• Title/Summary/Keyword: Amount of supply

Search Result 1,358, Processing Time 0.027 seconds

Emission characteristics of diesel engine by mixing LPG (디젤기관의 LPG 혼합에 의한 오염배출물 저감특성)

  • 장영준;전충환;이춘우
    • Journal of the korean Society of Automotive Engineers
    • /
    • v.15 no.2
    • /
    • pp.44-52
    • /
    • 1993
  • In this study, the characteristics of decreasing exhaust gas of diesel engine was examined in dual fuel method by using commertial LPG for automotive. LPG was supplied to engine intake port by fumigation method and flow rate was controlled by using the needle valve. LPG supply ratios were 0, 20, 30% of total fuel amount to be supplied to engine by mass base. We investigated the effect of LPG supply ratio on exhaust gas concentrations related to excess air ratio and engine load at 1600, 1800, 2000 rpm. Soot concentration decreased about 30% in proportion to the increase of the LPG supply ratio. NOx concentration decreased in proportion to the increase of the LPG than diesel only and the increase rate was higher at low engine load. BSFC(Brake specific fuel consumption) was lower in proportion to the increase of the LPG supply ratio at high engine load and to the decrease of LPG supply ratio at low engine load.

  • PDF

Analysis of Operation Plan by Multipurpose Supply for Heightened Agricultural Reservoir (둑높임저수지 다중용수공급에 따른 운영 방안 분석)

  • Kim, Hae Do;Lee, Kwang Ya;Park, Jong Yoon;Han, Guk Heon;Lim, Heung Chang
    • KCID journal
    • /
    • v.19 no.1
    • /
    • pp.77-86
    • /
    • 2012
  • The aim of this study was to analyze the operation plan for heightened agricultural reservoir, in terms of water supply to downstream paddy fields and instreams. Operation of agricultural reservoir before the heightened reservoir project is easy to manage because of its single purpose, which is irrigation water supply. However, after proceeding the heightened project, there is needed to be set the operation rule because of its multiple purpose, which is water for irrigation and supply to the stream. In this paper, propose the method of design the criteria of supply to the stream and operation rule curve for the heightened reservoir. According to simulation results by proposed operating rule for the Gumsa reservoir, the yearly amount of water supply to the stream can be 2,588 thousand $m^3$, 3 times of the heightened space (2,588 thousand $m^3$).

  • PDF

The Analysis on the Relationship between Household Debts and Married Women's Labor Supply (가계부채와 기혼여성 노동공급의 관계 분석)

  • Song, Heonjae;Shin, Woori
    • Journal of Labour Economics
    • /
    • v.40 no.1
    • /
    • pp.37-68
    • /
    • 2017
  • This study analyzes the relationship between household debts and married female's labor supply. For doing this we construct effective interest rate faced by each household using interest paid amount and household financial debt amount. The effective interests rate for the households which have no financial debt are estimated by Heckman Selection model. The estimation results show that the increase in effective interest rate has led to the expansion of married women's the labor market participation. This suggests a possibility that negative scenarios resulting from an increase in interest rate can be partially offset by an increase in household labor supply and a rise in labor income.

  • PDF

An Analysis of Relation between Supply Criteria of Public Facilities and Residents' Satisfaction for the Community Revitalization in the Apartments (공동주택 내 커뮤니티 활성화를 위한 주민공동시설 설치기준과 주민 만족도와의 관계 분석)

  • Choi, Ki-Taek;Lee, Joo-Hyung
    • KIEAE Journal
    • /
    • v.11 no.6
    • /
    • pp.19-28
    • /
    • 2011
  • This study examines the current status on the supply of community facilities based on the supply criteria of present welfare facilities. Analyzing satisfaction of residents about community facilities based on physical supply criteria. The study sets up the concept and proposed trend of the related studies and distinction through the examination of previous researches. Next, the present systematical supply criteria, was used to make indication in order to propose the promotion of improvement on supply criteria for community facilities. Multi dimensional analyzing system and the satisfaction level of the community facility was used to analyze the relationship between the two. The direction of policy improvement according to the analysis is as per the following. First, it is necessary to improve supply criteria of household to guarantee the minimal amount of space. Second, specification of the minimum distance of community facility to residential area in the complex is needed. Also, the presentation of bottom boundary line of the formation area size to expand the size up to minimal level of size is needed. Third, resident exercise facility supply criteria among the community facility supply criteria need to be improved from the number of household base to the size for each household base. Forth, resident resting facility criteria among the community facility supply criteria should be changed from the present criteria of one facility per five hundred households.

