• Title/Summary/Keyword: Apartment Housing Projects

Search Result 100, Processing Time 0.025 seconds

Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor- (아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로-)

  • Han Choong-Hee;Bang Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.87-96
    • /
    • 2004
  • The construction duration in apartment construction is an important factor which affects project cost. Henceforth, the time shortening is essential to retrench project cost and project risk when there adopt Five-Day Workweek and introduce apartment sales after completion of construction. Therefore, the purpose of this study is to examine closely the affecting factors on the duration of framework which forms about $40\sim50\$ percent of total time in apartment construction by analyzing the schedule mechanism of typical floor and to show the reasonable time shortening methods by case study. The shown schedule mechanism and basic schedule table can utilize as a guideline in case of scheduling of framework in the existing construction method. Also, the shown time shortening methods by three case studies will guide the direction and process of time shortening while there need time shortening in many-sided projects.

STUDY ON THE REASONS FOR OLD AGED APARTMENT REMODELING

  • Kyeong-Seok Chae;Jin-Gu Park;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.544-549
    • /
    • 2009
  • Alongside the increasingly larger domestic construction projects is the gradual rise in construction waste. Consequently, serious environmental problems emerge. The increase in demand for housing remodeling due mainly to the increase in national income and improvement of quality of life is the main reason for the increase in construction waste. This study was conducted as the basic study for the prevention and reduction of construction waste generated by apartment remodeling; it aimed at identifying the remodeling items and reasons. Toward this end, this study targeted apartments at least 15 years old and conducted a questionnaire survey to determine the remodeled sections and remodeling reasons. As a result of the questionnaire survey, the bathroom, floor finishing, and kitchen furniture recorded the highest ratios in remodeling. Old materials, aesthetic motivation, and pleasant living space composition were cited as the major remodeling reasons. This study is significant as a basic study for generating environmental and economic profits through systematic waste management. Further studies should develop guidelines suitable for construction waste reduction and recycling in line with the construction and demolition phases in case of remodeling.

  • PDF

PSM based Price Estimating for Local Mixed-Use Apartment Development (PSM기반 중소도시 주상복합 아파트의 분양가 추정에 관한 연구)

  • Park, Jaekyung;Cho, Yongkyung;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.86-94
    • /
    • 2014
  • Since the late 1990s, mixed-use apartment, armed with high qualities and large scales with a high ratio of TFA(Total Floor Area) have been continuously provided accommodating exclusive community facilities along with high-tech securities, not to mention excellent skyline view. However, especially in mid-small cities, there have been only a few supplies. As a result, none of the mixed-use housing provided by high-end brands has ever been built in non-metropolitan area. But constructors couldn't plan the projects which aims to build the mixed-use apartment in local city, because they couldn't get the basic data or advanced research for feasibility analysis. Therefore, to suggest the useful price for mixed-use apartment supply project of local city, the PSM(Price Sensitivity Method) widely used for determining the price preferences as a market research tools has been applied. As analysis results, the estimated price of mixed-use apartment is 10.8% higher than general apartment, and mixed-use apartment has lower price sensitivity than general apartment. As price determinants, the age, education level and family size influence on UTP in significant level. It is expected that these research findings can be applied for establishing the solid marketing strategy of mixed-use apartment development project in local city.

A Basic Study on Estimation Model Development by Applying Probabilistic Forecasting Method for Determining Optimal Price of Residential Officetel (확률론적 추정 기법을 적용한 주거형 오피스텔의 최적 분양가 산정 모델 개발 기초연구)

  • Jang, Jun-Ho;Kim, Tae-Hui;Ha, Sung-Eun;Son, Ki-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.191-192
    • /
    • 2017
  • In response to the economic depression, the demand for fixed rent income has increased according to the easing construction regulations. it caused indiscriminated investment to stakeholders. This leads to oversupply in the multi-family Housing market and increases unsold housing and vacancy rates except specific area such as Gangnam-gu.In order to solve this issue, although studies on the optimization price of apartment houses has been conducted, the study is insufficient regarding on residential officetel. Therefore, the objective is to suggest a basic study on optimal price estimation model development by using probabilistic forecasting method in planning phase. To achieve the objective, first, variables are defined such as expenses, financial costs, income, etc. Second, causal loop diagram is suggested. Third, basic optimization prices estimation model is developed. In the future, this study can be used as one of decision making tools in planning phase of officetel development projects.

