• 제목/요약/키워드: Actual Cost Data

검색결과 588건 처리시간 0.03초

도로제설 이력자료 기반 제설 인프라 분석 (Analysis of Road Snow-removal Infrastructure using Road Snow-removal Historical Data)

  • 김진국;김승범;양충헌
    • 한국도로학회논문집
    • /
    • 제19권3호
    • /
    • pp.83-90
    • /
    • 2017
  • PURPOSES : In this study, systematic road snow-removal capabilities were estimated based on previous historical data for road-snowremoval works. The final results can be used to aid decision-making strategies for cost-effective snow-removal works by regional offices. METHODS : First, road snow-removal historical data from the road snow-removal management system (RSMS), operated by the Ministry of Land, Infrastructure and Transport, were employed to determine specific characteristics of the snow-removal capabilities by region. The actual owned amount and actual used amount of infrastructure were analyzed for the past three years. Second, the regional offices were classified using K-means clustering into groups "close" to one another. Actual used snow-removal infrastructure was determined from the number of snow-removal working days. Finally, the correlation between the de-icing materials used and infrastructure was analyzed. Significant differences were found among the amounts of used infrastructure depending on snowfall intensity for each regional office during the past three years. RESULTS:The results showed that the amount of snow-removal infrastructure used for low heavy-snowfall intensity did not appear to depend on the amount of heavy snowfall, and therefore, high variation is observed in each area. CONCLUSIONS:This implies that the final analysis results will be useful when making decisions on snow-removal works.

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantit)

  • 박홍태;박찬정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

콘크리트 교량의 생애주기비용 민감도 분석 (A Study on Sensitivity Analysis of Life-Cycle Cost of Concrete Bridges)

  • 구본민;변근주;송하원
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2004년도 추계 학술발표회 제16권2호
    • /
    • pp.773-776
    • /
    • 2004
  • The so-called Life Cycle Cost (LCC) analysis on reinforced concrete bridge can provide useful information for initial design and maintenance plan of the RC bridge. This paper proposes an LCC prediction equation and a sensitivity analysis method for RC bridges. An LCC equation for the RC bridge which includes initial investment cost, maintenance cost, and demolition cost was derived and verified from the data for design and construction of an RC slab bridge. In order to solve uncertainty problem on actual discount rate and material characteristics in the analysis of LCC of concrete bridges, a sensitivity analysis method on the LCC using the Monte Carlo simulation technique was suggested.

  • PDF

실적자료에 의한 공동주택 하자보수비용의 시계열적 분석 (A Study on the Time Series Analysis of Defect Maintenance Cost in Apartment House according to the Actual Use Data)

  • 송동현;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.177-178
    • /
    • 2011
  • Recently a great deal of people are taking legal action against the housing provider due to the defects of their Apartment house. And most of the housing companies are spending a huge amount of expenses and efforts to keep their brand value. This essay will carry out time series analysis the 20 housing district which are constructed by huge construction companies. This analysis itemised by metropolitan area(Seoul) and others to keep the degree of reliability, and converted future defect maintenance cost into current cost applied by discount rate to figure out suitability of defect maintenance cost. Even though, this essay is not able to represent standard of defect maintenance cost due to the insufficiency of record, while it will be assisted as a referance when long-term record of time series is estabilished.

  • PDF

순간정전을 고려한 배전계통에서의 신뢰도 평가-몬테카를로 방식의 적용 (Reliability Evaluation of Power Distribution Systems Considering the Momentary Interruptions-Application of Monte Carlo Method)

  • Sang-Yun Yun;Jae-Chul Kim
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권1호
    • /
    • pp.9-16
    • /
    • 2003
  • In this paper, we propose a reliability evaluation method considering the momentary interruptions of power distribution systems. The results of research are concentrated on two parts. One is the analytic and probabilistic reliability evaluation of power distribution system considering the momentary interruptions and the other is the reliability cost evaluation that unifies the cost of sustained and momentary interruptions. This proposed reliability cost evaluation methodology is also divided into the analytic and probabilistic approach and the time sequential Monte Carlo method is used for the probabilistic method. The proposed methods are tested using the modified RBTS (Roy Billinton Test System) form and historical reliability data of KEPCO (Korea Electric Power Corporation) system. Through the case studies, it is verified that the proposed reliability evaluation and its cost/worth assessment methodologies can be applied to the actual reliability studies.

스마트건설 공사비산정기준 사례조사 연구 - 일본사례를 중심으로 - (Case Study on the Cost Estimation standard for Smart Construction - Focused on Japan)

  • 송태석;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2020
  • Recently, the need for smart construction technologies related to the Fourth Industrial Revolution has been increasing in order to improve productivity of the construction industry. The Ministry of Land, Infrastructure and Transport has established Smart construction technology road map to commercialize the smart construction, and research and development is also underway. However, due to the lack of cost estimation standards for such smart construction technologies to be deployed to actual sites, smart construction technologies are not actively applied to construction sites. In particular, cost estimation standards are needed for construction machinery equipment with ICT technology that is currently available for commercialization. Therefore, as a preliminary study for the development of smart construction cost estimation standards, a case study was conducted on ICT construction estimation standards in Japan and present them as basic data for standards in Korea.

