• 제목/요약/키워드: Acquisition Project

검색결과 279건 처리시간 0.031초

Registration-free 3D Point Cloud Data Acquisition Technique for as-is BIM Generation Using Rotating Flat Mirrors

  • Li, Fangxin;Kim, Min-Koo;Li, Heng
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.3-12
    • /
    • 2020
  • Nowadays, as-is BIM generation has been popularly adopted in the architecture, engineering, construction and facility management (AEC/FM) industries. In order to generate a 3D as-is BIM of a structural component, current methods require a registration process that merges different sets of point cloud data obtained from multiple locations, which is time-consuming and registration error-prone. To tackle this limitation, this study proposes a registration-free 3D point cloud data acquisition technique for as-is BIM generation. In this study, small-size mirrors that rotate in both horizontal and vertical direction are used to enable the registration-free data acquisition technique. First, a geometric model that defines the relationship among the mirrors, the laser scanner and the target component is developed. Second, determinations of optimal laser scanner location and mirror location are performed based on the developed geometrical model. To validate the proposed registration-free as-is BIM generation technique, simulation tests are conducted on key construction components including a PC slab and a structural wall. The result demonstrates that the registration-free point cloud data acquisition technique can be applicable in various construction elements including PC elements and structural components for as-is BIM generation.

  • PDF

국방 전장관리정보체계 연구개발사업의 애자일 적용 방안 연구 (A Study on the Agile Approach in Battlefield Management Information System R&D Project in Korea Military)

  • 윤성현;임규건
    • 한국IT서비스학회지
    • /
    • 제20권1호
    • /
    • pp.41-54
    • /
    • 2021
  • The SW-centered battlefield management information system R&D project takes a long period of 5-10 years or more by applying a complex and rigid batch acquisition strategy. In order to solve this problem, it is necessary to institutionalize a rapid and flexible battlefield management information system R&D project management procedure applying agile development methodology, and a government project management organization and contract management method to support it In this study, we analyzed the case of applying the Agile development method centered on Scrum to the US SW-centered weapon system R&D project and the characteristics and problems of the battlefield management information system R&D project in Korea, and suggested improvement measures as follows. First, the battlefield management information system R&D model applies the hybrid development method, and the system requirements analysis and system structure design use the existing waterfall development procedure, and the agile method is applied from the SW requirements analysis to the system integration stage. Second, flexible adjustment of performance, schedule, and cost by organizing an Agile IPT in which military (requirements) - DAPA (project management) - developer - functional specialized organizations (test and evaluation, quality, government research institutes, etc.) participate. Third, improving the Basic Order Agreement so that it can be applied to agile R&D.

국방무기체계 획득영향요인 상호관계 분석 : 함정획득지연 사례 및 요인 분석을 중심으로 (A Methodology for Analyzing on the Correlation of Factors Affecting the Acquisition of Military Weapons Systems : Focused on Factor Analysis of Naval Ship Acquisition Delay Cases)

  • 황정오;오현승;최봉완;임동순
    • 산업경영시스템학회지
    • /
    • 제43권4호
    • /
    • pp.48-58
    • /
    • 2020
  • Naval weapons systems of the Republic of Korea are acquired through the Defense Planning Management System. Recently, acquisition of some naval ships have been delayed, and the causes of the delays have been recognized as inappropriate project management at the Execution Phase. However, we argue that the delay problem in naval ships acquisition should be approached, with due regard for the entire Defense Planning Management System. That is, We should try to investigate from Planning Phase to those of Programming, Budgeting and Execution Phases. Therefore, in this study, we investigated the actual cases of the delay in naval acquisition at all phases of the Defense Planning Management System. Based on the investigation, we tried to identify the naval ship Acquisition Delay Factors and find out the Weights of those factors. As the next step, we calculated the Influence Measures on the naval missions, including the Cost of Naval Capability Gap derived from the delays in acquisition of naval ships. As a final step, we calculated the Acquisition Delay Measures based on the interrelationship between the Acquisition Delay Factors and the Influence Measures. Then we evaluated and analyzed what the results stand for. Finally, we made suggestions for future improvement. The improvement suggestions we made for preventing delay in acquisition of naval ships in this study are as follows. First, we need a shift in perception. It is necessary to measure the Acquisition Delay Factors in acquiring naval ships and manage them from the Planning Phase. Second, resolution must be concerted efforts. All relevant agencies, not just a few, should work together to resolve the problems of acquisition delay. Third, analysis must be based on the accumulation of data. This allows the elaborating of naval ship Acquisition Delay Factors and Delay Measures. If this research method is applied to other military weapons systems in the future, we may be able to not just identify the Acquisition Delay Factors in acquisition of other military weapons systems, but also pursue improvement in those cases.

