• 제목/요약/키워드: Actual Cost Addition Method

검색결과 98건 처리시간 0.026초

해외 건설엔지니어링분야 대가기준 사례분석을 통한 개선방향 마련 (The Establishment of Improvement Direction through Case Analysis of Cost Standards in Overseas Construction Engineering)

  • 고현아;한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.165-166
    • /
    • 2020
  • The standard for the cost calculation in the field of domestic construction engineering can be largely divided into the construction cost ratio method and the actual cost addition method. However, the standard for calculating the cost of the construction cost ratio method is a trend to switch to the actual cost addition method due to limitations such as not reflecting the characteristics of the construction. Therefore, this study aims to derive implications by investigating and analyzing examples of cost standards in the field of overseas construction engineering, such as the United States, and deriving directions for improvement in domestic cost standards in the future.

  • PDF

소프트웨어 운영 대가산정 방식에 대한 실증적 연구 (An Empirical Study on Pricing Model for Software Operation)

  • 김흥식;김충영;서용원
    • 한국IT서비스학회지
    • /
    • 제18권4호
    • /
    • pp.67-82
    • /
    • 2019
  • The purpose of this study is to improve the calculation method of the software operation pricing proposed by the software business price calculation guide from 'input manpower method' to 'rate calculation method'. The software operation pricing of the input manpower method is not objectively calculated in the domestic IT outsourcing situation where the statistical data based on the activity based estimating is insufficient and it is decided by agreement between the owner and the client. In addition, there was no standard for adjusting the productivity according to the characteristics of the operation service. In order to improve this, an operational correction factor item that can affect the software operation productivity was selected based on foreign and domestic standards, and it was confirmed through the first questionnaire to IT operation managers. In order to determine the level of difficulty of the fixed operational correction factors, the operational correction factor using AHP technique was confirmed through a second questionnaire for pairwise comparison. The operational difficulty calculation table was developed with reference to COCOMO and ITIL standards. Finally, we propose a new pricing scheme that reflects the operating rate. Regression analysis was carried out by collecting the data of the domestic public institutions on the estimated cost and the actual cost calculated from the new rate method software operation pricing. The results of the regression analysis show that the estimated cost and the actual cost are related to each other. Mean magnitude of relative error(MMRE) and PRED[25] analysis were added for accuracy analysis. MMRE and PRED also showed satisfactory results, confirming the possibility of replacing the rate method software operation pricing.

Optimum Reserves in Vietnam Based on the Approach of Cost-Benefit for Holding Reserves and Sovereign Risk

  • TRAN, Thinh Vuong;LE, Thao Phan Thi Dieu
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권3호
    • /
    • pp.157-165
    • /
    • 2020
  • This paper estimates the optimum level of reserves in Vietnam based on the approach of reserves' cost-benefit and sovereign risk which is one of developing countries' characteristics. The cost of reserves is the opportunity cost when holding reserves. The benefit of reserves is the loss due to country's default in case that there is no reserves to finance external debt payment. The optimum reserves is found out by minimizing the total of opportunity cost and loss due to country's default with the probability of default. Through the usage of HP Filter method for calculating the loss due to country's default, ARDL regression for the risk premium model and lending rate of VND as proxy for opportunity cost together with the Vietnamese economic data in the period of 2005 - 2017, the empirical results show that the optimum reserves in Vietnam is almost higher than the actual reserves during the research period except the point of Q3/2008 and the last point of research period - Q4/2017. Therefore, Vietnam should continue to increase reserves for safety but Vietnam does not need pushing quickly the speed of increasing reserves. In addition, controlling Vietnamese optimum reserves is necessary to help the actual reserves become reasonable.

