• Title/Summary/Keyword: AGV dispatching

Search Result 40, Processing Time 0.025 seconds

A study on Multi-Attribute AGV Dispatching Rules (다요소를 고려한 AGV 배송규칙에 관한 연구)

  • 이찬기
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.04a
    • /
    • pp.184-188
    • /
    • 1999
  • The performance of an AGV varies with the applied AGV dispatching rule in the operation of AGVS. This study proposes a multi-attribute AGV dispatching rule. The suggested dispatching rule considers the output queue of a workstation, distance between an idle AGV and a workstation to be served, the input queue of the destination and the remaining job process of a part. This study suggests two types of and the remaining job process of a part. This study suggests two types of multi-attribute dispatching rules. One is an one-stage rule which selects the part to be served considering four attributes simultaneously. The other is a two-stage rule by which a workstation is selected and a part is chosen from the selected workstation. The simulation runs were executed under different experimental conditions to obtain preliminary statistics on the several performance measures.

  • PDF

AGV Dispatching with Stochastic Simulation (확률적 시뮬레이션 기반 AGV 배차)

  • Choe, Ri;Park, Tae-Jin;Ryu, Kwang-Ryel
    • Journal of Navigation and Port Research
    • /
    • v.32 no.10
    • /
    • pp.837-844
    • /
    • 2008
  • In an automated container terminal, various factors affect the operation of container handling equipment such as quay cranes and AGVs, and thus calculating the exact operation time is nearly infeasible. This uncertainty makes it difficult to dispatch AGVs well. In this paper, we propose a simulation-based AGV dispatching algorithm When dispatching an AGV to an operation, the proposed algorithm conducts multiple stochastic simulation for the succeeding AGV operations for the predetermined period to collect stochastic samples of the result of the dispatching. In the stochastic simulation, the uncertainty of crane operations is represented as a simple probability distribution and the operation time of a crane is determined according to this. A dispatching option is evaluated by the total delay time of quay cranes which is estimated by averaging the quay crane delay of each simulation In order to collect a sufficient number of samples that guarantee the credibility of the evaluation, we devised a high-speed simulator that simulates AGV operation The effectiveness of the proposed algorithm is validated by simulation experiments.

A Study on Developing Dispatching Rule for Efficient Control of Single Loop-Single Vehicle AGV systems (단일루프-단일차량 형태의 AGV 시스템의 효율적인 운영을 위한 발주법 개발에 관한 연구)

  • 김경섭
    • Journal of the Korea Society for Simulation
    • /
    • v.7 no.1
    • /
    • pp.39-51
    • /
    • 1998
  • In this paper, MVED (Minimum Vehicle's Empty Distance), a new dispatching rule for a Single Loop-Single Vehicle AGV system, is developed. Single Loop-Single Vehicle AGV system consists of segmented bi-directional single loops, in which only one AGV is assigned. The MVED rule is focused on minimizing vehicles empty travel distance. Using simulation, the performance of the MVED is compared with that of existing dispatching rules such as STT/D and MEVTT. The results show MVED rule's better performance than others. ARENA is used as a simulation language.

  • PDF

Optimizing dispatching strategy based on multicriteria heuristics for AGVs in automated container terminal (자동화 컨테이너 터미널의 복수 규칙 기반 AGV 배차 전략 최적화)

  • Kim, Jeong-Min;Choe, Ri;Park, Tae-Jin;Ryu, Kwang-Ryul
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.06a
    • /
    • pp.218-219
    • /
    • 2011
  • This paper focuses on dispatching strategy for AGVs(Automated Guided Vehicle). The goal of AGV dispatching problem is allocating jobs to AGVs to minimizing QC delay and AGV total travel distance. Due to the highly dynamic nature of container terminal environment, the effect of dispatching is hard to predict thus it leads to frequent modification of dispatching results. Given this situation, single rule-based approach is widely used due to its simplicity and small computational cost. However, single rule-based approach has a limitation that cannot guarantee a satisfactory performance for the various performance measures. In this paper, dispatching strategy based on multicriteria heuristics is proposed. Proposed strategy consists of multiple decision criteria. A muti-objective evolutionary algorithm is applied to optimize weights of those criteria. The result of simulation experiment shows that the proposed approach outperforms single rule-based dispatching approaches.

  • PDF

A Study on Machine and AGV Dispatching in Flexible Manufacturing Systems (유연생산 시스템에서 기계와 무인 운반차의 할당규칙에 관한 연구)

  • 박성현;노인규
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.81-89
    • /
    • 1997
  • This study is concerned with the scheduling problems in flexible manufacturing systems(FMSs). The scheduling problem in FMSs is a complex one when the number of machines and jobs are increased. Thus, a heuristic method is recommended in order to gain near-optimal solutions in a practically acceptable time. The purpose of this study is to develope a machine and AGV dispatching algorithm. The proposed dispatching algorithm is a on-line scheduling algorithm considering the due date of parts and the status of the system in the scheduling process. In the new machine and AGV dispatching algorithm, a job priority is determined by LPT/LQS rules considering job tardiness. The proposed heuristic dispatching algorithm is evaluated by comparison with the existing dispatching rules such as LPT/LQS, SPT/LQS, EDD/LQS and MOD/LQS. The new dispatching algorithm is predominant to existing dispatching rules in 100 cases out of 100 for the mean tardiness and 89 cases out of 100 for the number of tardy jobs.

