• Title/Summary/Keyword: Activity Cost

Search Result 953, Processing Time 0.026 seconds

Analyzing the Evolutionary Stability for Behavior Strategies in Reverse Supply Chain

  • Tomita, Daijiro;Kusukawa, Etsuko
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.1
    • /
    • pp.44-57
    • /
    • 2015
  • In recent years, for the purpose of solving the problem regarding environment protection and resource saving, certain measures and policies have been promoted to establish a reverse supply chains (RSCs) with material flows from collection of used products to reuse the recycled parts in production of products. It is necessary to analyze behaviors of RSC members to determine the optimal operation. This paper discusses a RSC with a retailer and a manufacturer and verifies the behavior strategies of RSC members which may change over time in response to changes parameters related to the recycling promotion activity in RSC. A retailer takes two behaviors: cooperation/non-cooperation in recycling promotion activity. A manufacturer takes two behaviors: monitoring/non-monitoring of behaviors of the retailer. Evolutionary game theory combining the evolutionary theory of Darwin with game theory is adopted to clarify analytically evolutionary outcomes driven by a change in each behavior of RSC members over time. The evolutionary stable strategies (ESSs) for RSC members' behaviors are derived by using the replicator dynamics. The analysis numerically demonstrates how parameters of the recycling promotion activity: (i) sale promotion cost, (ii) monitoring cost, (iii) compensation and (iv) penalty cost affect the judgment of ESSs of behaviors of RSC members.

Product-Mix Decision Using Lean Production and Activity-Based Costing: An Integrated Model

  • MOHSIN, Nidhal Mohammed Ridha;AL-BAYATI, Hossam Ahmed Mohamed;OLEIWI, Zahra Hasan
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.4
    • /
    • pp.517-527
    • /
    • 2021
  • While the two principles of lean manufacturing and time-driven activity-based costing (TDABC) have been established out of multiple incentives and do not follow the same particular targets, there is substantial commonality between them. In these conditions, the supply management of a multi-product system needs a rigorous production model to minimize costs. In this sense, this paper proposes an interactive model with the consideration of optimizing product-mix decisions using both lean development tools and TDABC. This paper proposes a qualitative approach using the case study of the Iraqi state company for battery production. The suggested model decreased manufacturing time and costs, along with some substantial reduction in idle production capacity by 26 percent in 2019, based on the findings of the case study. On the other hand, the proposed model gives two side advantages: an efficient division of costs on goods due to the use of time spent as a cost factor for products and cost savings due to the introduction of the lean manufacturing approach that reduces all additional costs and increases product-mix decisions. Furthermore, the analytical data gathered here suggests that the incorporation of lean management concepts and TDABC has a strong and important influence on product-mix decisions.

A Conceptual Framework of an Agent-Based Space-Use Prediction Simulation System

  • Cha, Seung Hyun;Kim, Tae Wan
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.4
    • /
    • pp.12-15
    • /
    • 2015
  • Size of building has a direct relationship with building cost, energy use and space maintenance cost. Therefore, minimizing building size during a project development is of paramount importance against such wastes. However, incautious reduction of building size may result in crowded space, and therefore harms the functionality despite the fact that building is supposed to satisfactorily support users' activity. A well-balanced design solution is, therefore, needed at an optimum level that minimizes building size in tandem with providing sufficient space to maintain functionality. For such design, architects and engineers need to be informed accurate and reliable space-use information. We present in this paper a conceptual framework of an agent-based space-use prediction simulation system that provides individual level space-use information over time in a building in consideration of project specific user information and activity schedules, space preference, ad beavioural rules. The information will accordingly assist architects and engineers to optimize space of the building as appropriate.

Towards More Accurate Space-Use Prediction: A Conceptual Framework of an Agent-Based Space-Use Prediction Simulation System

  • Cha, Seung Hyun;Kim, Tae Wan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.349-352
    • /
    • 2015
  • Size of building has a direct relationship with building cost, energy use and space maintenance cost. Therefore, minimizing building size during a project development is of paramount importance against such wastes. However, incautious reduction of building size may result in crowded space, and therefore harms the functionality despite the fact that building is supposed to satisfactorily support users' activity. A well-balanced design solution is, therefore, needed at an optimum level that minimizes building size in tandem with providing sufficient space to maintain functionality. For such design, architects and engineers need to be informed accurate and reliable space-use information. We present in this paper a conceptual framework of an agent-based space-use prediction simulation system that provides individual level space-use information over time in a building in consideration of project specific user information and activity schedules, space preference, ad beavioural rules. The information will accordingly assist architects and engineers to optimize space of the building as appropriate.