  • PDF

A Comparative Analysis of Supplier's Profitability According to the Different Sales Timing in Apartment Housing (공동주택의 분양시기 변화에 따른 공급자의 수익성 비교 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.25-34
    • /
    • 2012
  • It has been five years since the Post-Construction Sale System of Housing was introduced. The purpose of this study is to identify objectives and effects of the Post-Construction Sale System of Housing and analyze change of profitability at different sales time from a supplier's point of view. Apartment buildings construction projects performed in Seoul are used for the case study. The present value of sales revenues, sensitivity and the present value of expected sales prices are analyzed. According to the findings, first, profits made from a Pre-construction sales system was 5.1%~6.2% higher than those from a Post-construction sales system. Among four plans of a Pre-construction sales system (A, B, C and D plan), sales revenue from the A plan, which takes a deposit at the time of starting construction, was the greatest. Second, increase of the rate of discount and decrease of sales revenues are in direct proportion. The bigger rate of discount leads actual reduction of sales revenues. Third, for the present value of sales revenues reflecting change in basic model construction cost, a Pre-construction sales system showed a little higher than that of a Post-construction sales system by approximately 2%. It should be known that this study suggests profitability of Pre-and Post-construction sales system by clearly measuring them in the supplier's point of view and calculates sales revenues, considering change of a sale price following change of sales time.

Analyzing Construction Planning Tasks for Performance Improvement (공동주택 설비공사 계획 업무의 중요도 분석에 관한 연구)

  • Kang, Sang-Hun;Kim, Dae Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.165-166
    • /
    • 2018
  • The main focus of this study is the analysis of the importance of the planning work of apartment housing projects. Group the detailed work of the facility into five major tasks, categorize each into five major categories, organize the construction plans (P1 through P 6), name the plans (C4), and analyze the quality of the environmental management plans (E1 through E 4) Finally, this study derived major planning tasks from the correlation between planning and cost metrics and from the T-test.

  • PDF

Analysis Methodology for Feasibility Study of Remodeling of Aged Apartment by Comparative Analysis of Price Influencing Factors (가격 영향요인 비교분석을 통한 노후 공동주택 맞춤형 리모델링의 사업성 분석 방법론 제안)

  • Bae, Byungyun;Kim, Kyungrai;Shin, Dongwoo;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.47-56
    • /
    • 2017
  • As of 2017, there are 848 million households living in apartment and 55.87% of Aged apartments over 15 years old. The allowable standard for remodeling the apartment is more than 15 years and the market for remodeling the apartment will continue to increase. For the success of the remodeling project feasibility analysis is important but the existing feasibility analysis of new construction and reconstruction is being used for remodeling feasibility analysis. Therefore, it is necessary to study the feasibility analysis of customized remodeling without increasing the number of households according to the building law. Purpose of this paper is to develop a feasibility analysis methodology for customized remodeling projects by deriving the factors affecting the formation of land prices and building prices in apartment. According to the concept of price formation of the apartment, the analysis method of the customized remodeling of the old apartment using the factors affecting the Land Price Indexes, Officially Assessed Individual Land Price, House Price Indexes, and Officially Assessed Individual House Price was suggested. The Stair Price Algorithm developed in this research can be utilized at the stage of selecting remodeling contractors after the remodeling housing association is established.

