• Title/Summary/Keyword: Allocation rule

Search Result 106, Processing Time 0.027 seconds

On the Optimal Allocation of Labour Gangs in the Port (항만하역 노동력의 효율적인 배분에 관하여)

  • Lee, Cheol-Yeong;Woo, Byung-Goo
    • Journal of Korean Port Research
    • /
    • v.1 no.1
    • /
    • pp.21-47
    • /
    • 1987
  • Nowaday all the countries of the world have studied the various problems caused in operating their own ports efficiently. Ship delay in the port is attributal to the inefficient operation in the navigation aids, the cargo handling, the storage and transfer facilities, and to the inefficient allocation of gangs or to a bad service for ships. Among these elements the allocation of gangs is the predominating factor in minimizing ship's turn round time. At present, in the case of Pusan Port. the labour union and stevedoring companies allocate gangs in every hatches of ships by a rule of thumb, just placing emphasis on minimizing ship's turn round time, without applying the principle of allocation during the cargo handling. Owing to this the efficiency of the cargo handling could not be expected to be maximized and this unsystematic operation result in supplying human resources of much unnecessary surplus gangs. Therefore in this paper the optimal size and allocation of gangs for minimizing the ship's turn round time is studied and formularized. For the determination of the priority for allocation the evaluation function, namely $F=PHi^{n}{\times}(W+H)$, can be obtained; where, PHI : Principal Hatch Index W : Total Cargo Weight represented in Gang-Shifts H : Total Number of Ship's hatches and also for the optimal size of gangs the average number of gang allocated per shift (Ng), namely Ng=W/PHI, is used. The proposed algorithm is applied to Pusan Port and its validity is verified.

  • PDF

An Interdependent Data Allocation Scheme Using Square Root Rule of Data Access Probability (데이터 액세스 확률의 제곱근 법칙을 이용한 상호 관련 데이터 할당 기법)

  • Kwon, Hyeokmin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.5
    • /
    • pp.75-84
    • /
    • 2015
  • A data allocation technique is essential to improve the performance of data broadcast systems. This paper explores the issues for allocating data items on broadcast channels to process multiple-data queries in the environment where query profiles and query request rates are given, and proposes a new data allocation scheme named IDAS. The proposed scheme employs the strategy that the broadcast frequency of each data is determined by the square root value of its relative access probability. IDAS could enhance the performance of query response time since it can process queries of high request rate fast and show a resonable degree of query data adjacency. Simulation is performed to evaluate the performance of the proposed scheme. The simulation results show that IDAS outperforms other schemes in terms of the average response time.

Bus 형 LAN의 Contention-Token 혼합형 프로토콜에 관한 연구

  • 김정선
    • Information and Communications Magazine
    • /
    • v.4 no.4
    • /
    • pp.505-524
    • /
    • 1987
  • Nowaday all the countries of the world have studied the various problems caused in operating their own ports efficiently. Ship delay in the port is attributal to the inefficient operation in the navigation aids, the cargo handling, the storage and transfer facilities, and to the inefficient allocation of gangs or to a bad service for ships. Among these elements the allocation of gangs is the predominating factor in minimizing ship's turn round time. At present, in the case of Pusan Port. the labour union and stevedoring companies allocate gangs in every hatches of ships by a rule of thumb, just placing emphasis on minimizing ship's turn round time, without applying the principle of allocation during the cargo handling. Owing to this the efficiency of the cargo handling could not be expected to be maximized and this unsystematic operation result in supplying human resources of much unnecessary surplus gangs. Therefore in this paper the optimal size and allocation of gangs for minimizing the ship's turn round time is studied and formularized. For the determination of the priority for allocation the evaluation function, namely $F=PHi^{n}{\times}(W+H)$, can be obtained; where, PHI : Principal Hatch Index W : Total Cargo Weight represented in Gang-Shifts H : Total Number of Ship's hatches and also for the optimal size of gangs the average number of gang allocated per shift (Ng), namely Ng=W/PHI, is used. The proposed algorithm is applied to Pusan Port and its validity is verified.

