This paper aims to analyze the overvoltage in underground distribution systems when lightning surge strikes to overhead line. The model is established by EMTP/ATPDraw for actual distribution systems. Simulation is carried out considering variation of parameters such as length and lightning current.
Nowadays, it is becoming difficult to secure a transmission line route when a new transmission line is constructed due to social environment and resident complaints. As existing urban areas are expanded and new cities are constructed, the necessity of high-capacity underground power transmission has been increasing because of load concentration in downtown areas. In North America, Europe and Japan, the research has been carried out for 2nd generation gas insulated transmission lines(GIL) which is more environmentally friendly and economical compared to previous GILs. The new GILs have been applied to real power systems from early 2000s. In South Korea, GIL is being considered as a possible solution for replacing 345kV high-capacity overhead transmission lines with underground transmission ones, so KEPCO is planning to develop and apply a new 362kV rated GIL underground transmission lines instead of overhead transmission lines. In this paper, the overvoltage generated at the combined transmission line adapting GIL was reviewed using EMTP.
Fault currents are expressed as a combination of harmonic components and exponentially decaying DC offset components, during the occurrence of fault in power system. The DC offset components are included, when the voltage phase angle of fault inception is closer to $0^{\circ}$ or $180^{\circ}$. The digital protection relay should be detected quickly and accurately during the faults, despite of the distortions of relaying signal by these components. It is very important to implement the robust protection algorithm, that is not affected by DC offset and harmonic components, because most relaying algorithms extract the fundamental frequency component from distorted relaying signal. So, In order to high performance in relaying, advanced DC offset removal filter is required. In this paper, a new DC offset removal filter, which is no need to preset a time constant of power system and accurately estimate the DC offset components with one cycle of data, is proposed, and compared with the other filter. In order to verify performance of the filter, we used collecting the current signals after synchronous machine modeling by ATPDraw5.7p4 software. The results of simulation, the proposed DC offset removal filter do not need any prior information, the phase delay and gain error were not occurred.
Sheath circulating current is increased in the change of sheath mutual impedance which is caused by unbalanced cable system, and different section length between joint boxes. If excessive current flows in sheath, sheath loss which is reduced the transmission capacity is produced. Recently, excessive sheath circulating current was partially measured in underground cable systems of KEPCO. Accordingly, actual schemes to reduce excessive sheath circulating current are urgently required for installed cable system as well as newly-installing cable systems. This paper describes the relation analysis of sheath circulating current and burying types. And also, various schemes to reduce excessive circulating current using EMTP/ATPDraw and applicable schemes are proposed through a detailed analysis regarding cable systems by considering various electrical and environmental factors. It is evaluated that the proposed reduction schemes can be effectively applied to reduce the excessive sheath circulating current with the minimized electrical problems. And reduction effect is Proved with sheath circulating current reduction equipment.
This paper is the transient analysis for choosing the optimal SCR ratings of AC3 utilization category testing equipment(AC3 TE) used for electrical durability test for magnetic switch according to IEC60947-4 Annex B by utilizing EMTP -ATPDraw. Magnetic contactor closes and opens the motor load with ON/OFF switch of electronic contactor. It is also used for protecting and controlling the load. Magnetic contactor detects the over-current flow in the load with a over-current relay and disconnects the load by opening its control power. The key cost of AC3 TE is the SCR ratings. The more decreases SCR ratings, the more decreased the cost is, but it is impossible to ensure the reliability. On the other hand, the more increases SCR ratings, the more increased the cost is. Thereupon, in this paper after the testing circuit is simulated by using EMTP-ATPDraw the SCR ratings will be applied in order to guarantee the testing reliability of PT&T(Power Testing and Technology institute in LG Industrial Systems Co.,Ltd.).
Dielectric breakdown accidents have been mainly occurred in the vicinity of service entrance section in underground power transmission systems. One cause among them is due to the excessive component value of sheath located around service entrance of cable. In this paper, as one of the alternative to prevent these accidents, the change of cross bond grounding system and the location change of IJ(Insulation Joint) are suggested. Also, to evaluate effectiveness of this changing system, circulating current and induced voltage of sheath were analyzed in steady and transient state. By comparison of the analytical results for the several possible changing systems, a grounding system and location of IJ which has the smallest sheath component values is proposed. In this paper, analysis to evaluate the proposed system is carried out by EMTP/ATPDraw. It can be used as a valuable operational material to prevent accident of the service entrance section in underground power transmission system.
An AC generator is an important component in producing an electric power and so it requires highly reliable protection relays to minimize the possibility of demage occurring under fault conditions. It is a need for research of digital generator protection system(DGPS) for the next-generation ECMS and an efficient operation of protection control system in power station. However, most of protection and control system used in power plants have been still imported as turn-key and operated in domestic. This may cause the lack of the correct understanding on the protection systems and methods, and thus have difficulties in optimal operation. In this paper, presented ratio differential relaying(RDR) is main protective element in generator protection IED. The fault detection technique, operation zone and setting value of the RDR were studied and, compared with two of the fault detection algorithm. For evaluation performance of the RDR, the data obtained from ATPDraw5.7p4 modeling was used. The proposed methods are shown to be able to rapidly identify internal fault and did not operate a miss-operation for all the external fault.
Kim, Jun-Hyeok;Lee, Soon-Jeong;Kim, Eung-Sang;Kim, Seul-Ki;Kim, Chul-Hwan;Prikler, Laszlo
Journal of Electrical Engineering and Technology
/
제9권1호
/
pp.98-105
/
2014
As environmentally friendly energy takes center stage, interests for Electric Vehicles/Plug in Hybrid Electric Vehicles (EVs/PHEVs) are getting increase. With this trend, there is no doubt EVs will take large portion to penetrations of total cars. Therefore, accurate EV modeling is required. Battery is one of the main components with the power system view of aspect. Hence, in this paper, reviews and discussions of some types of batteries for EV are contained by considering energy density and weight of the batteries. In addition, simulations of Li-Ion battery are accomplished with various variables such as temperature, capacity fading and charge/discharge current. It is confirmed that temperature is the main factor of capacity fading. Validation of the modeled battery is also conducted by comparing it with commercialized battery.
This paper describes the overvoltage analysis and reduction methods of insulation joint boxes in underground transmission power cables when direct lightning surge strikes to overhead transmission line. An actual 154kV combined transmission line with underground Power cables was modelled in ATPDraw for simulation. Simulations were performed to analyze the overvoltage between insulation joint boxes, sheath-to-ground voltage according to the distance between cable conductors, cable lengths, burying types, CCPU connection types. The most effective method to reduce the induced overvoltage of Insulation joint boxes was proposed. It is evaluated that the proposed reduction method riven from the detailed simulations can be effectively applied to the actual underground power cable systems.
Generators are the most complex and expensive single element in a power system. The generator protection relays should to minimize damage during fault states and must be designed for maximum reliability. A conventional CDR(Current Differential Relaying) technique based on DFT(Discrete Fourier Transform) filter have the disadvantages that the time information can lead to loss in the process of converting the signal from the time domain to the frequency domain. A WT(Wavelet transform) and WT analysis is known that it is possible with the local analysis of the fault and transient signal. In this paper, to overcome the defects in the DFT process, an application of WT for fault detection of generator is presented. This paper describes an selection of mother Wavelet to detect faults of generator. Using collected data from the fault simulation with ATPdraw, we analyzed the several mother Wavelet through the course of MLD(multi-level decomposition) using MATLAB software. Finally, it can be seen that the proposed technique using detail coefficient of Daubechies level 2 which can be fault discriminant of generator.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.