  • PDF

An Analysis of Cost and Profit of a Nursing Unit using Performance-Based Costing: Case of a General Surgical Ward in a General Hospital (시행기준 원가계산을 적용한 간호단위 원가 및 수익 인식에 관한 연구: 1개 종합병원 일반외과병동 사례를 중심으로)

  • Lim, Ji-Young
    • Journal of Korean Academy of Nursing
    • /
    • v.38 no.1
    • /
    • pp.161-171
    • /
    • 2008
  • Purpose: The aim of this study was to analysize net income of a surgical nursing ward in a general hospital. Method: Data collection and analysis was conducted using a performance-based costing and activity-based costing method. Result: Direct nursing activities in the surgical ward were 68, indirect nursing activities were 10. The total cost volume of the surgical ward was calculated at \119,913,334.5. The cost volume of the allocated medical department was \91,588,200.3, and the ward consumed cost was \28,325,134.2. The revenue of the surgical nursing ward was \33,269,925.0. The expense of a surgical nursing ward was \28,325,134.2. Therefore, the net income of a surgical nursing ward was \4,944,790.8. Conclusion: We suggest that to develop a more refined nursing cost calculation model, a standard nursing cost calculation system needs to be developed.

A Comparative Study of Recent Development of Hospital Cost Accounting in UK, US, and Japan (병원원가계산 실태의 국제적 동향과 시사점: 미국.영국.일본 사례를 중심으로)

  • Yook, Keun-Hyo
    • Korea Journal of Hospital Management
    • /
    • v.12 no.3
    • /
    • pp.20-46
    • /
    • 2007
  • Given the pressures to promote the efficient utilization of medical resources, hospitals have developed cost accounting systems in several countries. This study discusses the recent development and problems of hospital cost accounting practices in three countries: UK, US, and Japan. first, we discuss a cost accounting structure and detailed pictures of costing practices. Second, problems of current systems arc reviewed and then possible remedies are discussed. Third, we provide implications for implementing the systems(especially ABC). finally, we assert that infrastructure(hospital information systems, database, etc.) must be established and the target level of costing has to be considered before organization-wide application.

  • PDF

Determinants of Productivity Change in Export Manufacturing Firms : Focusing on Innovation (수출제조기업의 생산성변화에 영향을 미치는 요인 분석 : 혁신활동을 중심으로)

  • Hwang, Kyung-Yun;Koo, Jong-Soon;Hwang, Jung-Hyun
    • Korea Trade Review
    • /
    • v.41 no.4
    • /
    • pp.61-90
    • /
    • 2016
  • This study aims to identify the sources of productivity change in export manufacturing firms. After estimating the Malmquist productivity index, a panel regression was used to calculate the source of productivity change. Upon conducting a literature review of this field, six variables were selected as explanatory variables. The results of an analysis of 355 export manufacturing firms operating from 2009 through 2015 are as follows: First, both innovation activity and total assets had a positive impact on productivity change. However, employment cost intensity, equity ratio, and current ratio had a negative impact on productivity change in export manufacturing firms. Second, innovation activity and intangible assets had a positive impact on productivity change, but employment cost intensity, selling expense intensity, and equity ratio had a negative impact on productivity change in large export manufacturing firms. Third, innovation activity had a positive impact on productivity change, but employment cost intensity and equity ratio had a negative impact on productivity change in small and medium export manufacturing firms. Fourth, intangible assets had a positive impact on productivity change, but employment cost intensity, selling expense intensity, and current ratio had a negative impact on productivity change in export manufacturing firms listed on the Korea Composite Stock Price Index. Fifth, innovation activity and total assets had a positive impact on productivity change, but employment cost intensity and equity ratio had a negative impact on productivity change in manufacturing firms listed on the Korean Securities Dealers Automated Quotations. The managerial implications of this study are also discussed.

