Optimization of Generator Maintenance Scheduling with Consideration on the Equivalent Operation Hours

  • Han, Sangheon;Kim, Hyoungtae;Lee, Sungwoo;Kim, Wook
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권2호
    • /
    • pp.338-346
    • /
    • 2016
  • In order for the optimal solution of generators’ annual maintenance scheduling to be applicable to the actual power system it is crucial to incorporate the constraints related to the equivalent operation hours (EOHs) in the optimization model. However, most of the existing researches on the optimal maintenance scheduling are based on the assumption that the maintenances are to be performed periodically regardless of the operation hours. It is mainly because the computation time to calculate EOHs increases exponentially as the number of generators becomes larger. In this paper an efficient algorithm based on demand grouping method is proposed to calculate the approximate EOHs in an acceptable computation time. The method to calculate the approximate EOHs is incorporated into the optimization model for the maintenance scheduling with consideration on the EOHs of generators. The proposed method is successfully applied to the actual Korean power system and shows significant improvement when compared to the result of the maintenance scheduling algorithm without consideration on EOHs.

발전소 터빈제어 밸브시험 계통 모델 개발 (Development of Process Model for Turbine Control Valve Test in a Power Plant)

  • 우주희;최인규;박두용;김종안
    • 전기학회논문지
    • /
    • 제60권4호
    • /
    • pp.830-837
    • /
    • 2011
  • A turbine control system which has been operated for years in a nuclear power plant was retrofitted with a newly developed digital control system. After completion of the retrofit, turbine valve tests were performed to ensure the integrity of each valve's control function. The sequence of each valve test is composed of a closing process and a reopening process. To minimize megawatt variation which normally occurs during the test sequence, we employed a kind of compensator algorithm in the new digital control system which also have been used in the old system. There were difficulties finding optimal parameter settings for our new compensator algorithm because the power plant didn't allow us to perform necessary tuning procedures while the turbine is on load operation. Therefore an alternative measure for the compensator tuning which is independent of the turbine actual operation had to be implemented. So, a process model for the test was required to overcome this situation. We analyzed the operation data of the test and implemented the process model by use of input and output variable relations. Also we verified the process model by use of another condition's operating data. The result shows that the output of model is similar to the actual operation data.

Development and Verification of Operation Management Tool for KASS

  • Minhyuk Son;ByungSeok Lee
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제12권4호
    • /
    • pp.431-436
    • /
    • 2023
  • In order to provide continuous Korea Augmentation Satellite System (KASS) services, the operation organization should continuously and systematically perform operations, maintenance, and technical activities. All subsystems of KASS, all Line Replacement Units (LRUs), and Software Replacement Units (SWRUs) should be operated and maintained continuously. In order to effectively manage these activities, it is necessary to develop an Operation Management Tool (OMT). For this purpose, operation management, operation organization, and operation activities were defined. The defined requirements were divided into general, function, interface, and database for OMT development, and functions and decision-making procedures consisting of site/asset/trouble/work order/schedule management were designed. The OMT developed by reflecting the site and asset information as well as the design content met predefined requirements. The OMT will be actively used in actual KASS operation and will evolve by continuously reflecting the additional requirements of operators. Through this tool, KASS will support continuous service provision.

하이드로포밍 제품의 가공경화를 가지는 벤딩공정에 의한 영향분석 (The study of effect for bending operation having working hardening on hydroforming parts)

  • 김광순;김윤규;박두수
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2007년도 추계학술대회 논문집
    • /
    • pp.209-214
    • /
    • 2007
  • This study is concerned with working hardening of bending operation on hydroforming parts. Generally, hydroforming parts having the complicated shape of the automobile, require a 3-dimentional bending operation. This operation involves several variations in the tube which are the thickness, the mechanical characteristics, the hardness, the circumference etc., on original tube. So, we study those variations and the affect on the hydroforming operation and hydroforming parts. We used two methods, one of which was computer simulation and the other the actual test in the plant.

  • PDF

Examining Importance of Urban Rotorcraft Operations Using Analytic Hierarchy Process

  • Hye-Jin, Hong;Yong-og, Kim;Sungkwan, Ku
    • International Journal of Advanced Culture Technology
    • /
    • 제10권4호
    • /
    • pp.487-498
    • /
    • 2022
  • This study aims to determine the importance of each factor considered when operating a rotorcraft in a city. After identifying factors that could affect urban air mobility, we reviewed the influencing factors by applying an analytic hierarchy process (AHP). Level 1 classifies the essential factors of the urban operation of rotorcraft in nominal and off-nominal situations. The factors corresponding to the characteristics of each were composed of lower levels, such as Levels 2 and 3. Using this, the importance of influencing factors was analyzed and the most important factors were determined. The most influential factors of the urban operation of rotorcraft included engine failure, fire situations, and vehicle safety. Accordingly, an environment that can guarantee safe operation by considering the most influential factors in advance in an actual operation stage must be constructed.