A Linear Programming Approach for Supply Network Planning based on Supply Chain Collaboration Strategy (선형계획법을 이용한 협업공급망계획 수립모델)

  • Lee, Seung-Keun;Lee, Hong-Chul
    • IE interfaces
    • /
    • v.17 no.4
    • /
    • pp.472-481
    • /
    • 2004
  • In this paper, we propose a linear programming model of supply planning process for the supply chain collaboration strategy of a company. The amount of its supplying quantity relies on outsourcing suppliers heavily. Conversely, the revenues of those suppliers are highly dependent on the supplying quota from the supply network planning of the company. In order to keep the supply stable through collaboration, the company builds such a policy to guarantee the fairness on revenue between the supplies. For this, the supply network plan should keep the capacity utilization ratio even for all the suppliers. But the production capacities are different and the distribution of molds is disproportional through suppliers, so the supply network plan is not easily established with simple arithmetic processes. Therefore, we developed the linear programming model with those target function and constraints minimizing the costs for holding inventory and penalty of delayed delivery, simultaneously guaranteeing the even capacity utilization through suppliers. The proposed model has been applied to real case and the evaluation for the planning result from the model would be followed in order to make sure that our model guarantee on extracting the supply network plan subordinated to the policy. Also we mention about further studies for improvement of the model.

Estimating Vulnerable Duration for Irrigation with Agricultural Water Supply and Demand during Residual Periods (농업용수의 잔여 공급계획량 및 수요예측량에 의한 관개 취약시기 산정)

  • Nam, Won-Ho;Kim, Tae-Gon;Choi, Jin-Yong;Lee, Jeong-Jae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.5
    • /
    • pp.123-128
    • /
    • 2012
  • For optimal reservoir operation and management, there are essential elements including water supply in agricultural reservoir and demand in irrigation district. To estimate agricultural water demand and supply, many factors such as weather, crops, soil, growing conditions cultivation method and the watershed/irrigation area should be considered, however, there are occurred water supply impossible duration under the influence of the variability and uncertainty of meteorological and hydrological phenomenon. Focusing on agricultural reservoir, amount and tendency of agricultural water supply and demand shows seasonally/regionally different patterns. Through the analysis of deviation and changes in the timing of the two elements, duration in excess of water supply can be identified quantitatively. Here, we introduce an approach to assessment of irrigation vulnerable duration for effective management of agricultural reservoir using time dependent change analysis of residual water supply and irrigation water requirements. Irrigation vulnerable duration has been determined through the comparison of water supply in agricultural reservoir and demand in irrigation district based on the water budget analysis, therefore can be used as an improved and basis data for the effective and intensive water management.

Analysis on the Replacement Cost of Nuclear Energy Using a Stochastic Programming Model (확률계획법을 활용한 원자력 대체비용의 분석)

  • Chung, Jaewoo;Min, Daiki
    • Korean Management Science Review
    • /
    • v.30 no.1
    • /
    • pp.139-148
    • /
    • 2013
  • A nuclear energy has been one of the most important sources to securely supply electricity in South Korea. Its weight in the national electricity supply has kept increasing since the first nuclear reactor was built in 1978. The country relies on the nuclear approximately 31.4% in 2012 and it is expected to increase to 48.5% in 2024 based on the long-term electricity supply plan announced by the Korean government. However, Fukushima disaster due to 9.0 magnitude earthquake followed by the tsunami has raised deep concerns on the security of the nuclear power plants. The policy makers of the country are much interested in analyzing the cost structure of the power supply in the case that the nuclear is diminished from the current supply portion. This research uses a stochastic model that aims to evaluate the long-term power supply plan and provides an extensive cost analysis on the changes of the nuclear power supply. To evaluate a power supply plan, the research develops a few plausible energy mix scenarios by changing the installed capacities of energy sources from the long-term electricity supply plan. The analyses show that the nuclear is still the most attractive energy source since its fuel cost is very much stable compared to the other sources. Also the results demonstrate that a large amount of financial expenditure is additionally required every year if Koreans agree on the reduction of nuclear to increase national security against a nuclear disaster.

