• Title/Summary/Keyword: Actual Unit Cost

Search Result 116, Processing Time 0.026 seconds

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro-Power Plants (터널식 소수력 발전소의 최적 설계유량에 관한 연구)

  • 이철형;박완순
    • Water for future
    • /
    • v.24 no.1
    • /
    • pp.63-71
    • /
    • 1991
  • This study represents the methodology for feasibility analysis of small hydro power plants. Cumulative density function of Weibull distribution and Thi-essen method were adopted to beside flow duration curve at candidate sites. The performance prediction model and construction cost estimation model for tunnel-type small hydro power plants were developed. Eight candidate sites existing on Han river selected and surveyed for actual sites reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrates with the lowest unit generation cost for tunnel-type small hydro power plants were the flowrate concerning with between 20 % and 30 % of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual average load factor, annual electricity production were estimated and discussed for surveyed sites.

  • PDF

AMI System Using Smart Electricity Meter Embedded with Home Concentrate Unit (세대집중화장치를 포함하는 스마트 전력량계를 이용한 AMI 시스템)

  • Park, Jae-Sam
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.14 no.3
    • /
    • pp.537-546
    • /
    • 2019
  • In this paper, a system that integrates a home concentrate unit(HCU) in a smart electricity meter to collects water, gas, hot water, and heating usage required for AMI has been proposed. The collected data could be transmitted to the in house display(IHD) and server to provide a more economical AMI system. The developed system is less expensive in the network configuration than the existing system, which could reduce the operating cost, and be easy to install. By applying the developed system, the usage of electricity, water, gas, hot water and heating could be measured and these make it easier to apply AMI system. The main contents of the development are the smart electricity meter and embedding of HCU into the smart electricity meter, and transferring these data to IHD and server to structure the AMI system. The each developed unit has been networked to structure the AMI system to perform the actual meter reading operation and show the result.

The Development Of Program Based On Model to Control Generator Output in Power Plant (모델 기반의 화력발전소 발전기 출력 제어 프로그램 개발)

  • Lim, Geon-Pyo;Kim, Mun-Soo;Choi, In-Kyu;Park, Doo-Yong;Kim, Ho-Yol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.3
    • /
    • pp.614-622
    • /
    • 2010
  • The goal of this paper is to develope the control program based on model which can be applied to 1000MW class coal fired thermal power plant. 1000MW class power plant has the higher efficiency and lower cost because the steam conditions of the ultra super-critical process are higher than them of the previous power plants in temperature and pressure. The program includes the state variable controls which have the desired characteristics for the higher temperature and pressure. The program had been developed successfully using advanced process control. The simulation results using the new control program showed the better performance and safer control than them of the previous control program and we could verify the application possibility of the new program for the actual power plant through the load test, comparison, analysis and tuning.

Comparative Analysis of Evaluation Items in Green Building Certification Case of Apartment Housing (공동주택 친환경건축물인증 사례를 통한 평가항목 비교분석)

  • Kim, Shin-Eun;Lee, Dong-Hoon;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.10 no.2
    • /
    • pp.31-38
    • /
    • 2010
  • The government has enforced the Green Building Certification System since 2002 to resolve environmental pollution from building construction projects. The Green Building Certification System offers additional financial incentive worth 3% of basic apartment unit construction cost for apartment housing projects that have passed preliminary certification and has been revitalized drastically since 2006. However, after the system was put in place, comparative analysis of each item in certification criteria has not been performed yet in reference to actual certification cases. This paper aims to provide a comparative analysis of such evaluation items by studying green building certification cases involving apartment housing. Conclusions drawn herein are expected to provide a framework of continued advancement for the certification system subsequently.

Development of Historical Data Selection Model Using Non-parametric test in Public Sector - focused on Reinforced Concrete Works of Multi-housing Projects - (비모수 검정기반 공공부문 실적단가 선정모델 개발 -공동주택 철근콘크리트 공종을 중심으로-)

  • Lee, Hyun-Ki;Jeon, Jae-Yong;Park, Sung-Chul;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.87-95
    • /
    • 2008
  • The government wants to apply the construction cost estimating method based on historical data published in the first six months of 2004. Construction companies, however, require the proposed cost estimation model, to be improved which makes it difficult to predict a reasonable construction costs. This paper presents an improved historical data selection model after analyzing the problem of previous method throughout comparing contracted unit prices of reinforced concrete works selected by the previous model to market prices. The model which can select more feasible data would assist participates such as general contractors and sub-contractors to earn a proper profits.