서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구 (A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul)

  • 우종태
    • 한국재난정보학회 논문집
    • /
    • 제19권1호
    • /
    • pp.18-30
    • /
    • 2023
  • 연구목적: 본 연구는 서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안을 도출하여 건설계측의 신뢰향상으로 계측기술 발전에 기여한다. 연구방법:공사계측비의 설계 및 계약 현황, 공사계측비의 적용 현황 및 분석, 안전관리비와 품질관리비 분석, 이를 개선하기 위해 계측관리용역에 대한 대가 산정기준 적용 확대와 발주처에서 직접 발주하는 방안을 제시한다. 연구결과: 그동안 건설공사에 포함하여 발주하던 계측관리용역을 입찰참가자격 사전심사를 통하여 발주처에서 계측업체를 직접 선정하여 계측을 수행하면 계측 품질을 높이고 정확한 계측데이터 확보가 가능하다. 결론:계측관리용역에 대한 대가 산정기준은 시공사에서 하도급으로 수행하게 되는 순공사비 내에 포함하는 방식이 아닌 발주처 직접 발주로 엔지니어링진흥법에 따른 실비정액가산방식과 지반조사 표준품셈의 계측관리비 산출기준의 적용을 확대해야 한다.

진료비 고가도 지표의 한계와 개선 방향 (Limitations and Improvement of Using a Costliness Index)

  • 장호연;강민석;정서현;이상아;강길원
    • 보건행정학회지
    • /
    • 제32권2호
    • /
    • pp.154-163
    • /
    • 2022
  • Background: The costliness index (CI) is an index that is used in various ways to improve the quality of medical care and the management of appropriate treatment in medical institutions. However, the current calculation method for CI has a limitation in reflecting the actual medical cost of the patient unit because the outpatient and inpatient costs are evaluated separately. It is desirable to calculate the CI by integrating the medical cost into the episode unit. Methods: We developed an episode-based CI method using the episode classification system of the Centers for Medicare and Medicaid Services to the National Inpatient Sample data in Korea, which can integrate the admission and ambulatory care cost to episode unit. Additionally, we compared our new method with the previous method. Results: In some episodes, the correlation between previous and episode-based CI was low, and the proportion of outpatient treatment costs in total cost and readmission rates are high. As a result of regression analysis, it is possible that the level of total medical costs of the patient unit in low volume medical institute and rural area has been underestimated. Conclusion: High proportion of outpatient treatment cost in total medical cost means that some medical institutions may have provided medical services in the ambulatory care that are ancillary to inpatient treatment. In addition, a high readmission rate indicates insufficient treatment service for inpatients, which means that previous CI may not accurately reflect actual patient-based treatment costs. Therefore, an integrated patient-unit classification system which can be used as a more effective CI indicator is needed.

미국의 혁신의료기술 지불보상제도: 인공지능 의료기기를 중심으로 (Medicare's Reimbursement for Innovative Technologies: Focusing on Artificial Intelligence Medical Devices)

  • 이보람;임재준;양장미
    • 보건행정학회지
    • /
    • 제32권2호
    • /
    • pp.125-136
    • /
    • 2022
  • The costliness index (CI) is an index that is used in various ways to improve the quality of medical care and the management of appropriate treatment in medical institutions. However, the current calculation method for CI has a limitation in reflecting the actual medical cost of the patient unit because the outpatient and inpatient costs are evaluated separately. It is desirable to calculate the CI by integrating the medical cost into the episode unit. We developed an episode-based CI method using the episode classification system of the Centers for Medicare and Medicaid Services to the National Inpatient Sample data in Korea, which can integrate the admission and ambulatory care cost to episode unit. Additionally, we compared our new method with the previous method. In some episodes, the correlation between previous and episode-based CI was low, and the proportion of outpatient treatment costs in total cost and readmission rates are high. As a result of regression analysis, it is possible that the level of total medical costs of the patient unit in low volume medical institute and rural area has been underestimated. High proportion of outpatient treatment cost in total medical cost means that some medical institutions may have provided medical services in the ambulatory care that are ancillary to inpatient treatment. In addition, a high readmission rate indicates insufficient treatment service for inpatients, which means that previous CI may not accurately reflect actual patient-based treatment costs. Therefore, an integrated patient-unit classification system which can be used as a more effective CI indicator is needed.