  • PDF

Economic Length of Stay and Opportunity Income of Appendectomy and Pneumonia Using Activity-based Costing (활동기준원가를 이용한 충수절제술과 폐렴의 경제적 재원일과 재원일 단축에 따른 기회이익)

  • Kim, Sang Mi;Lee, Hae Jong;Shin, Dong Gyo
    • Health Policy and Management
    • /
    • v.23 no.2
    • /
    • pp.124-131
    • /
    • 2013
  • Background: This study aimed to measure the opportunity income by identifying the economic length of stay (ELOS) which is the intersection point of daily revenue and cost on appendectomy and pneumonia cases. Methods: The research subjects were 460 patients of appendectomy and 606 patients of pneumonia, discharged from a general hospital between July 1, 2009 and June 30, 2010. ELOS calculated with both of total revenue on diagnosis-related group (DRG) and fee-for service (FFS). The cost is calculated by activity-based costing system of the hospital. Results: Average length of stay (ALOS) of appendectomy was 4.48 days and its average revenue per case were 1,710,215 (1,989,105) won by DRG (FFS). The variable cost was 491,262 won which was 28.7% (24.7%) of DRG (FFS) total revenue. And 97.2% of the total variable cost was incurred within 2 days from admission. The ELOS was 4 (5) days in DRG (FFS). Shortening three days (two days) would increase opportunity income 52.0% (82.2%) in DRG (FFS). ALOS of pneumonia case was 4.86 days and its average revenue per case were 489,448 (761,426) won by DRG (FFS). The variable cost was 27,230 won which was 5.6% (3.6%) of DRG (FFS) total revenue. Thirty-eight point nine percent of the daily variable cost was incurred in discharge date. The ELOS was 2 (4) days in DRS (FFS). Shortening three days (one day) would increase opportunity income 27.6% (37.2%) in DRG (FFS). Conclusion: The ELOS would be used by strategic index for achieving minimum profit and developing the ways to get there. But we also should not pass over that the opportunity income obtained by the reducing ALOS may cause some problem of quality.

Determinants of the Indirect Cost Rates of the Government-Funded Research Institutes in Korea (정부출연연구소의 간접비율 결정요인에 관한 연구)

  • 조성표;권선국;박구선;김재식
    • Journal of Technology Innovation
    • /
    • v.5 no.2
    • /
    • pp.155-177
    • /
    • 1997
  • Since 1995 the Korean Ministry of Science and Technology has introduced and implemented a project based system (PBS) for awarding R&D funds. While capital investments for national laboratories such as buildings and research facilities are supported by the government, normal operating expenses including personnel expenses should be earned by national laboratories through open competition under PBS. The project budget includes both direct research costs and indirect costs. The purpose of this paper is to examine the components of indirect costs and to examine determinants of indirect costs of national laboratories in Korea. The indirect costs of nineteen national laboratories are examined. The direct personnel costs and indirect personnel costs out of total personnel costs are 72% and 28%, respectively. The average indirect cost rate is 74.1% of direct personnel costs. Major components of indirect costs are general operating costs, indirect personnel costs, taxes and dues, and expenses related to the usage of equipment. The significant determinants of indirect cost are indirect personnel ratio. the ratio of unique projects, the type of national laboratories (pure research laboratories or other), and asset activity ratio measured as research divided by total assets. The high indirect personnel ratio, the high ratio of unique projects, the laboratories classified as other, the low asset activity ratio are related to high indirect cost rates.

  • PDF

The Case Study of Co-VE Activities (공동 VE활동의 사례연구)

  • Kim, Gwang-Su;Jeong, Sun-Seok
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.11a
    • /
    • pp.269-278
    • /
    • 2012
  • The purpose of VE (Value Engineering) activities is to come to an achievement of building necessary functions at the lowest possible cost. This study unfolds the co-VE activities which occurred between Gas Range and its partner company in the supply of Grill Body. The co-VE activity has accomplished the cost reduction of about 57 million through performing the function deployment of 12 parts and by devising the alternatives.

  • PDF