Estimating Optimal Harvesting Production of Yellow Croaker Caught by Multiple Fisheries Using Hamiltonian Method (해밀토니안기법을 이용한 복수어업의 참조기 최적어획량 추정)

  • Nam, Jong-Oh;Sim, Seong-Hyun;Kwon, Oh-Min
    • The Journal of Fisheries Business Administration
    • /
    • v.46 no.2
    • /
    • pp.59-74
    • /
    • 2015
  • This study aims to estimate optimal harvesting production, fishing efforts, and stock levels of yellow croaker caught by the offshore Stow Net and the offshore Gill Net fisheries using the current value Hamiltonian method and the surplus production model. As analyzing processes, firstly, this study uses the Gavaris general linear model to estimate standardized fishing efforts of yellow croaker caught by the above multiple fisheries. Secondly, this study applies the Clarke Yoshimoto Pooley(CY&P) model among the various exponential growth models to estimate intrinsic growth rate(r), environmental carrying capacity(K), and catchability coefficient(q) of yellow croaker which inhabits in offshore area of Korea. Thirdly, the study determines optimal harvesting production, fishing efforts, and stock levels of yellow croaker using the current value Hamiltonian method which is including average landing price of yellow croaker, average unit cost of fishing efforts, and social discount rate based on standard of the Korean Development Institute. Finally, this study tries sensitivity analysis to understand changes in optimal harvesting production, fishing efforts, and stock levels of yellow croaker caused by changes in economic and biological parameters. As results drawn by the current value Hamiltonian model, the optimal harvesting production, fishing efforts, and stock levels of yellow croaker caught by the multiple fisheries were estimated as 19,173 ton, 101,644 horse power, and 146,144 ton respectively. In addition, as results of sensitivity analysis, firstly, if the social discount rate and the average landing price of yellow croaker continuously increase, the optimal harvesting production of yellow croaker increases at decreasing rate and then finally slightly decreases due to decreases in stock levels of yellow croaker. Secondly, if the average unit cost of fishing efforts continuously increases, the optimal fishing efforts of the multiple fisheries decreases, but the optimal stock level of yellow croaker increases. The optimal harvest starts climbing and then continuously decreases due to increases in the average unit cost. Thirdly, when the intrinsic growth rate of yellow croaker increases, the optimal harvest, fishing efforts, and stock level all continuously increase. In conclusion, this study suggests that the optimal harvesting production and fishing efforts were much less than actual harvesting production(35,279 ton) and estimated standardized fishing efforts(175,512 horse power) in 2013. This result implies that yellow croaker has been overfished due to excessive fishing efforts. Efficient management and conservative policy on stock of yellow croaker need to be urgently implemented.

Multi-Secondary Transformer: A Modeling Technique for Simulation - II

  • Patel, A.;Singh, N.P.;Gupta, L.N.;Raval, B.;Oza, K.;Thakar, A.;Parmar, D.;Dhola, H.;Dave, R.;Gupta, V.;Gajjar, S.;Patel, P.J.;Baruah, U.K.
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.3 no.1
    • /
    • pp.78-82
    • /
    • 2014
  • Power Transformers with more than one secondary winding are not uncommon in industrial applications. But new classes of applications where very large number of independent secondaries are used are becoming popular in controlled converters for medium and high voltage applications. Cascade H-bridge medium voltage drives and Pulse Step Modulation (PSM) based high voltage power supplies are such applications. Regulated high voltage power supplies (Fig. 1) with 35-100 kV, 5-10 MW output range with very fast dynamics (${\mu}S$ order) uses such transformers. Such power supplies are widely used in fusion research. Here series connection of isolated voltage sources with conventional switching semiconductor devices is achieved by large number of separate transformers or by single unit of multi-secondary transformer. Naturally, a transformer having numbers of secondary windings (~40) on single core is the preferred solution due to space and cost considerations. For design and simulation analysis of such a power supply, the model of a multi-secondary transformer poses special problem to any circuit analysis software as many simulation softwares provide transformer models with limited number (3-6) of secondary windings. Multi-Secondary transformer models with 3 different schemes are available. A comparison of test results from a practical Multi-secondary transformer with a simulation model using magnetic component is found to describe the behavior closer to observed test results. Earlier models assumed magnetising inductance in a linear loss less core model although in actual it is saturable core made-up of CRGO steel laminations. This article discusses a more detailed representation of flux coupled magnetic model with saturable core properties to simulate actual transformers very close to its observed parameters in test and actual usage.