다차원 시각적 분석방법을 이용한 공항 정시운항 분석에 관한 연구 (Airport Punctuality Analysis Using Multi-Dimensional Visual Analysis Method)

  • 조재희;이덕규
    • 한국IT서비스학회지
    • /
    • 제10권1호
    • /
    • pp.167-176
    • /
    • 2011
  • Punctuality is one of the key performance indicators of the airline industry and an important service differentiator especially for valuable customers. In addition, improvement on time performance can help achieve cost saving, i.e. the cost of airline report, which could range from 0.6% to 2.9% of their operating revenues. Therefore efficient management of punctuality is crucial for the industry. This study overcomes the limitations of existing analyses on punctuality and develops a multi-dimensional model for airport punctuality analysis. In addition to analysis of airport punctuality, visual analysis is also proposed in the study. Data was collected from actual flight data of Incheon International Airport. Using the new visual analysis method, the study discovered the pattern of the punctuality that has never studied before.

시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구 (A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects)

  • 강상혁;박원영;송순호;서종원
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.159-166
    • /
    • 2006
  • 우리나라의 공공 건설공사 예정가격 산정 근거로 사용되어 온 표준품셈은 다양한 시공환경, 공법, 기술수준 등에 따른 공사비의 변동을 현실적으로 반영하지 못하여 부실시공이나 과다비용의 산정과 같은 문제점이 대두되었다. 이에 정부는 표준품셈을 2004년부터 점차 축소하는 대신 실적공사비 제도를 단계적으로 도입키로 했다. 본 논문에서는 과거 낙찰되었던 계약단가 뿐 아니라 모든 입찰단가 자료를 활용하여 실적단가를 산출하기 위한 일련의 절차 및 방법론을 제시하였다. 본 절차에서 주요하게 다룬 사항은 신뢰성 있는 데이터 확보를 위해 저가입찰 등과 같은 전략적 입찰단가 추출에 대한 분석기준이다. 과거의 입찰단가 자료의 기술통계 결과를 바탕으로 두 차례에 걸쳐 전략적 입찰단가로 의심되는 통계적 이상치를 제거하고, 시간에 따른 보정을 통해 현가화하여 현재 활용가능한 실적단가를 산출하였다. 또한 입찰방식 및 예상낙찰률에 따른 입찰단가의 변동특성을 분석 악하여 실적단가 보정을 위한 기초연구를 수행하였다. 제안된 일련의 분석 및 산출 과정을 거쳐 현실성 있고, 시장성을 보다 충분히 반영할 수 있는 합리적인 예정가격의 산정이 가능할 것으로 사료된다.

A DECISION MAKING FRAMEWORK FOR REDUCING PROJECT DURATION BY APPLYING CONCURRENT ENGINEERING IN CONSTRUCTION

  • Han, Jin-Taek;Choi, Do-Seung;Lee, Jae-Seob
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1540-1547
    • /
    • 2009
  • Steel frame factories were surveyed in this study in order to explore the possibility of shortening the construction time and save on construction cost through overlapping at the stages of design or construction. In the survey, construction professionals were interviewed in order to collect quantitative data. Hypotheses were then formulated, and the data was thereby analyzed using the simulation technique in order to analyze the effects of the concurrent engineering method on shorter construction time and cost saving. In addition, actual cases were analyzed to determine the overlapping rates of major processes in terms of shorter construction time and cost saving and to analyze the relationship between time and cost due to overlapping.

  • PDF

도시정비형 재개발사업에서 공공참여에 의한 관리처분 및 원가정산 혼용 시행방식에 관한 고찰 (A Study on the Mixed Implementation Method of Management Disposition and Cost Settlement by Public Participation in Urban Renewal Type Redevelopment Projects)

  • 문명렬;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.254-255
    • /
    • 2021
  • The urban renewal type redevelopment project is a project to improve the urban environment for the recovery of urban functions and revitalization of commercial districts in commercial and industrial areas. Urban regeneration projects are not progressing smoothly. The urban renewal type is not so for landowners, who require a high level of professional knowledge and experience to carry out smooth projects. In addition, the core part of business conflicts can be seen as the problem of management and disposal methods. Therefore, as landowners, etc. become the actual subjects, the public will take charge of project execution, but all development gains and losses will be attributed to the owner of the land, etc.

  • PDF