A Case Study on BIM-enabled Evaluation of Design Alternatives for an Actual Remodeling Project in Korea - Focusing on the Spatial Program Review in Early Phase of Design -

  • Kim, Hyunjung;Lee, Jin-Kook
    • Korean Institute of Interior Design Journal
    • /
    • v.24 no.5
    • /
    • pp.117-127
    • /
    • 2015
  • This paper depicts a case study of the BIM (Building Information Modeling)-enabled evaluation of design alternatives for an actual remodeling project in Yeongwol, Korea. The increase of urban population and income followed by the growth of economy has derived massive supply of grand scale housing project in Korea since 1970s. Consequently, building remodeling became one of the feasible resolutions for renovating such old housings in these days. This paper aims to introduce a technical approach to such remodeling projects based on BIM-enabled applications focusing on quantitative analysis of design alternatives. Among the technical issues of such building remodeling projects, this paper focuses on the BIM-enabled area analysis and comparison between design alternatives to support decision-making even in early phase of remodeling design process. BIM and its variety of applications have broadly influenced the domain of AEC-FM (Architecture, Engineering, Construction, and Facility Management) within the lifecycle of buildings. As one of the applications facilitated by BIM, the automated area calculation and scenario-based comparison between alternatives can play an important role in the early phase of remodeling project. We modeled three design alternatives (buildings) and three housing modules (units) based on the actual case in Yeongwol city, Korea using a BIM design authoring tool. Nine combinatorial BIM models were demonstrated for the BIM-enabled review process described in this paper. To determine the most optimal design scenario among nine alternatives, this paper demonstrates a result of the conducted spatial program review. The main subject includes specific spatial program issues on; 1) the number of unit spaces; and 2) area of individual/grouped and private/shared spaces.

The Water Circulation Improvement of Apartment Complex by applying LID Technologies - Focused on the Application of Infiltration Facilities - (LID 기술 적용을 통한 공동주택단지 물순환 개선 연구 - 침투시설 적용을 중심으로 -)

  • Suh, Joo-Hwan;Lee, In-Kyu
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.5
    • /
    • pp.68-77
    • /
    • 2013
  • Change in the Global Climate causes flood, drought, heavy snow, and rainfall patterns in the Korean Peninsula. A variety of alternatives related to climate change are considered. The foreign researchers are interested in Low Impact Development(LID); the utilization of water resources and eco friendly development, over 10 years ago. The research and development of related technology has been advanced to apply LID techniques in order to develop several projects in the country. However, sharing of technology or system that can be used easily in the private sector is insufficient. The performance of the elements of LID Technology has not been fully agreed. LID elements of this technology are easy to apply to Apartment complex. The elements are classified technology. The infiltration of elements performs the functions of apartment complex landscaping space technology applied to the target. The water cycle simulation(SWMM 5.0) and technology the implementation of the effectiveness is also verified. For this purpose, three different places in apartment complex to target by SWMM5.0 U.S. EPA conducted utilizing simulated rainfall and applying LID techniques before and after the simulated water cycle (infiltration, surface evaporation, and surface runoff) were conducted. The importance of green space in the LID techniques of quantitative and qualitative storm water control as well as the role of Apartment Housing is to promote Amenity. Remember that the physical limitations of apartment complex and smooth water circulation system for the application of LID integrated management techniques should be applied. To this end, landscapes, architecture, civil engineering, environmental experts for technical consilience between the Low Impact Development efforts are required.

Selection Method of Eco-friendly Finishing Materials Considering Cost Efficiency for the Aged Housing Remodeling Projects (노후 공동주택 리모델링의 경제성을 고려한 친환경 실내 마감재료 선정 방안)

  • Kim, Ki-Hyun;Kim, Kyung-Rai;Hwang, Young-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.84-91
    • /
    • 2008
  • "Eco-friendly construction" is an emerging issue in the building industry. Main purpose of the eco-friendly construction is to sustain the health and environment of building residents and to minimize the harmful effect on their environment. Apartment residents have great concern on eco-product, since many cases are reported that Sick Building Syndrome is caused by toxic substance from building materials. Environmental performance is to meet through using the highest grade eco-friendly materials. However, generally eco-friendly materials are more expensive than normal materials, Therefore, using eco-friendly materials at public housing project is limited to economical aspect. The purpose of this paper is development of eco-friendly material selection model considered cost efficiency. The selection of Eco-friendly finishing materials and their methods are constructed to consider environmental performance level and cost index compositively. Development of eco-friendly material selection method is economic and reasonable one when public housing is constructed.