• Title/Summary/Keyword: ABS(Automatic Block System)

Search Result 3, Processing Time 0.02 seconds

The Development of Integration Electronic Block System for Maintenance Efficiency on Railway Wayside Signalling System (철도 선로변 신호설비 유지보수 효율화를 위한 집중형 전자폐색제어장치 개발)

  • Baek, Jong-Hyen;Jo, Hyun-Jeong;Kim, Yong-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.9
    • /
    • pp.4171-4176
    • /
    • 2012
  • The conventional block systems for railway signaling currently in operation in Korea have not been electrified or integrated and therefore there have been difficulties in terms of construction and maintenance. Two independent systems have been installed for ABS and LEU of ATP system (for speeded-up lines), although they deal with the same signaling information at the same location in order to control the trains. In these conventional ABS and LEU, a number of duplicate modules are installed in each device including lamp detection units and power supply units and it results increased manufacturing costs and maintenance efforts. This paper deals with the prototype development of integrated electronic block system with CPU-based digital control methods in order to overcome the limitations of the conventional ABS. The suggested system is the integration of the conventional ABS with LEU of ATP and it is also applicable for the non-ATP sections as well.

A Field test of an Integrated Electronic Block System for verification of the suitability (통합형 전자폐색제어장치의 적합성 확인을 위한 현장시험)

  • Kim, Young-June;Baek, Jong-Hyen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6427-6433
    • /
    • 2013
  • For trains to run safely and quickly, the train should always follow the preceding train at a proper spacing. For this purpose, a certain distance between the stations is set for each block section. For the safe operation of trains in one block section, only one train service for an automatic block system is needed. The existing block system is composed an ABS, which is a linked track circuit and line sideway system through the interlocking system. The interlocking system is being replaced with a domestic electronic interlocking system. On the other hand, the block system still uses the relay format of an analog system, and is independently installed of the line sideway systems. Therefore, the existing block system has many problems in terms of construction and maintenance. In addition, the existing domestic line is used for ABS and LEU , which is installed separately, despite the train being controlled by the information of the same signal at the same location. This is not efficient in terms of each product price and the maintenance costs. This paper introduces an integrated electronic block system and the field test results. The field test was carried out through a periodic inspection performed eight times from January to late August.

The Study on Centralization & Electronic for Maintenance Efficiency of Ground Signaling System (지상신호설비의 유지보수 효율화를 위한 집중화 및 전자화 연구)

  • Baek, Jong-Hyen;Kim, Yong-Kyu;Lee, Kang-Mi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.8
    • /
    • pp.2983-2988
    • /
    • 2010
  • The train control system used in Gyeongbu-line is classified in ATC, IXL and CTC. Domestic railway signaling systems are being developed by electrification. In these systems the electrification of interlocking reaches 57% and the safety equipments of railway crossings in trackside devices have completed their development into an integrated system. Block systems of all the existing sections have not yet electrified and integrated so that they need a number of complement in terms of construction and maintenance. For ABS currently used in existing domestic lines, and LEU being installed in Gyeongbu and Honam lines, although a train is controlled by the signaling information of the same train in the same location, the system is separately installed so that the same information is separately divided and transmitted at the each distinct system. Therefore, in the conventional ABS and LEU, there are a lot of duplicate installed compartments such as lamp detection and a power supply unit. Hence, we have a lot of problems: for maintenance, a lot of manpower and costs need to be invested and the overall manufacturing costs get higher, as well as the construction costs by duplicate. Therefore, this paper suggest design to develop an integrated electronic Block Control Unit by the integration of the currently used ABS, and communication and electronic technology. We are to monitor and manage the block systems in the corresponding station by integrating. And we are to transmit information together with LEU, which is an ATS wayside transmitter.