Demand and Supply of Dental Manpower by the Econometrical Model (계량경제모델에 의한 치과의사 이력수급에 관한 연구)

  • 김용란;이승우
    • Journal of Oral Medicine and Pain
    • /
    • v.6 no.1
    • /
    • pp.45-56
    • /
    • 1981
  • The demand and supply of dentists was studied by the econometrical model. It is based on the data of socio-economic-cultural statistic from 1967 to 1977; GNP, average monthly consumption expenditure per household, consumption of milk, populat ion, consumption of energy, water supply per person a day and entrance rate of senior high school. 1.The curved regression equation and multiple correlation coefficient (R)between the number of dentists(Y) and year (x)were $Y=4,122(1.06)^x$,R=0.995. 2. From 1982 to 1985, expected demand and expected supply will be approximately balanced. But dentists will be oversupplied conspicuously from the year of 1986. Such a oversupply will be remarkably incresed to the amount of 1860 in the year of 2000. 3. It is seemed that balanced number of graduates of dental colleges will be about 350 to the year of 1985, from the year of 1986, will be about 450, from the year of 1981, will be about 600 and from the year of 1996, will be about 700. 4. In 2000, persons served by each dentist will be 3550 by the expected supply and 4120 by the expected demand.

  • PDF

Establishment of Life Cycle Management(LCM) System for Water Supply and Sewerage Systems (상하수도시설에 대한 전과정관리(LCM)시스템 구축방안 연구)

  • Park, Ji-Hyoung;Hwang, Young-Woo;Kim, Young-Woon;Park, Kwang-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.2
    • /
    • pp.303-312
    • /
    • 2012
  • Water supply and sewerage systems are the large-scale urban infrastructure ejecting large amount of environmental load over the life-cycle. Therefore, it is important not only to optimize in the aspect of economical superiority and process efficiency but also to consider earth scale environmental impact. This study aimed to suggest the establishment of life cycle management(LCM) system as an integrated management solution in urban water supply and sewerage systems. As a result, the methodology for LCM system consisting of life cycle assessment(LCA), life cycle cost(LCC), life cycle $CO_{2}(LCCO_{2})$ and life cycle energy(LCE) was developed. Also, several case studies using the latest statistics data of water supply and sewerage systems were carried out to investigate the field applicability of LCM.

A Study on the Effect of the Inventory Policy on Military Supply Chain Performance - Focused on System Dynamics - (재고정책에 따른 군 공급체인 성과에 관한 연구 - 시스템 다이나믹스를 중심으로 -)

  • 안병기;김태현;문성임
    • Journal of the military operations research society of Korea
    • /
    • v.28 no.2
    • /
    • pp.1-19
    • /
    • 2002
  • This study shows the effect of inventory policy change from supplier-based to customer-based. We focus on the service level, cost, and information distortion of the Military Supply Chain(MSC) with System Dynamics. We design MSC model according to field practician interviews by using Vensim. The simulation makes a comparison between supply-based inventory policy performances and order-based inventory policy performances. In order to evaluate the MSC performances, we measure the accumulation of backlog(service level), supply chain cost, and order percentage overshoot(information distortion). The results show that 1) changing inventory policy from supplier-based to end customer order-based gets a good customer service, reduces MSC cost, and prevents information distortion, 2) changing inventory policy from supplier-based to immediate customer order-based reduces a small amount of MSC cost and deteriorates customer service, and 3) supply level is main factor for MSC performances improvement. This study implicates the policy change makes a improvement of MSC performance without introducing information system.