Behavior Analysis of Earth Retaining Walls on the Excavation for Contact Structure (인접 구조물의 터파기로 인한 흙막이 벽체의 거동 분석)

  • Kim, Young-Muk;Jung, Young-Soo;Hong, Chang-Pyo;Shin, Youn-Sub
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1496-1503
    • /
    • 2005
  • The study on the lateral earth pressure is briskly preformed for various conditions such as type of retaining walls, ground condition, and type of supporting systems. It is not simple to determine the distribution of lateral earth pressure accurately, however, because the lateral earth pressure is affected by various factors. This study is performed to analyze the behavior of earth retaining walls for new excavation contacting with existing excavation by comparing with the site measuring values before and after new excavation. On the base of observation, the distribution of strut axial forces is similar to that of ganeral earth retaining walls, but strut axial forces is increased by removal of existing earth anchors. When new excavation is performed contacting with existing excavation, the axial force of strut is decreased because of soil exclusion in the behind walls, but that force is increased after new exeavation. The analysis result show that the installation of strut in middle part makes a effect to not only 1 adjacent strut, but 3-5 adjacent struts. Also during new excavation strut axial forces is decreased by relaxation of total earth retaining wall system.

  • PDF

Numerical Analysis of Retaining Wall Considering Supporting Load of Adjacent Retaining Wall (인접 흙막이 구조물의 지보재 하중을 고려한 가시설의 수치해석)

  • Yoo, Chanho;You, Jaemin;Lee, Seungjoo;Hwang, Jungsoon;Baek, Seungcheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.1
    • /
    • pp.31-36
    • /
    • 2018
  • Recently, as the building construction works have been activated, the environment in which the excavation work is proceeding in parallel with the existing structure and the adjacent excavation work is increasing. However, there is not a lot of research on this. In this study, numerical analysis was carried out for interaction analysis between former excavation construction and follow-up excavation on two excavation retaining structures in parallel with excavation. As a result of numerical analysis, if the supporting load of strut is not considered, it was analyzed that the displacement distribution in the structure can be underestimated and acting stress of strut is overestimated. It was analyzed that the support stress causes by the former excavation should be considered in order to simulate the actual behavior characteristic.

A Study on Track Deformation Characteristics of Turnout System by Adjacent Excavation Work on Urban Transit (인접굴착공사에 따른 도시철도 분기기 궤도의 변형 특성에 관한 연구)

  • Kim, Hae-Sung;Choi, Jung-Youl;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.5
    • /
    • pp.477-482
    • /
    • 2022
  • The structure of the turnout track is very complex, so it is a facility that is more difficult to maintain and requires detailed management than a general track type. The purpose of this study is to analyze the effect on the deformation of the turnout system of the ground section due to the excavation work adjacent to the serviced urban railways. In this study, based on finite element analysis for each stage of adjacent excavation, the track deformation for each major location of turnout system was analyzed in consideration of the layout of the turnout system installed on the ground section, and the safety and stability was confirmed by comparing it with the track irregularity regulation. As a result of the study, it was found that the major construction stage affecting the track deformation of the turnout system on the ground section was the final stage of excavation. In addition, although the vertical displacement which is a vertical irregularity occurred relatively large, it was analyzed that the horizontal deformation was dominant overall, because of the excavation site is located on the side of the turnout system. In addition, it was analyzed that the amount of displacement at each major location of the turnout system is different, and there is a possibility that there may be a twist irregularity due to the deviation of the track deformation for each location according to the distance from the excavation site. Therefore, it was analyzed that it is necessary to classify and manage the importance of the track deformation of the turnout system of actual operating line, including additional displacement due to adjacent excavation, based on the track irregularity that has occurred at each location where the major deformation characteristics occur.

Experimental investigation of earth pressure on retaining wall and ground settlement subjected to tunneling in confined space

  • Jinyuan Wang;Wenjun Li;Rui Rui;Yuxin Zhai;Qing He
    • Geomechanics and Engineering
    • /
    • v.32 no.2
    • /
    • pp.179-191
    • /
    • 2023
  • To study the influences of tunneling on the earth pressure and ground settlement when the tunnel passes through the adjacent underground retaining structure, 30 two-dimensional model tests were carried out taking into account the ratios of tunnel excavation depth (H) to lateral width (w), excavation width (B), and excavation distance using a custom-made test device and an analogical soil. Tunnel crossing adjacent existing retaining structure (TCE) and tunnel crossing adjacent newly-built retaining structure (TCN) were simulated and the earth pressure variations and ground settlement distribution during excavation were analyzed. For TCE condition, the earth pressure increments, maximum ground settlement and the curvature of the ground settlement curve are negatively related to H/B, but positively related to H/s and H/w. For TCN condition, most trends are consistent with TCE except that the earth pressure increments and the curvature of ground settlement curve are negatively related to H/w. The maximum ground settlement is larger than that observed in tunnel crossing the existing underground structure. This study provides an assessment basis for the design and construction under confined space conditions.

