied. The first technology was 3 dimensional visualization of complicated underground structures, and the second was 4 dimensional simulation considering construction resources, geological conditions and construction schedule. This application case shows that we can achieve optimized construction schedule in the ways to optimize the number of work teams, fleets, the sequence of tunnel excavation, the commencement time of excavation and the hauling route of materials and excavated rocks. 3 dimensional modeling can help designer being able to understand the status of complicated underground structures and to investigate the geological data in the exact 3 dimensional space. Moreover, using 4 dimensional simulation, designer is able to determine the bottle neck point which appear during hauling of excavated rocks and to investigate the daily fluctuation in cost.

Context-aware Smartphone Schedule Management (상황 인지 기반 스마트폰 일정 관리)

  • An, Hyeng-Bae;Byun, Sang-Hee;Park, Han-Sol;Lee, Hong-Chang;Lee, Myung-Joon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.16 no.3
    • /
    • pp.489-498
    • /
    • 2012
  • Smartphone schedule management applications are widely used in mobile environment with the help of their effective user interface and high user accessibility. Unfortunately, since the applications do not consider frequent context changes like user status or location, they can not support schedule management which reflects the changes. In this paper, we propose an intelligent notification service which gathers context information of users such as location and status, and actively provides appropriate services according to the context information. Based on the notification service, we also present a smartphone application for smart schedule management. Using the GPS sensor of a smartphone, the service can be aware of the status of the user through location and schedule information of the user. Also, according to the changed contexts, it provides proactive notifications to user.

Development of Navigation Program for Cancer Patients using Mobile application (암환자를 위한 모바일 앱용 네비게이션프로그램 개발)

  • Kwon, Geun-ae;Jeong, Ga-jin;Park, Joo-mi;Jung, Mi-kyoung;Seo, Hwa-jeong;Kim, Jee-yoon;Kim, Yeon-hee;Park, Jeong-yun
    • Quality Improvement in Health Care
    • /
    • v.21 no.2
    • /
    • pp.28-38
    • /
    • 2015
  • Objectives: The objectives of this research were to develop and evaluate a mobile application for navigation program for cancer patients who might experience some difficulties in obtaining and understanding further schedules, directions due to flooding information at a time and scattered educational materials. Methods: A mobile application was developed an educational mobile app for cancer patients based on a systematic instructional design model called ADDIE (Analysis, Design, Development, Implementation, and Evaluation) model. The developed application was evaluated by 76 users through a questionnaire of satisfaction. Results: A mobile app contains educational contents for cancer patients, based on their satisfaction, demand and knowledge about cancer education and information services. It contains management of symptoms, management of my schedule, and information about chemotherapy, FAQ, symptoms dangerous enough to contact the hospital, personal history about how to overcome cancer, hospital convenience facilities and education schedule of cancer center. A result of the evaluation of user's satisfaction showed 59.4% responding 'Satisfied' and 27.4% 'Very satisfied'. Conclusion: The personalized information and education contents for cancer patients by using the mobile application was given to cancer patient and then educational outcomes became more effective. The development of the application which persons can use regardless of time and place enables health care providers to acquire the foundation of the patients-oriented educational system. Education satisfaction and knowledge level was increased, after using mobile application.

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects (건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정)

  • Lee, Pil-Yoon;Lee, Seong-Won;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.669-676
    • /
    • 2018
  • Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.