• Title/Summary/Keyword: Airport Railroad

Search Result 59, Processing Time 0.027 seconds

An Establishment of Emergency Response Scenarios For Railroad Emergency Accident and a way to derive appropriate activities from the train operator (철도비상사고 대비 비상대응 시나리오 설정 및 기관사 행동요령 도출방안 -공항철도 사례-)

  • Shin, Jong-Hyun;Kim, Si-Gon;Kim, Kang-Seob
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2325-2331
    • /
    • 2008
  • This article is about a new law of railroad industry has come into effect in 2004 and that left the railroad company operated under the private system. Accordingly, it has to encounter a variety of managers on the railroad safety part too. Incheon Airport Railroad that was, from Incheon International Airport to Kimpo Airport, opened to traffic on the 23th March, 2007 as the first private railroad company in Korea. This railroad company is working hard to be a safe and convenient airport railroad. There is not operated an effective emergency response that the railroad company and the emergency response personnel without standard operation procedure, recently. The original emergency manual and the emergency procedure of the synthesized railroad safety development business. I am proposing to establish the emergency response scenario according to the different situations that the train operator.

  • PDF

A Study for Vehicle Dynamic Analysis and Test of Airport Railroad (공항철도 차량 동특성 해석 및 시험에 관한 연구)

  • Yang, Hee-Joo;Seong, Jae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.188-193
    • /
    • 2007
  • Airport railroad have required maximum design speed 120km/h and wind speed 50m/s condition as design item of airport railroad vehicles. To design and manufacture the vehicle satisfying these conditions, it must carry out the dynamic behaviors analysis such as hunting stability, ride comfort derailment ratio, unloading ratio and lateral force to meet the criterion described in Urban Railroad Act. Dynamic behaviors of vehicle have carried out using the multi-body dynamics simulation program(VAMPIRE). This paper presents the evaluation methods and criterion used to verify dynamic performance of airport railroad vehicle, and show the analysis results of vehicle dynamic simulation and the test results for vibration and ride comfort measured on running performance tests. As a results, each analysis results and test results meet the criterion described in Urban Railroad Act.

  • PDF

A study on the Multipurpose Usage of Incheon International Airport Railway - Focusing on the Improvement of Connecting Systems - (인천국제공항철도의 다목적 활용방안 - 연계체계 개선을 중심으로)

  • Park Jeong-Soo;Won Jai-Mu;Han Woo-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.6 s.31
    • /
    • pp.610-616
    • /
    • 2005
  • The Incheon International Airport Express(I'Rex) is the railroad that connects Incheon International Airport, Gimpo Airport and Seoul Station. I'Rex is now under construction, and it will be connected to Gimpo Airport by 2007, to Seoul Station by 2010. However, there has been no discussion on how th connect different routes of railway Systems. Therefore it seems likely that rail passenger demand will be lower than that of limousine bus. Therefor, this paper proposes 4 effective connecting methods for I'Rex - (1) Shuttle transport, (2) Short-distance connecting transport (Inside I'Rex, Seoul Subway Line 9, 'Han-River line') (3) Mid-distance connecting transport (Jung-ang, Tae-baek, Young-dong line) (4) Long-distance connecting transport (Korean Train Express (Korean high speed railroad)) These methods can increase the connectivity of I'Rex with existing railroads and the competition power of I'Rex against a highway.

Errors and Causes in Railroad Demand Forecasting (the Incheon International Airport Railroad) (철도수요예측 오차현황 및 원인분석에 관한 연구 (인천국제공항철도 사례를 중심으로))

  • NamKung, Baek-Kyu;Chung, Sung-Bong;Park, Cho-Rong;Lee, Cheol-Ju
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2309-2318
    • /
    • 2010
  • It is a plan the government increases a railroad section SOC investment, and to activate railroad construction while a railroad wins the spotlight with green transportation. But an error of the demand forecast that is a base of a railroad investment evaluation follows in occurring big, there is it with an operation with an obstacle of a railroad investment. Case of the Incheon International Airport Railroad which went into operation recently, While a present transportation demand showed about 10% than a demand forecasted in a past conference, it was magnified in a social problem. A lot of research was gone on in road project about traffic demand forecast and error, a study to find out the error cause is an insufficient situation although errors of a railroad occurs big. So, this study looked for errors and causes about trip generation model and modes sharing model of railroad demand forecast but it was defined causes so that it can occur similar problems in the future. Especially it investigated causes after comparing rate of development plan for the realization and O/D size in trip generation model and after comparing rate of modes sharing of past and current and conducting a survey for airport users. In conclusion, it suggested method to reduce errors of railroad demand forecasting in the future.

  • PDF

The comparison study on the transfer system of the domestic & foreign airport railroad (국내외 공항철도 연계현황 비교연구)

  • Oh, Yoon-Sic;Hong, Cheng-Hi;Shim, Myeong-Gu
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2137-2153
    • /
    • 2010
  • KORAIL airport railroad is the largest private invested project and also the first private tried rail SOC, but which was acquisited into KORAIL on 30. Nov. 2009. Presently, airport train opened on 23. MAR. 2007 as the first phase(Inchon international airport - Kimpo airport, operation distance 37.6km), the 2nd phase(Kimpo airport - Seoul station, operation distacne 20.4km) is expected at the late this year. In this study, I tried to compare domestic & foreign airport train in the perspective of transfer system and searched for the development agendas.