Analysis of Peripheral Surface Settlement during Subway Excavation (지하철 굴착공사에 따른 인접지반의 침하 해석)

  • 문준석;권강오;김홍석;장연수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.621-628
    • /
    • 2000
  • In this study, the influence of groundwater variation and surface settlement adjacent to the excavation site of subway station on $\bigcirc$$\bigcirc$ Gas station and the $\bigcirc$$\bigcirc$ building is analized. Measurement data of surface settlement, horizontal deformation and groundwater level are used to verify the results of Caspe analytical method and FLAC numerical analysis. Variation of groundwater level adjacent to the excavation site is modelled by the 3-D groundwater flow program, MODFLOW. The results of both the analytical method and the numerical method were quite close to the measurement data of surface settlement.

  • PDF

BRACED EXCAVATION NEAR THE EXISTING STRUCTURES

  • Maruoka, Masao
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1990.10a
    • /
    • pp.129-144
    • /
    • 1990
  • This paper is an introduction of measured samples of a peripheral ground displacement resulting from excavation work, and the work carried out to minimize the displacement of the earth retaining wall and the adjacent structures.

  • PDF

SOME PROBLEMS AND REMEDIAL MEASARES OF BRACED EXCAVATION IN URBAN AREAS (도심지 지하굴착의 문제점과 개선방향)

  • 김학문
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1994.09a
    • /
    • pp.158-168
    • /
    • 1994
  • This report describes aspects of recent braced excavation constructed in built up areas where adjacent buildings or underground utilities are likely to be subjected to settlement and damages. Trends and choice of earth retaining structures for deep excavation are present, and some desigen and construction techniques are introduced in order to minimise possible adverse effects to the urban environment. Some problems in design and construction of braced excavation in urban area are closely examined and remedial measrures are proposed.

  • PDF

Investigation of three-dimensional deformation mechanisms of box culvert due to adjacent deep basement excavation in clays

  • Bu, Fanmin;Yu, Wenrui;Chen, Li;Wu, Erlu
    • Geomechanics and Engineering
    • /
    • v.30 no.6
    • /
    • pp.565-577
    • /
    • 2022
  • In this study, a series of three-dimensional numerical parametric study was conducted to investigate deformation mechanisms of an existing box culvert due to an adjacent multi-propped basement excavation in clays. Field measurements from an excavation case history are first used to calibrate a baseline Hardening Soil Small Strain (HS-small) model, which is subsequently adopted for parametric study. Results indicate that the basement-box culvert interaction along the basement centerline can be considered as a plane strain condition when the length of excavation (L) reaches 14 He (i.e., final excavation depth). If a plane strain condition (i.e., L/He=12.0) is assumed for analyzing the basement-box culvert interaction of a short excavation (i.e., L/He=2.0), the maximum settlement and horizontal movement of the box culvert are overestimated significantly by up to 15.7 and 5.1 times, respectively. It is also found that the deformation of box culvert can be greatly affected by the basement excavation if the distance between the box culvert and retaining wall is less than 1.5 He. The induced deformation in the box culvert can be dramatically reduced by improving the ground inside the excavation or implementing other precautionary measures. For example, by adding jet grouting columns within the basement and installing an isolation wall behind the retaining structures, the maximum settlements of box culvert are shown to reduce by 37.2% and 13.4%, respectively.

Analysis of Perimetrical Ground Settlement Behavior for Deep Excavations in Urban Areas (도심지 깊은 굴착으로 발생하는 인접 지반 지표침하 분석)

  • 양구승;김명모
    • Geotechnical Engineering
    • /
    • v.13 no.2
    • /
    • pp.101-124
    • /
    • 1997
  • Adjacent ground surface settlements by deep excavations are analyzed by field observations in the areas where excavations are performed in sandy soils or weathered soils underlain by rocks, First, the magnitude and the distribution of ground surface settlements, which are developed before main excavation activities (e. g., diaphragm wall installation and center pile installation) , are measured and analyzed. Secondly, the magnitude and the distribution of ground surface settlements by main excavation are measured and analyzed. And the results are compared with the predictions obtained by the empirical methods. Through case studies performed on the excavation sites where adjacent ground surfaces or structures are damaged by excavation activities, upper limit location of ground surface cracks are investigated.

  • PDF

Prediction and Field Measurement on Behaviour of Soft Clay during Deep Excavation (연약점성토지반에서의 깊은굴착에 따른 지반거동의 예측과 현장계측)

  • 정성교;조기영;정은용
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.5
    • /
    • pp.111-124
    • /
    • 1999
  • When deep excavation adjacent to an existing structure is performed, it is very important to minimize damage on the structure through the prediction of ground movement. In this paper, finite element analysis was performed to predict the ground movement, based on the data from site investigation and laboratory tests, when deep excavation close to a buried water tank was carried out in soft clay ground. The movement and stabilities of the soil-cement wall(SCW) and the adjacent structure were checked using the results of the analysis and the field measurement. The comparison between the measured and the predicted ground movements showed the significance of the excavation procedure and lowering of water level in the analytical model. In the future, it is needed to improve the prediction method for better estimation of the ground movement.