  • PDF

A Part Release Method Considering Tool Scheduling in FMS (FMS에서 공구 일정계획을 고려한 부품투입 방법)

  • 이충수;최정상
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.28 no.1
    • /
    • pp.1-10
    • /
    • 2003
  • A recent trend In flexible manufacturing systems (FMS) Is to utilize the Identical versatile machines with fast tool delivery devices. Unlike a conventional FMS where parts are fed to the machines with the required tools, tools are acquired from other machines using a tool delivery system and parts can be finished on the same machine In these FMS. Therefore it Is more important problem 4o plan tool flow using tool delivery system In these FMS rather than part flow In conventional FMS. According to the existing study, In FMS 20∼30 percent of the total management cost Is the cost related with tools and It Is possible to reduce the tool Inventory by 40 percent using efficient tool allocation. In this study, In FMS under dynamic tool allocation strategy, a new method of part release considering tool flow at the stage of part release Is proposed. In order to prove the efficiency of the proposed part release It is compared with other part release through simulation experiments. Performance measures in these experiments are the throughput and the number of tardy parts.

A Load Flow Based Approach to Transaction Cost Allocation in Transmission Network (조류계산에 기초한 탁송요금 계산)

  • Park, Young-Moon;Lim, Jung-Uk;Won, Jong-Ryul;Park, Jong-Bae
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.1149-1152
    • /
    • 1997
  • This paper describes a novel approach for allocating transmission costs among users of transmission services. In the suggested approach, the cost share of each participant is proportional to amount of its line flow. To develop individual user's impact, the line utilization factors of each participant are derived by power flow equations of all nodes (i.e., load-flow equations). To deal With the slack bus problem inherent in the conventional load-flow analysis more practically, a additional power supply/demand balance equation is incorporated. Although the developed allocation rule is basically similar to the existing MW-mile method in the aspect of embedded cost allocation, it does not require to get load flow solutions of each wheeling transaction when multiple transmission transactions are considered.

  • PDF

Variable Ordering Algorithms Using Problem Classifying (문제분류규칙을 이용한 변수 순서화 알고리즘)

  • Sohn, Surg-Won
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.4
    • /
    • pp.127-135
    • /
    • 2011
  • Efficient ordering of decision variables is one of the methods that find solutions quickly in the depth first search using backtracking. At this time, development of variables ordering algorithms considering dynamic and static properties of the problems is very important. However, to exploit optimal variable ordering algorithms appropriate to the problems. In this paper, we propose a problem classifying rule which provides problem type based on variables' properties, and use this rule to predict optimal type of variable ordering algorithms. We choose frequency allocation problem as a DS-type whose decision variables have dynamic and static properties, and estimate optimal variable ordering algorithm. We also show the usefulness of problem classifying rule by applying base station problem as a special case whose problem type is not generated from the presented rule.

The Monthly Water Supply Reliability Indexes in the Parallel Reservoir System

  • Park, Ki-Bum;Kim, Sung-Won;Lee, Yeong-Hwa
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1612-1615
    • /
    • 2009
  • Water supply reliability indexes (WSRI) is estimated for assessment of water supply capacity in the downstream for parallel reservoir system in Nakdong River, South Korea, using allocation rule (AR) according to the water supply capacity of each reservoir and the characteristic of parallel reservoir system. The result of the analyzing parallel reservoir system for Andong and Imha reservoir in Nakdong River does not include evidences available enough to decide whether the results of water supply analysis are excellent in the current reliability evaluation or not. However, AR (C) shows a good result in the water supply capacity for each reservoir based on the connected operation system and the total water supply capacity at the control point of downstream by the average water supply capacity and possible range of water supply capacity suggested by this study. The average water supply capacity is analyzed by the reliability of monthly average water supply capacity. Furthermore, the possible range of water supply capacity is estimated by the standard deviation when water deficit occurs. Therefore, AR (C) is useful to establish and estimate the planning water supply capacity according to the monthly water supply condition and the possible range of water supply capacity when the water supply capacity deficit occurs, South Korea.