고속전철 기술개발사업 본선 시운전 집전시험계획 (A Current Collection Performance On-line Test Plan in Korea High Speed Train Development Project)

  • 조용현;최강윤;백광선
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.156-162
    • /
    • 2001
  • Current collection performance on-line tests for a Korean High Speed Train being developed in G7 project is scheduled to start in June, 2002. In this paper, preparatory efforts for measuring contact forces which is regarded as one of major measuring items in the test are introduced. Specifically speaking, review of frequencies related with contact force fluctuations, brief of contact force measuring algorithm, review of measuring instrument specifications and development of a data acquisition program are presented.

  • PDF

사물인터넷을 활용한 BIM기반 건설 진도율 모니터링 시스템 (BIM based Construction Progress Monitoring System Integrated with IOT)

  • 손상혁;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.130-131
    • /
    • 2015
  • Accurate construction progress measurement is an important issue for successful project delivery. This paper presents a method that keeps track of the progress measurement involved in construction operations and facilities visualization of the data using BIM and IOT. To verify the method, a residential house project was used for the case study. Test case verifies the usability and validity of the method implemented in the system.

  • PDF

프로젝트 품질 인증 제도와 기업의 문화에 따른 프로젝트 품질 향상에 관한 탐색적 연구 (An Exploratory Study on Project Quality Certification System and Organizational Culture for Project Quality Improvement)

  • 문송철;김현수
    • 정보처리학회논문지D
    • /
    • 제11D권3호
    • /
    • pp.571-576
    • /
    • 2004
  • 국내의 정보화 프로젝트 개발 소프트웨어가 대형화되고 복잡화됨에 따라 개발 업체의 소프트웨어 프로젝트 품질이 매우 중요해지고 있다. 프로젝트 품질 평가 심사 모형인 CMM 등으로 개발 사업자의 프로젝트 수행능력이 평가되고 있다. 따라서 개발 사업자들은 CMM 등급 인증획득 또는 등급을 올리기 위한 노력을 기울이고 있다. 그러나 인증의 신뢰성에 대하여 논란이 되고 있는 시점에서 프로젝트 품질 인증의 제도가 프로젝트 품질에 차이를 나타내는지에 대한 연구와 CMM등급 인증과 기업 문화의 적합이 프로젝트 품질 성과에 차이를 나타내는지에 대하여 연구를 수행하였다. 연구 결과, CMM인증 등급이 높고 기업문화의 개방성이 높은 조직이 프로젝트 품질 성과가 높은 것으로 나타났다. 프로젝트 품질 성과를 높이기 위해서는 CMM인증 등급도 중요하지만 품질을 위한 기업 문화의 개방성을 높여나가는 것이 매우 중요한 것으로 나타났다.

