• Title/Summary/Keyword: Air Supply System

Search Result 881, Processing Time 0.045 seconds

Development of a One-dimensional Numerical Model of the Electrically Heated Three-Way Catalyst For Start-up Heating in a 48-V Gasoline Hybrid Vehicle (48-볼트 가솔린 하이브리드 차량 초기 시동 시 배기 정화 성능 분석을 위한 1차원 전기 히터 촉매 해석 모델 개발)

  • Seongsu Kim ;Junghwan Kim
    • Journal of ILASS-Korea
    • /
    • v.28 no.3
    • /
    • pp.150-155
    • /
    • 2023
  • Cold-start emissions are given great importance under the Euro-7 emission standard due to their significant impact on overall vehicle emissions. When an engine is started from a cold state, the combustion process is not yet optimized, leading to higher emissions. Hybrid vehicles, in particular, may face additional challenges, as their engine may remain inactive for extended periods, causing their catalysts to cool down and potentially become less effective in reducing emissions. In the present study, the performance of an electric heater was investigated as a means to enhance the catalyst heating during the start-up time. A simulation tool was utilized to develop a model for the gasoline exhaust aftertreatment system. The result indicates that the heater was able to increase the three-way catalyst temperature to 500℃ in 4 s using 20 kW power. In addition, the implementation of a secondary air supply resulted in reduced temperature overshoot and improved conversion efficiencies.

Parameter Estimation of the Aerated Wetland for the Performance of the Polluted Stream Treatment (오염하천 정화를 위한 호기성 인공습지의 운영인자 평가)

  • Kim, Dul-Sun;Lee, Dong-Keun
    • Clean Technology
    • /
    • v.25 no.4
    • /
    • pp.302-310
    • /
    • 2019
  • A constructed wetland with the aerobic tank and anaerobic/anoxic tank connected in series was employed in order to treat highly polluted stream water. The aerobic tank was maintained aerobic with a continuous supply of air through the natural air draft system. Five pilot plants having different residence times were employed together to obtain parameters for the best performances of the wetland. BOD and COD removals at the aerobic tank followed the first order kinetics. COD removal rate constants were slightly lower than BOD. The temperature dependence of COD (θ = 1.0079) and BOD (θ = 1.0083) was almost the same, but the temperature dependence (θN) of T-N removal was 1.0189. The SS removal rate was as high as 98% and the removal efficiency showed a tendency to increase with increasing hydraulic loading rate (Q/A). The main mechanism of BOD and COD removal at the anaerobic/anoxic tank was entirely different from that of the aerobic tank. BOD and COD were supplied as the carbon source for biological denitrification. T-P was believed to be removed though the cation exchange between orthophosphate and gravels within the anaerobic and anoxic tanks. The wetland could successfully be operated without being blocked by the filtered solid which subsequently decomposed at an extremely fast rate.

Oxy Combustion Characteristics of Anthracite in a 100 kWth Circulating Fluidized Bed System (100 kWth 급 순환유동층 시스템에서 무연탄 순산소연소 특성 연구)

  • Moon, Ji-Hong;Jo, Sung-Ho;Mun, Tae-Young;Park, Sung-Jin;Kim, Jae-Young;Nguyen, Hoang Khoi;Lee, Jae-Goo
    • Korean Chemical Engineering Research
    • /
    • v.57 no.3
    • /
    • pp.400-407
    • /
    • 2019
  • Oxy-combustion with a circulating fluidized bed (Oxy-CFBC) technology has been paid attention to cope with the climate change and fuel supply problem. In addition, Oxy-CFBC technology as one of the methods for carbon dioxide capture is an eco-friendly that can reduce air pollutants, such as $SO_2$, NO and CO through a flue gas recirculation process. The newly developed $100kW_{th}$ pilot-scale Oxy-CFBC system used for this research has been continuously utilizing to investigate oxy-combustion characteristics for various fuels, coals and biomasses to verify the possibility of fuel diversification. The anthracite is known as a low reactivity fuel due to a lot of fixed carbon and ash. Therefore, this study aims not only to improve combustion efficiency of an anthracite, but also to capture carbon dioxide. As a result, compared to air-combustion of sub-bituminous coal, oxy-combustion of anthracite could improve 2% combustion efficiency and emissions of $SO_2$, CO and NO were reduced 15%, 60% and 99%, respectively. In addition, stable operating of Oxy-CFBC could capture above 94 vol.% $CO_2$.

