• Title/Summary/Keyword: Apartment Remodeling Project

Search Result 60, Processing Time 0.029 seconds

A Research about Importance and Satisfaction in Each Tasks on Apartment Remodeling (공동주택 리모델링 사업의 업무별 중요도 및 만족도 조사)

  • Oh, Chi-Seob;Choi, yun-ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.6
    • /
    • pp.35-43
    • /
    • 2018
  • As rapid increasing of domestic apartments, decline of the market value of the old apartment and to be announced policy by government are re-lighting to be insufficient growth than the past 15 years in market of apartment remodeling. In this study, research the conflicts on apartment remodeling project and analysis of importance and satisfaction by survey. Also, the survey was being progressed for every participant who are related in an apartment remodeling project. After this study, this study will propose basic data for effective way to improve on apartment remodeling project. For this purpose, generalize the project stage level by level. And analysis status of business progress to be felt from participants of project. According to the results by a survey, the each result of elements can be a reference value for a good way of apartment remodeling to proceed and improve.

Approach of establishing As-Is BIM Model Process in Apartment Remodeling project using 3D Laser Scanning. (공동주택 리모델링 사업에서 3D 레이저스캐닝 기술을 활용한 기존 구조체 As-Is BIM모델 구축 프로세스 제안)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.183-184
    • /
    • 2015
  • More than 50% of the existing buildings in Korea are over 15 years old. Therefore it is necessary to be held reconstruction or remodeling deteriorated buildings more efficiently. Especially, since remodeling project reserves existing structures, it requires less period of project and construction period compare to reconstruction. It is possible to minimize uncertainty in communication between participants and able to manage information and construct efficiently in remodeling projects. This paper is first step of integrated BIM-based whole lifecyle management of apartment remodeling process. It suggests 3D laser scanner specification factors and site constraint factors for mapping between two groups. Therefore it will contribute to develop mapping algorithm of two groups and find optimal combination for apartment remodeling.

  • PDF

The Analysis of Risk Factors for Apartment Remodeling Feasibility Study (공동주택 리모델링 사업성 평가를 위한 위험요소 분석)

  • Lee Teck-Wn;Kim Kyoon-Tai;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.84-92
    • /
    • 2002
  • Recently, apartment-remodeling project is booming since various reconstruction controls are tightened. However, the project has difficulties because management systems used for apartment-remodeling projects are not available. Identifying and analyzing risk factors that are required for risk management, this paper suggests the risk level through paired comparison performed by AHP method and probability assessment for risk level analysis. It is expected that this research will be utilized to minimize the risk of apartment remodeling project and for basic materials to perform the project and helpful to change newly build-oriented construction into sustainable industries. Hereafter using the risk factor analysis data of this paper for this research project, risk management model is considered to be constructed.

Policy Direction in Responses to Demand for Apartment Remodeling (공동주택 리모델링 수요에 대응한 정책 추진방안)

  • Lee, Yeo-Kyung;Kim, Eun-Hee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.1
    • /
    • pp.125-136
    • /
    • 2020
  • This study aims to seek a proper policy direction in response to the demand for apartment remodeling. As the research methods, we diagnosed the current status of the remodeling policy and analyzed the demand for apartment remodeling nationwide. According to the result of analysis, we suggested the fundamental direction and tasks for remodeling policies to be pursued at the government level. The results of the study are summarized as follows. First, the result of analysis showed that the demand for environmental improvement(performance improvement) remodeling project was much higher than other types of remodeling projects. The percentage of unit increased-type remodeling that can secure business feasibility is about 10% and only 30% when it comes to reducing project costs. The remaining 70-90% need to be promoted in environmental improvement remodeling projects which dependent on the residents' payment. Second, in order to prepare a policy action plan in response to the demand for apartment remodeling, it is necessary to set up clear policy goals and strategies for apartment remodeling in advance at the national level. Along with proactive goals and strategies, graded policy support should be accompanied per type of remodeling and business demand. We also suggest to simplify administrative procedures and support the R&D research to develop technologies. It would help to utilize the unit increased-type remodeling. On the other hand, for utilizing the environmental improvement remodeling which takes up a relatively high proportion, the policy should take care of as follows: offering housing performance information, rationalizing long term repair reserve, fostering small companies and experts. Finally, apartment management system should be advanced from the perspectives of managing old apartments and institutional foundations such as new construction and customized regulations for differentiated remodeling should be accompanied.