  • PDF

Optimizing dispatching strategy based on multicriteria heuristics for AGVs in automated container terminal (자동화 컨테이너 터미널의 복수 규칙 기반 AGV 배차전략 최적화)

  • Kim, Jeong-Min;Choe, Ri;Park, Tae-Jin;Ryu, Kwang-Ryul
    • Journal of Navigation and Port Research
    • /
    • v.35 no.6
    • /
    • pp.501-507
    • /
    • 2011
  • This paper focuses on dispatching strategy for AGVs(Automated Guided Vehicle). The goal of AGV dispatching is assigning AGVs to requested job to minimizing the delay of QCs and the travel distance of AGVs. Due to the high dynamic nature of container terminal environment, the effect of dispatching is hard to predict thus it leads to frequent modification of dispatching decisions. In this situation, approaches based on a single rule are widely used due to its simplicity and small computational cost. However, these approaches have a limitation that cannot guarantee a satisfactory performance for the various performance measures. In this paper, dispatching strategy based on multicriteria heuristics is proposed. The Proposed strategy consists of multiple decision criteria. A multi-objective evolutionary algorithm is applied to optimize weights of those criteria. The result of simulation experiment shows that the proposed approach outperforms single rule-based dispatching approaches.

A New Vehicle Dispatching in Semiconductor Intra-Bay Material Handling System (반도체 Intra-Bay 물류시스템에서의 차량 배차)

  • Koo, Pyung-Hoi;Suh, Jung-Dae;Jang, Jae-Jin
    • IE interfaces
    • /
    • v.16 no.spc
    • /
    • pp.93-98
    • /
    • 2003
  • This paper addresses an AGV dispatching problem in semiconductor clean-room bays where AGVs move cassettes of wafers between machines or machines and a central buffer. Since each machine in a bay has a local buffer of limited capacity, material flow should be controlled in a careful way to maintain high system performance. It is regarded that two most important performance measures in a semiconductor bay are throughput rate and lead-time. The throughput rate is determined by a bottleneck resource and the lead-time depends on smooth material flow in the system. This paper presents an AGV dispatching procedure based on the concept of theory of constraints (TOC), by which dispatching decisions are made to utilize the bottleneck resource at the maximum level and to smooth the flow of material. The new dispatching procedure is compared with existing dispatching rules through simulation experiments.

A Fuzzy Dispatching Algorithm with Adaptive Control Rule for Automated Guided Vehicle System in Job Shop Environment (AGV시스템에서 적응 규칙을 갖는 퍼지 급송알고리듬에 관한 연구)

  • 김대범
    • Journal of the Korea Society for Simulation
    • /
    • v.9 no.1
    • /
    • pp.21-38
    • /
    • 2000
  • A fuzzy dispatching algorithm with adaptable control scheme is proposed for more flexible and adaptable operation of AGV system. The basic idea of the algorithm is prioritization of all move requests based on the fuzzy urgency. The fuzzy urgency is measured by the fuzzy multi-criteria decision-making method, utilizing the relevant information such as incoming and outgoing buffer status, elapsed time of move request, and AGV traveling distance. At every dispatching decision point, the algorithm prioritizes all move requests based on the fuzzy urgency. The performance of the proposed algorithm is compared with several dispatching algorithms in terms of system throughput in a hypothetical job shop environment. Simulation experiments are carried out varying the level of criticality ratio of AGVs , the numbers of AGVs, and the buffer capacities. The rule presented in this study appears to be more effective for dispatching AGVs than the other rules.

  • PDF

A AGV time-oriented Job Dispatching Methodology for Preventing the Tardiness (납기지연시간 단축을 위해 AGV 시간을 고려한 작업할당 방법)

  • Kim, Geun-Hyung;Ko, Hyo-Heon;Baek, Jun-Geol
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.4
    • /
    • pp.125-137
    • /
    • 2011
  • Customers are generally requiring a variety of products, earlier due date, and lower price. A manufacturing process needs the efficient scheduling to meet those customer's requirements. This study proposes the novel algorithm named MJA(Minimum Job completion time and AGV time) that increases the performance of machines and AGV(Automated Guided Vehicles) in many kinds of job types. MJA optimizes the bottleneck of machines and efficiency of AGV with considering two types of dispatching at the same time. Suggested algorithm was compared with existing heuristic methods by several simulations, it performed better for reducing the time of tardiness.

A Study on the AGV Operation Using Production Cycle Time (생산주기를 활용한 AGV 운용에 관한 연구)

  • 김지표
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.1
    • /
    • pp.107-117
    • /
    • 2002
  • The ever-glowing demands for more responsiveness and more flexibility in manufacturing generate greater expectation for the AGV system. So far. a significant amount of research has been carried out to fulfill those requirements. However, the dynamic characteristics of manufacturing systems make it hard to solve the problem analytically. In this paper, the AGV system is analyzed in the production environments which adopt a cycle time to produce materials. The use of the cycle time could eliminate much of uncertainty Inherent In the manufacturing process so that it is possible to build the deterministic model for the AGV systems, which eventually Produce better results on the important issues such as AGV dispatching, determination of the number of AGVs, and empty vehicle travel time.