A Study on the Consciousness of the Environment Pollution Problem in Pohang City (환경문제에 관한 시민의식 조사 - 통합후 포항시민을 대상으로 -)

  • Ha, Yeong-Gil;Park, Kyung-Min;Kwon, Young-Sook
    • Journal of agricultural medicine and community health
    • /
    • v.21 no.1
    • /
    • pp.61-73
    • /
    • 1996
  • This study conducted to determine the attitude on environment pollution by Pohang city citizens. 1,059 Pohang city citizens in the age group 20 and over were chosen and surveyed by officials's interview at Up, Myun and Dong during the period 6 September to 20 September 1995. The issue problems to be solved in Pohang city were traffic control 47.3%, environment pollution 22.7%, cultural institutions 11.6%, water service 9.9%, education system 5.1% and community security 2.1%. The 55.1% of subjects responded that responsibility for environment pollution is every citizens duty. The trash from houses were 'garbage'(48.1%), 'waste of life'(21.8%), 'reuse trash'(15.6%) and 'one use thing'(14.5%) in order. The 66.9% of subjects responded that the trash's standard envelopes can be easily tear and its texture is not good. The respondents sometimes or often had experienced foreign bodies, sediment in the water service supply. The 45.9% of the respondents use natural water as drinking water, and the water service supply(26.7%), underground water(17.0%) and buying water(9.3%) were followed. Pertaining to the air pollution(by percent) was pollution of the steel industry complex 78.0%, combustive gas 16.6% and construction dust 1.7%. The respondents at southern district complained of respiratory tract by air pollution and the respondents at northern district complained of the visual disturbance and the offensive odor(P<0.05). Water pollution problem is factory's wastewater 56.2%, home wastewater 36.4% and livestock's wastewater 5.6% in order. The respondents at southern district complained of the noise pollution by airplanes and factories at the afternoon and the respondents at northern district complained of the noise pollution by vehicles(P<0.05).

  • PDF

The Effect of the Performance of Firefighting Construction Supervision Personnel on the Completion Inspection of Firefighting Facility Construction in Apartments (소방공사감리원의 업무수행능력이 아파트 소방시설공사의 완공검사에 미치는 영향)

  • Kim, Sang-Sig;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.43-54
    • /
    • 2019
  • In this study, results of completion inspection are investigated according to the performance of the firefighting construction supervision personnel and according to the necessity of clean air supply in a performance test of the firefighting construction supervision personnel. The results of the completion inspection are measured and the causes of defects in the fire protection facilities after issuance of a completion inspection certificate are analyzed. The findings of this investigation can be used to minimize the risk of apartment fires and improve the performance of firefighting construction supervision personnel. The results of this study are summarized as follows. First, the results of the completion inspection conducted by the firefighting construction supervision personnel varies according to particular occupation. The performance of fire facility supervisors from design companies and fire construction companies were significantly higher than the fire officers. Therefore, it is necessary to employ supervisors who have experience in supervising the construction of apartments, in order to improve the performance of fire construction supervision officers. Second, the analysis of the completion inspection results according to the necessity of a clean air supply for performance tests of firefighting construction supervision personnel showed that the necessity of a clean air supply was significantly higher for fire facility supervisors from design companies and fire construction companies than for the fire officers. In order to improve, the completion inspection should be carried out up until the completion date of the building. In addition, a system needs to be established to ensure that clients are not able to demand that a completion inspection certificate be issued on the construction completion date. Finally, it is found that defects of completion inspection after issuance of a completion inspection certificate affects the result of the completion inspection. The results of the completion inspections conducted by the fire facility supervisors from design companies and fire construction companies were affected significantly less by defects than that of the general contractors. Research shows that faults have occured in firefighting facilities after the issuance of a completion inspection certificate due to the client and the construction company demanding the issuance of the completion inspection certificate.

Performance test and factor analysis on the performance of shutoff units with the research reactor (연구용 원자로의 정지봉 장치 성능에 미치는 인자 분석과 성능 시험)

  • Kim, Kyoung-Rean;Kim, Seoug-Beom;Ko, Jae-Myoung;Moon, Gyoon-Young;Park, Jong-Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.10 no.2 s.41
    • /
    • pp.41-45
    • /
    • 2007
  • The shutoff unit was designed to provide rapid insertion of neutron absorbing material into the reactor core to shutdown the reactor quickly and also to withdraw the absorber slowly to avoid a log-rate trip. Four shutoff units were installed on the HANARO reactor but the half-core test facility was equipped with one shutoff unit. The reactor trip or shutdown is accomplished by four shutoff units by insertion of the shutoff rods. The shutoff rod(SOR) is actuated by a directly linked hydraulic cylinder on the reactor chimney, which is pressurized by a hydraulic pump. The rod is released to drop by gravity, when triplicate solenoid valves are de-energized to vent the cylinder. The hydraulic pump, pipe and air supply system are provided to be similar with the HANARO reactor. The shutoff rod drops for 647mm stroke within 1.13 seconds to shut down the reactor and it is slowly inserted to the full down position, 700mm, with a damping. We have conducted the drop test of the shutoff rod in order to show the performance and the structural integrity of operating system of the shutoff unit. The present paper deals with the 647mm drop time and the withdrawal time according to variation of the pool water temperature, the water level and the core flow.