Modeling and Analysis of the KEPCO UPFC System by EMTDC/PSCAD

  • Yoon, Jong-Su;Kim, Soo-Yeol;Chang, Byung-Hoon;Lim, Seong-Joo;Choo, Jin-Boo
    • KIEE International Transactions on Power Engineering
    • /
    • 제3A권3호
    • /
    • pp.148-154
    • /
    • 2003
  • This paper describes the development of KEPCO's 80MVA UPFC electromagnetic transient model and the analysis of its performance in the actual Korean power system. KEPCO's 80MVA UPFC is currently undergoing installation and will be ready for commercial operation from the year 2003. In order to apply a new FACTS device such as the UPFC to the actual power system, the utility needs, in advance, both load flow stability studies and transient studies. Therefore, KEPRI, the research institute of KEPCO, developed a detailed transient analysis model that is based on the actual UPFC S/W algorithm and H/W specifications. This simulation model is implemented by an EMTDC/PSCAD package. The results of the simulation show the effectiveness of UPFC operation in the KEPCO power system.

보금자리주택 단지와 민간분양아파트 단지의 관리 실태와 관리의식 비교연구 (A Comparative Study on the Condition of Management and Consciousness of Bogumjari Housing Complex and Private Condominium)

  • 강순주
    • 한국주거학회논문집
    • /
    • 제26권2호
    • /
    • pp.29-38
    • /
    • 2015
  • The purpose of this study is to understand the actual condition of Bogumjari Housing Complex residents' management consciousness and to provide suggestions on ways to induce residents' volunteer participation and practice of the apartment management. This study was performed on Bogumjari Housing Complex which was occupied in 2012 and the similar-sized apartment complex of the private condominium to compare and analyze their actual condition of management and consciousness of their residents. The results of the analysis could be summarized as follows: 1) In terms of management of operation, there is no distinct difference. In terms of maintenance management, Bogumjari Housing Complex has difficulty in maintenance because of lack of management manpower. Also, the apartment complex of the private condominium has higher spontaneous participation rate, which seems to be influenced by activation of various organizations. 2) In terms of the satisfaction of management process, Bogumjari Housing Complex has have higher satisfaction with promotion of the apartment Management Rules, but it has lower satisfaction with public hygiene, community facility maintenance and operation of program than that of apartment complex of the private condominium. 3) Bogumjari Housing Complex has higher maintenance and participation consciousness, drawing conclusion that Bogumjari Housing Complexs' residents have higher expectations for apartment, a keen interest and strong will.

발전기 공급능력 산정 및 예측 기술개발 (Development of Supply Capability Calculation and Prediction Technology for Generator)

  • 김의환;안영모;홍은기
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제2권3호
    • /
    • pp.425-431
    • /
    • 2016
  • Supply Capability of the generator, if the maximum demand occurs, refers to the maximum power that can be stably supplied and it is possible to maintain stable power supply to be greater than actual load. However, unexpected power demand and reduction in supply Capability due to stop of unexpected generator in operation can temporarily make a big chaos in power system. In fact, due to a lack of power supply Capability in the country, enforced emergency load adjustment to the September 15, 2011, the circulation power outage has occurred in several cities. As the result, interrupted operation of the elevator and stopped hospital medical equipment led to a great deal of trouble to people's lives, causing a social problem. At that time, it was found that a failed frequency control because of smaller actual supply Capability than that of predicted. The difference was about 1,170 MW with Gas turbine power plant. By accurately calculating the generator supply capability, we can not only grasp the power reserve rate, but also correspond to the time of power supply instability.

영구자석 표면부착형 동기전동기의 과변조 영역에서 상전압 검출에 의한 센서리스 제어 (Sensorless Control of a Surface Mounted PM Synchronous Motor in Over Modulation Regions by Detecting Phase Voltages)

  • 최해준;이한솔;조관열;김학원
    • 전력전자학회논문지
    • /
    • 제22권1호
    • /
    • pp.53-59
    • /
    • 2017
  • The information on the actual voltages and actual currents of the motor is required for the sensorless control of a permanent magnet synchronous motor without rotor position sensors. In the model-based rotor position estimator of a PM synchronous motor, the reference voltages, which are the outputs of the current controller, are commonly used. The reference voltages in over-modulation regions for high-speed operation differ from the actual voltages applied to the motor. Consequently, the estimated rotor position and rotor speed may fail to track the real rotor position and real rotor speed. In this paper, the sensorless control for a PM synchronous motor in over-modulation regions for high-speed operation is proposed. The three-phase voltages applied to the motor are measured by using additional voltage detection circuits, and the performance of the rotor position estimator based on the measured three-phase voltages is validated through the experimental results.

발전소 보일러 급수 주제어 시스템의 개발 (The Development of Boiler Feedwater Master Control System for Power Plant)

  • 임건표;박두용;김종안;이흥호
    • 전기학회논문지
    • /
    • 제61권3호
    • /
    • pp.442-450
    • /
    • 2012
  • Almost domestic power plants are being operated by foreign distributed control system. Many korean power plants are being operated over their lifetime so they need to be retrofitted. So we are developing the distributed control system to solve this problem by our own technique. The simulator was already made to verify the reliability of the algorithms. The unit loop function tests of all algorithms were finished in the actual distributed control system for installation of power plant and their results were satisfactory. The unit loop function tests are for each unit equipment algorithm. So the total operation tests will be made with all algorithms together in the actual distributed control system to be applied to power plant. When the verification through all tests is finished, algorithms with hardware will be scheduled to be installed and operated in the actual power plant. This research result will contribute to the safe operation of the deteriorated power plant and korean electric power supply as well as domestic technical progress. This entire processes and results for the development are written for the example of boiler feedwater master algorithm out of all algorithms in this paper.