  • PDF

Effective Connecting Methods Between Incheon International Airport Railroad and Existing Railroads (인천국제공항철도와 기존 철도의 효율적인 연계방안)

  • 한우진
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.253-258
    • /
    • 2002
  • The Incheon International Amort Railroad (IIAR) is the railroad that connects Incheon International Airport, Gimpo Airport and Seoul Station. IIAR is now under construction, and it will be finished to Gimpo Amort by 2006, to Seoul Station by 2008. But IIAR is not only so late to start but also has no discussion about effective connecting methods to existing railroads and fine operation plan. Therefore, after IIAR opens, it is possible for IIAR to lose to limousine bus using highway. So, this paper proposes 4 effective connecting methods for IIAR - (1) Shuttle transport, (2) Short-distance connecting transport (Inside IIAR, Seoul Subway Line 9, 'Han-River line') (3) Mid-distance connecting transport (Jung-ang, Tae-baek, Young-dong line) (4) Long-distance connecting transport (Korean Train express (korean high speed railroad)) These methods can increase the connectivity of IIAR with existing railroads and the competition power of IIAR against highway.

  • PDF

The consideration of a input KTX in airport railroad (공항철도 구간 KTX투입 방안 고찰)

  • Kim, Do-Heon;Jung, Byung-Ryul;Rha, Sang-Ju
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1681-1698
    • /
    • 2011
  • According to the demands of the times, Inchon international airport railroad opened up step by step but It is situation that much government subsidies are paid because It does not competitive power with road traffic by decline of schedule speed. Inchon international airport railroad users will convert by other transportation and minimize damage their time as travel time is prolonged. Therefore, need high speedization of airport railroad, this may act big role competitive power security as well as airport railroad activation with another public transportation. Thus, this paper suggests that a high speedization possibility section in the sections of airport railroad and train speed elevation effect analysis by roadbed, railroad, system improvement and the most efficient operation intervals analyzing each vehicles (AREX (120km/h), KTX (230km/h), EMU(Electric Multiple Unit, 180km/h) train running pattern.

  • PDF

Introduction of Safety Activities for Electrical and Mechanical System in Airport Railroad (공항철도의 기전시스템에 대한 안전성 활동 소개)

  • Lim, Sung-Soo;Shin, Seok-Kyun;Lee, Chang-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1088-1096
    • /
    • 2006
  • In this paper, the results of safety activities for Airport Railroad are introduced according to CENELEC standards. The procedures of safety activity were redefined as 6 phases such as Requirement Analysis phase, Design phase, Manufacture phase, Installation phase, Test & Commissioning phase and Operation phase to ensure the coincidence with 14 phases recommended in CENELEC standard. And the safety activities were implemented in the aspect of the overall E&M system level and in the aspect of each system level for 6 sub-systems consisting of that E&M system to ensure the safety for Airport Railroad using the general methodology such as FMECA.

  • PDF

Risk Analysis using Failure Data in Railway E&M System

  • Lee, Chang-Hwan;Song, Mi-Ok;Lim, Sung-Soo
    • International Journal of Railway
    • /
    • v.3 no.1
    • /
    • pp.34-37
    • /
    • 2010
  • In recent, the railway system consists of subsystems as rolling stock and infrastructures as signaling, telecommunication, power supply, overhead contact and platform screen door, etc. Furthermore, each subsystem has complicated interface so as not to understand these relationship. Consequently, to operate the railway system continuously with required safety and availability, the failure data should be corrected and analyzed systematically during operation. To achieve this object effectively, this paper presents the method which is evaluating the operational risk quantitatively using failure data, and selecting the critical equipment. Following this analysis, the improvement plan is established and applied to reduce the operational risk on system or equipment. From this study, the critical equipments of system could be determined and prioritized by risk analysis. Also, the effective maintenance to prevent critical failure could be implanted by this suggested methodology.

  • PDF

Study on Interior Environment Design of Incheon International Airport Railroad Station in a Way of Environment Recognition Approach (환경 인지적 접근에 의한 인천국제 공항철도 역사시설 환경설계에 관한 연구)

  • 오인욱
    • Korean Institute of Interior Design Journal
    • /
    • no.39
    • /
    • pp.116-123
    • /
    • 2003
  • The purpose of this study is to demonstrate the relationship between the results of the analysis of the overseas railroad station buildings, which was conducted using the factors of environmental cognition for the purpose of designing an interior environment for the Incheon International Airport Railroad station that will be newly constructed, and the plan that could be applied to the design of interior environment for the airport railroad station. The station with a complex interior space layout and relatively larger space tends to be difficult to predict or forecast passenger's needs or recognition element in approaching stage of intoner environment design since the human's biological memory system is greatly affected by such factors. Cognitive approach at empirical standpoint would possibly create the design, of which elements will Implement the functions of their own as such approach enables necessary information to be structured in a systematical way and manner In implementing interior environment design for such stations to be built for the first time in Korea, behavioral approach based on systematic theory proved to be very crucial. Under such a background, the study was aimed at extracting the assessment elements for interior environment design, then setting the frame of cognitive approach to eventually propose the guideline in approaching to interior environment design.