An Analysis of Influence Factors for the Remodeling Project Management of Apartment Buildings -Focused on Construction Phase- (공동주택 리모델링 사업관리를 위한 영향요인 분석 -시공단계를 중심으로-)

  • Shim, Gyu-Jung;Seo, Jong-Min;Na, Young-Ju;Song, Yong-Sik;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.8 no.5
    • /
    • pp.77-83
    • /
    • 2008
  • Housing development, particularly apartment buildings, has been increasingly growing due to the construction promotion policy of the government since the 1980s. However such a volume-oriented policy results in unfavorable side effect of substandard quality and early deterioration in line with the expansion in volume. As part of measures to deal with the problems, rebuilding and remodeling have surfaced as alternative recently. Remodeling is expected to create the more benefits, compared to the rebuilding, in cost, efficiency and duration. To come up with the solution to such a challenge, it's necessary to analyze the influence factors of remodeling. Hence, the study was intended to compare the remodeling in the aspect of influence factors. The results of this study is expected to the propose of effectual management factors of the remodeling construction.

Improved Methods of Cost Sharing in Apartment Remodeling Projects (공동주택 리모델링 사업 분담금 산정의 문제점 및 개선방안)

  • Kim, Jeong-Won;Lee, Dong-Jin;Lee, Min-Joo;Lee, Ji-Hyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.184-185
    • /
    • 2019
  • The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.

  • PDF

Conflict Management in Planning phase of Remodeling Project through Multi-Agent based on Fuzzy Inference. (퍼지추론 기반 멀티 에이전트를 통한 리모델링 사업 전 추진단계에서의 갈등관리)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.202-203
    • /
    • 2015
  • To promote the remodeling project it is important to get apartment residents' consent. It is significant variable to determine project to progress smoothly from planning stage which committee of association establishment sets up to establishment stage of association. On average, it takes about 1~1.6 year in planning phase which means before construction phase of remodeling. Therefore, it is very important issue to get apartment residents' consent in planning phase. In this research, we focused on residents' opinion and proposed solution of conflict with gathering residents' opinion to proceed remodeling project. By setting particular remodeling situation, related residents represented as agents made effort to efficient coordination to reduce total duration of decision making. Therefore, we proposed multi-agent based on fuzzy inference to simulate behavior of decision making on remodeling project effectively. From this method, optimal alternative is selected by considering each agents' attributes which represented by fuzzy set. This research will develope to further research for realizing concrete multi-agent based on fuzzy inference considering all stakeholders in remodeling project.

  • PDF

Automated Data Analysis of Floor Plans for the Remodeling of Apartment Housing

  • Seo, Wonseok;Kim, Seongah;Park, Junseok;Kim, Jinyoung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1059-1066
    • /
    • 2022
  • In 2020, it was estimated that more than 2.4 million households in South Korea are over 30 years old. That is, more than 40% of all houses in Korea are old and that they require proper rehabilitation. The two options to improve poor living conditions are reconstruction and remodeling. Compared to reconstruction, remodeling has advantages in terms of the construction period, cost, and environmental impact. As such, the current Korean regulations are more favorable for remodeling than reconstruction. Typically, several candidate floor plans are presented in the early stages of an apartment remodeling project. Extracting information about bearing walls and other structural elements from the multiple plans to compare those plans quantitatively is one of the essential tasks during the early stage of a project. To cope with this task, an automated data extraction method for walls and slabs from before and after remodeling plans is developed. Through the developed program, load-bearing walls, non-bearing walls, slabs, and weight changes after remodeling can be analyzed and visualized in a fast and automated manner.

  • PDF

A RESEARCH ON ECONOMIC AWARENESS AND REQUIREMENT OF DWELLERS TOWARD REMODELING OF APARTMENTS

  • Jea-Sauk Lee;Byung-Hyun Shin;Won Kwon;Chang-Hyun Shin;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.469-479
    • /
    • 2007
  • This paper introduces the result of performing research analysis on awareness and demand on economic aspect of dwellers toward remodeling by aiming at the fact that there are existing dwellers which is the biggest feature of remodeling. Providing services that are suitable for economic conditions and demands of owners or dwellers of Apartment House could be seen as something that must be considered first above all things in remodeling in which consumers have to pay for expenses are specified.

  • PDF

A Management Condition of Apartment House and Improvement Strategy of Remodeling (공동주택관리실태 및 리모델링 활성화 방안)

  • 유인근;정동환;윤여완;김천학;양극영
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.77-83
    • /
    • 2004
  • Apartment Building remodeling market is now growing centering around non housing building. Unlike non housing building remodeling business, understanding of remodeling demanders accustomed to profit of reconstruction, deficiency of experience performing remodeling project and construction, shortage of will performing remodeling policy and detailed action method are difficulties in performing apartment building remodeling business. Understanding change of remodeling demanders, strong economic incentive by government, construction management paradigm shift from new construction into building life cycle, application of construction method using existing building condition before remodeling and remodeling related industry infrastructure are required to improve this remodeling business circumstances.

  • PDF