대학도서관 전산화 수서업무 시스템의 설계와 구현 (A Computerized Acqusition System Design and Implement for an University Library)

  • 김상기;이용민
    • 정보관리학회지
    • /
    • 제11권1호
    • /
    • pp.167-187
    • /
    • 1994
  • 본 연구에서는 연세대학교 중앙도서관을 대상으로 하여, 대학도서관의 수작업 수서업무를 구조적 분석기법에 의해 분석하고, 이를 토대로 새로운 전산화 시스템의 모형을 설계하여, 이를 실제 업무적용을 위한 새로운 시스템으로 구현하였다. 그결과, 기존의 전산화 패키지의 기본루틴과 새로이 설계한 전산화 시스템과 그 내용이 유사해졌으므로 발주, 입수의 기본적인 처리는 전산화 패키지를 통하여 수행하고, 기타 출력물과 통계 및 회계처리 부분은 등록관리 서브시스템, 회계관리 서브시스템, 출력관리 서브시스템으로 추가 개발하여 구현하였다. 이러한 서브시스템들은 현재 토탈시스템인 수서업무 시스템과 연계되어 효과적인 업무처리가 가능하게 되었다.

  • PDF

도서관에서의 비도서자료의 활용에 관한 경험적 연구 -사회과학 도서관을 중심으로- (An Empirical Study on the Use of Non-Book Materials in the library of Social Science)

  • 강미혜
    • 정보관리학회지
    • /
    • 제11권2호
    • /
    • pp.49-66
    • /
    • 1994
  • 본 연구는 도서관에서의 비도서자료의 활용과 비도서자료에 대한 사서들의 인식 및 의견을 조사하였다. 설문지를 사용하여 129개의 데이터를 한국사회과학정보자료기관협의회의 31개 회원도서관과 98명의 사서로부터 수집하여 분석하였다. 분석결과, 도서관에서의 비도서자료의 활용은 매우 중요하다는 것이 밝혀졌다. 따라서 비도서자료의 활용은 좀더 활성화하기 위한 서지통정을 제안하였다.

  • PDF

국방시스템 기술전이지원을 위한 기술성숙도 도출에 관한 연구 (Calculation TRL using Integration Readiness Between Technologies for Supporting Technology-transition of Defense Technologies to the Defense Weapons System)

  • 배윤호;최석철
    • 경영과학
    • /
    • 제26권3호
    • /
    • pp.157-167
    • /
    • 2009
  • Technology transition from defense technology to weapon system is an important process for defense acquisition program. Many countries such as USA, UK, Australia and Republic of Korea use technology readiness level (TRL) as a tool for technology transition by identifying critical technology elements (CTEs) and assessing the technology maturity. In this paper we review a transition process for the defense acquisition. Then we suggest a method to evaluate system's TRL using each component TRL and integration readiness level (IRL) between each technologies. We apply the method to an ACTD project. A result show that technology maturity is influenced by integration between technologies.

Automatic Acquisition of Lexical-Functional Grammar Resources from a Japanese Dependency Corpus

  • Oya, Masanori;Genabith, Josef Van
    • 한국언어정보학회:학술대회논문집
    • /
    • 한국언어정보학회 2007년도 정기학술대회
    • /
    • pp.375-384
    • /
    • 2007
  • This paper describes a method for automatic acquisition of wide-coverage treebank-based deep linguistic resources for Japanese, as part of a project on treebank-based induction of multilingual resources in the framework of Lexical-Functional Grammar (LFG). We automatically annotate LFG f-structure functional equations (i.e. labelled dependencies) to the Kyoto Text Corpus version 4.0 (KTC4) (Kurohashi and Nagao 1997) and the output of of Kurohashi-Nagao Parser (KNP) (Kurohashi and Nagao 1998), a dependency parser for Japanese. The original KTC4 and KNP provide unlabelled dependencies. Our method also includes zero pronoun identification. The performance of the f-structure annotation algorithm with zero-pronoun identification for KTC4 is evaluated against a manually-corrected Gold Standard of 500 sentences randomly chosen from KTC4 and results in a pred-only dependency f-score of 94.72%. The parsing experiments on KNP output yield a pred-only dependency f-score of 82.08%.

  • PDF