  • PDF

필드데이터에 의한 철도차량 신호장치 구성품의 최적 교체주기 결정에 관한 연구 (A Study on Determining the Optimal Replacement Interval of the Rolling Stock Signal System Component based on the Field Data)

  • 박병노;김경화;김재훈
    • 한국안전학회지
    • /
    • 제38권2호
    • /
    • pp.104-111
    • /
    • 2023
  • Rolling stock maintenance, which focuses on preventive maintenance, is typically implemented considering the potential harm that may be inflicted to passengers in the event of failure. The cost of preventive maintenance throughout the life cycle of a rolling stock is 60%-75% of the initial purchase cost. Therefore, ensuring stability and reducing maintenance costs are essential in terms of economy. In particular, private railroad operators must reduce government support budget by effectively utilizing railroad resources and reducing maintenance costs. Accordingly, this study analyzes the reliability characteristics of components using field data. Moreover, it resolves the problem of determining an economical replacement interval considering the timing of scrapping railroad vehicles. The procedure for determining the optimal replacement interval involves five steps. According to the decision model, the optimal replacement interval for the onboard signal device components of the "A" line train is calculated using field data, such as failure data, preventive maintenance cost, and failure maintenance cost. The field data analysis indicates that the mileage meter is 9 years, which is less than the designed durability of 15 years. Furthermore, a life cycle in which the phase signal has few failures is found to be the same as the actual durability of 15 years.

방산물자 원가계산시 적정 노무비 추정방안 (Presumption Method of Proper Labor Cost While Calculating Primary Cost of Defense Industrial Manufacturing Items)

  • 한현진;추성호;서성철
    • 한국국방경영분석학회지
    • /
    • 제28권2호
    • /
    • pp.85-94
    • /
    • 2002
  • Calculation of proper expenses on acquisition and purchasing defense product is matter of survival and weighing the morality for both defense industry and the national facilities. With this reason, both parties have been a big job to estimate the resonable cost. The cost are composed of many subordinated parts such as material cost, labor cost, and so on. In the compositions of that cost, the most important part in between companies and the government throughout the whole calculating process is to define the proper labor cost. When both parties calculate imported articles or overhead expenses, they can easily calculate and confirm by documented evidences or related materials. In other hand, the labor cost, which can be seen as two absolutely different numbers and opinions can be created, depends on analyzer's point of view. These interpretation and judgment of data cannot avoid analyzer's intention. In accordance with the above matters, defining the reasonable labor cost will be the top priority in order to analyze the proper expenses. This study will provide a method of proper labor cost estimation before starting the actual manufacturing to calculate the rational labor cost.

A350 모델의 비행실적을 이용한 중량 효과 검증 (Verification of Weight Effect Using Actual Flight Data of A350 Model)

  • 장성우;유재림;유광의
    • 한국항공우주학회지
    • /
    • 제50권1호
    • /
    • pp.13-20
    • /
    • 2022
  • 항공기 중량은 성능 및 연료효율성에 영향을 미치는 중요한 요소이다. 항공기의 개념 설계 단계에서는 요소 중량을 추정함에 중량 당 연료소모 비용과 같은 경험식을 이용하여 비용과 중량 간의 균형을 맞추는 과정을 수행한다. 또한, 항공사에서 항공기를 운용할 때 중량관리 활동을 통해 연료 효율성 향상 및 연료절감과 탄소저감을 추진한다. 항공기 중량 변화와 연료 소모 변화 사이의 연관성을 중량비용(Cost of Weight)이라고 하며, 중량비용은 항공기에 중량 추가 혹은 감소가 연료소모에 미치는 영향을 평가함에 사용하고 있다. 본 연구에서는 기존 중량비용 산정 방법의 문제점을 확인하고, 이를 해결하기 위한 새로운 방법의 중량비용 산정 방법을 소개한다. Breguet의 Range Formula와 A350-900 항공기의 실제 비행 데이터를 이용하여 이륙중량과 착륙중량 기반의 두 가지 중량비용을 산정한다. 결론에서는 이륙중량과 착륙중량 기반의 중량비용을 다른 용도로 사용함이 합리적임을 제시하였다. 특히, 착륙중량 기반의 중량비용은 유사 항공기 개념설계 단계에서 요소중량 추정 및 비용과 중량 최적화에 하나의 경험식으로 활용할 수 있다.

Design on Multi-Surveillance System for turn-out stations of the railway

  • Oh, Se-Ho;Park, Jung-Gyun;Park, Hyen-Young;Lee, Yong-Jae;Kim, Yang-mo
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2002년도 ITC-CSCC -1
    • /
    • pp.579-582
    • /
    • 2002
  • For train service, safety and reliability is an inevitable performance. Specially, turn-out system of the railway for safety because of actual part. Hence the management is strictly executed over turn-out systems of the railway. Also number of turn-out system need to monitoring systems. In this paper, the data multi-acquisition system for monitoring it is necessary to reduce the cost from the expensive characteristics of multi-monitoring system according to the importance of each data because this system is based on communication of one to several units. We designed the data multi-acquisition system using numbers of micro-controller and the experiment was executed to the actual turn-out system.

  • PDF