Characteristic Analysis of Hybrid Desiccant Cooling System for District Heating in Residential Environment (지역난방에 연계된 하이브리드 제습냉방시스템의 주거환경에서의 성능 분석)

  • Ahn, Joon;Kim, Jaeyool;Kang, Byung Ha
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.38 no.7
    • /
    • pp.571-579
    • /
    • 2014
  • A series of field tests on hybrid desiccant cooling systems were conducted in July-August, 2013. The temperature and humidity of the supply and return air, power, and heat consumption were monitored and transferred in real time through the Internet. The performance parameters of the cooling system, namely, cooling capacity and COP (coefficient of performance), were evaluated from the measured data and their variations under outdoor conditions was analyzed. It was found that with increase in the outdoor temperature, the total energy decreases and cooling capacity increases whereas the latter decreases with increase in the outdoor humidity. The COP was also found to increase with the increase in outdoor temperature.

Assessment on Economies-Environmental Affect of Smart Operation System(SOS) in Sewage Treatment Plant (실증규모 하수처리장에 적용된 스마트 운영시스템의 경제-환경적 기여도 평가)

  • Kim, Younkwon;Seo, InSeok;Kim, Hongsuck;Kim, Jiyeon
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.6
    • /
    • pp.581-589
    • /
    • 2013
  • Generally, Sewage Treatment Plants(STPs) are complexes systems in which a range of physical, chemical and biological processes occur. However, their performance strongly depends on the know-how acquired by the field-engineer. Recently, in order to solve this situations, various operation and management technologies based on the Instrumentation, Control and Automation(ICA) have been developed. As a economies-environmental affect point of view, this study was for the performance evaluation and assessment of results from the Smart Operation System(SOS) in full-scale STP. The SOS in STP consisted of the process monitoring module, including real-time influent prediction and effluent simulation, and the Smart Air Control(SAC) module. According to the results from field test for 2 years, the results of economical evaluation, amount of benefits and cost saving by the SOS have shown to be much higher than that of traditional operation. Nevertheless, the removal load(kg/yr) of BOD 13.3 %, COD 28.2 %, TN 44.4 % and TP 20.8 % were increased, respectively. Remarkable improvement of removal load could be achieved after the SOS was adapted. It was concerned that the SOS offer a user friendly functionalities and cost saving needed by the field-engineers. In addition, it was expected that the results of this study would supply helpful information for design and cost saving for the SOS in full-scale STP.

Establishment of Fatigue Life Evaluation and Management System for District Beating Pipes Considering Operating Temperature Transition Data (운전이력을 고려한 지역난방 열배관의 피로수명 평가 및 관리 체계 구축)

  • Chang Yoon-Suk;Jung Sung-Wook;Kim Hyeong-Keun;Choi Jae-Boong;Kim Sang-Ho;Kim Youn-Hong;Kim Young-Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.29 no.9 s.240
    • /
    • pp.1235-1242
    • /
    • 2005
  • A district heating(DH) system supplies environmentally-friend heat and is appropriate for reduction of energy consumption and/or air pollutions. The DH transmission pipe, composed of supply and return pipes, has been used to transmit the heat and prevent heat loss during transportation. The two types of pipes are operated at a temperature of $75\~115^{\circ}C\;and\;40\~65^{\circ}C$, respectively, with an operating pressure of less than 1.568MPa. The objectives of this paper are to systematize data processing of transition temperature and investigate its effects on fatigue life of DH pipes. For the sake of this, about 5 millions temperature data were measured during one year at ten locations, and then available fatigue lift estimation schemes were examined and applied to quantify the specific thermal fatigue life of each pipe. As a result, a relational database management system as well as reliable fatigue lift evaluation procedures is established for Korean DH pipes. Also, since the prototypal evaluation results satisfied both cycle-based and stress-based fatigue criteria, those can be used as useful information in the future fer optimal design, operation and energy saving via setting of efficient condition and stabilization of water temperature.

A Study on a Method of Making the Matrix far the Numerical Analysis of Underground Temperature (지하공간온도의 수치해석을 위한 행렬 구성방법에 관한 연구)

  • 정수일
    • Tunnel and Underground Space
    • /
    • v.11 no.1
    • /
    • pp.36-41
    • /
    • 2001
  • It is often said that the supply of fossil fuels in use for energy source will last only for 40 years. Futhermore, statistics shows that most of the fuels are imported from outside and that 30-40% of total cost for housing in Korea. One of those methods for reducing the energy cost for housing is to use underground space. Being used well, it may bring a considerable saving of energy since the underground space keeps its air cool in summer and warm in winter. To use underground space, we need to analyse its temperature first. For this purpose, what is generally used is the numerical analysis with the use of nodal system. That is, we can calculate a specific underground temperature with the matrix of thermal resistance after we make a nodal system. However, the existing numerical analysis programs need usually high cost and require a computer with large capacity. So they are seldom used in practice. Considering such problems, this study seeks to find a method for making the matrix of thermal resistance operatable on PC level.

  • PDF