Development of Nursing Activity Cost Calculation Program Using Time-Driven Activity-Based Costing (TD-ABC) (병동 간호활동 원가계산 프로그램 개발 :시간동인 활동기준원가계산 기반으로)

  • Lim, Ji Young;Kang, Sung Bae;Lee, Hyun Hee
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.4
    • /
    • pp.480-494
    • /
    • 2018
  • The purpose of this study is to develop a nursing activity cost calculation program based on Lee's doctoral dissertation using TD-ABC. The developed program has been supplemented with data storage, print out, and graph conversion functions to expand the application possibility. The development of the program consisted of three steps: program requirements analysis, program design and development, and program validation. This program was designed not only to do the cost calculation, but also to compare the cost-effectiveness and cost consumption trends. Consequently, this program is meaningful in that the nursing manager can obtain the cost information necessary for nursing unit management and extend the utilization so that the cost management strategy can be established based on the cost information. Therefore, we propose that the cost-management capacity of clinical nurses should be strengthened and the nursing performance measurement research should be expanded by applying it to various actual clinical nursing management settings. It is suggested that this program should be used as a training medium to strengthen nurse cost management capacity by combining nursing management curriculum at undergraduate level.

A Study on the Status of Contract Managed Hospital Food Services (병원급식 위탁관리의 운영 실태조사)

  • Kim, Jin-Su;Yang, Il-Seon;Kim, Hyeon-A;Park, Mun-Gyeong;Park, Su-Yeon
    • Journal of the Korean Dietetic Association
    • /
    • v.9 no.2
    • /
    • pp.128-137
    • /
    • 2003
  • The purposes of this study were to investigate the current status of contracted hospital food services and to find out the difference in accordance with the number of beds in hospitals. Thirty six hospitals having more than 100beds in Seoul, Inchon and Kyungkido were the subjects of this study. Data was collected through surveys. The survey was conducted during March and April in 2002. The Questionnaires were mailed to the 36 directors of dietetic departments of the hospitals and 36 managers of contracting patient food services. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis and t-test. The results of the study are summerized as follows; Ⅰ. Hospital perspective : The range covered by contract food service was 63.3% and 36.7% in hospital food services, and medical nutrition services. The patient and employee food services were in 83.3%, and patient food services were in 6.7%. The methods selecting contractors are general, limited, selected and competitive biddings, and private contracts. The responsibility for supervision of contract food services was the dietetic department (51.7%) in most cases. Hospitals having personnel responsible for contracting affairs were in 75.9% of the cases and 24.1% did not have personnel. The biggest reason for contracting was facilitation of personnel management. The most important criteria on selecting food services contractors was the professionality of the contractor. Ⅱ. Contractor's perspective : The cost per meal in the year 2001 was composed of 1,905 won for food cost, 1,081 won for labor cost, 222 won for expenses, 114 won for VAT, 14 won for rent and 146 won for miscellaneous or controllable expense, representing 109 won loss per meal. The profit-and-loss contract cost is higher than the fee-contract cost. The ratios of food cost, labor cost and expenses are higher and the ratios of miscellaneous or controllable expense, VAT, rent and profit are lower in hospitals with more than 400 beds compared with those less than 400 beds. However, no significant differences are present between these two groups of hospitals. The actual contract period was 2.2 years upon initial contract and 1.2 years upon renewal. The initial investment cost was 53 million won and the cost of renovation and repair was 8.5 million won. Significant differences were present between two groups of hospitals. The conditions of employment and number of personnel hired by contractors for contract patient food services were significantly different according to the number of beds.

  • PDF

Lifecycle cost assessment of best management practices for diffuse pollution control in Han River Basin (한강수계 비점오염원 저감시설의 생애주기비용 평가)

  • Lee, Soyoung;Maniquiz-Redillas, Marla C.;Lee, Jeong Yong;Mun, Hyunsaing;Kim, Lee-Hyung
    • Journal of Wetlands Research
    • /
    • v.18 no.4
    • /
    • pp.448-455
    • /
    • 2016
  • Diffuse pollution management in Korea initiated by the Ministry of Environment (MOE) resulted to the construction of pilot facilities termed Best Management Practices (BMPs). Twelve BMPs installed for the diffuse pollution management in the Kyung-An Stream were monitored since 2006. Data on the mass loading, removal efficiency, maintenance activities, etc. were gathered and utilized to conduct the evaluation of long-term performance of BMPs. The financial data such as actual construction, design and maintenance cost were also collected to evaluate the lifecycle cost (LCC) of BMPs. In this study, most of the maintenance activity was focused in the aesthetic maintenance that resulted to the annual maintenance cost of the four BMP types was closely similar ranging from 8,483 $/yr for retention pond to 8,888 $/yr infiltration system. The highest LCC were observed in constructed wetland ($418,324) while vegetated system had the lowest LCC ($210,418). LCC of BMPs was not so high as compared with the conventional treatment facility and sewage treatment plant. On the other hand, the relationship of removal efficiency on unit cost for TSS and TN was significant. This study will be used to design the cost effective BMP for diffuse pollution management and become models for LCC analysis.