  • PDF

A Simulation Based Study on Increasing Production Capacity in a Crankshaft Line Considering Limited Budget and Space (예산과 공간 제약하에서 크랭크샤프트 생산라인의 생산능력 증대를 위한 시뮬레이션 기반의 연구)

  • Wang, Guan;Song, Shou;Shin, Yang Woo;Moon, Dug Hee
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.5
    • /
    • pp.481-491
    • /
    • 2014
  • In this paper, we discussed a problem for improving the throughput of a crankshaft manufacturing line in an automotive factory in which the budget for purchasing new machines and installing additional buffers is limited. We also considered the constraint of available space for both of machine and buffer. Although this problem seems like a kind of buffer allocation problem, it is different from buffer allocation problem because additional machines are also considered. Thus, it is not easy to calculate the throughput by mathematical model, and therefore simulation model was developed using $ARENA^{(R)}$ for estimating throughput. To determine the investment plan, a modified Arrow Assignment Rule under some constraints was suggested and it was applied to the real case.

OPTIMUM ALLOCATION OF PORT LABOR GANGS IN CASE OF MULTIPLE SHIPS (항만하역노동력의 최적배분에 관한 연구 (II) 선박군의 경우)

  • 이철영;우병구
    • Journal of the Korean Institute of Navigation
    • /
    • v.13 no.3
    • /
    • pp.37-44
    • /
    • 1989
  • Recently recognize the labor productivity of port physical distribution system in the port and shipping areas, Much Efforts for evaluating this productivity has been made continuously. BUt still there is little study, so far, on a systematic research for the management of port labor gangs, and even those were mainly depended on a rule of thumb. Especially the object of this study is to introduce the method of optimal allocation and assignment for the labor gangs per pier unit in the multiple ships berthed at an arbitary pier or port. In case the multiple ships have a homogeneous cargoes or do not have sufficient labor gangs to be assigned. The problem of optimal allocation and assignment of the labor gangs to be i) formalized with multi-state decision process in form of difference equation as the pattern which converted the independent multiple ships into a single ship with the intra-multiple ships, and ii) the optimal size of labor gangs could be obtained through the simple mathematical method instead of complicated dynamic programming, and iii) In case of shortage of labor gangs available the evaluation function considering the labor gangs available and total shift times was introduced, and iv) the optimal allocation and assignment of labor gangs was dealt at the point of minimizing the summation of the total shift times and at the point of minimizing the total cost charged for the extra waiting time except PHI time during port times for the multiple ships combinations.

  • PDF

A Part Release considering Status of Tool in FMS (FMS에서 공구 상태를 고려한 부품투입 방법)

  • 이충수;오형술;박경종
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2001.04a
    • /
    • pp.377-380
    • /
    • 2001
  • A recent trend in flexible manufacturing systems(FMS) is to compose of the identical versatile-machines and to use dynamic tool allocation strategy, sharing tools between machines with fast tool delivery system. Unlike a conventional FMS where parts are fed to the machines with the required tools, tools are acquired from other machines using a tool delivery system and parts can be finished on the same machine in these FMS. Therefore it is more important problem to plan tool flow using tool delivery system in these FMS rather than part flow in conventional FMS. According to existing study, in FMS 20~30 percent of the total management cost is the cost related with tools and it is possible to reduce the tool inventory by 40 percent using efficient tool allocation. In this study, in FMS under dynamic tool allocation strategy, a new method of part release considering tool flow at the stage of part release is proposed. In order to prove the efficiency of the proposed part release it is compared with other part release through simulation experiments. Performance measures in these experiments are the throughput and the number of tardy parts.

  • PDF