• 제목/요약/키워드: A drainage type tunnel

Search Result 17, Processing Time 0.023 seconds

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF

A study on thermal behavior of energy textile by performing in-situ thermal response test and numerical simulation (현장 열응답 시험과 수치해석을 통한 터널에 적용된 에너지 텍스타일의 열적 거동 연구)

  • Lee, Chul-Ho;Park, Moon-Seo;Min, Sun-Hong;Jeoung, Jae-Hyeung;Choi, Hang-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.325-335
    • /
    • 2010
  • A new geothermal energy source obtained from a tunnel structure has been studied in this paper. The geothermal energy is extracted through a textile-type ground heat exchanger named "Energy Textile" that is installed between a shotcrete layer and a guided drainage geotexitle. A test bed was constructed in an abandoned railway tunnel to verify the geothermal heat exchanger system performed by the energy textile. To evaluate the applicability of the energy textile, we measured the thermal conductivity of shotcrete and lining samples which were prepared in accordance with a common mixture design. An overall performance of the energy textile installed in the test bed was evaluated by carrying out a series of in-situ thermal response test. In addition, a 3-D finite volume analysis (FLUENT) was adopted to simulate the operation of the ground heat exchanger being encased in the energy textile with the consideration of the effect of the shotcrete and lining thermal conductivity.

  • PDF

Causual Analysis on Soil Loss of Safety Class Oryun Tunnel Area in Landslide Hazard Map (산사태 위험지도에서 안전등급지역인 오륜터널 일대의 토사유실 원인분석)

  • Kim, Tae Woo;Kang, In Joon;Choi, Hyun;Lee, Byung Gul
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.24 no.1
    • /
    • pp.17-24
    • /
    • 2016
  • At present, summer cloudburst and local torrential rainfalls have increased in this country, because of climatic change. Therefore, studies on prevention of soil loss have been actively proceeded, and Korea Forest Service has offered landslide hazard map. Landslide hazard map divides risks into 5 classes, by giving weight with 9 kinds of elements. In August 25 2014, soil loss occurred in the whole Oryun Tunnel, Geumjeong-gu, Busan, because of local torrential heavy rain. As a result of comparing with landslide hazard map, the area where soil loss occurred in reality is a safety zone on hazard map. Rainfall, soil map, geological map, forest type map, gradient, drainage network, watershed, basin shape, and efflux of the whole Oryun Tunnel where soil loss occurred were analyzed. As a result of an analysis, it is judged that soil, forest type, much efflux and peak discharge, degree of water network and basin shape of a place where landslide occurred are causes of soil loss. It is judged that efflux, peak discharge, and basin shape by the localized rainfall that is not considered in landslide hazard map of them are the biggest causes of soil loss. It is judged that efflux, peak discharge, degree of water network and basin shape by the rainfall are important through a study on a causual analysis on soil loss in the whole Oryun Tunnel where is one of occurrence area where a lot of propertywere lost by the record local torrential rainfalls. A localized torrential downpour should be prepared by considering these elements on judgement of a landslide hazard area.

Study on Thermal Performance of Energy Textile in Tunnel (터널 지열 활용을 위한 에너지 텍스타일의 열교환 성능 연구)

  • Lee, Chulho;Park, Sangwoo;Sohn, Byonghu;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.1907-1914
    • /
    • 2013
  • Textile-type heat exchangers installed on the tunnel walls for facilitating ground source heat pump systems, so called "energy textile", was installed in an abandoned railroad tunnel around Seocheon, South Korea. To evaluate thermal performance of the energy textile, a series of long-term monitoring was performed by artificially applying daily intermittent cooling and heating loads on the energy textile. In the course of the experimental measurement, the inlet and outlet fluid temperatures of the energy textile, pumping rate, temperature distribution in the ground, and air temperature inside the tunnel were continuously measured. From the long-term monitoring, the heat exchange rate was recorded as in the range of 57.6~143.5 W per one unit of the energy textile during heating operation and 362.3~558.4 W per one unit during cooling operation. In addition, the heat exchange rate of energy textile was highly sensitive to a change in air temperature inside the tunnel. The field measurements were verified by a 3D computational fluid dynamics analysis (FLUENT) with the consideration of air temperature variation inside the tunnel. The verified numerical model was used to evaluate parametrically the effect of drainage layer in the energy textile.

Study on Design Method of Tunnel-type Ammunition Storage Chamber (터널형 탄약고의 격실 설계 방법에 대한 연구)

  • Park, Sangwoo;Baek, Jangwoon;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.3
    • /
    • pp.279-287
    • /
    • 2020
  • Recently, the demand for underground-type ammunition storage facilities has increased. Comparing with a ground-type ammunition storage facility, the underground-type ammunition storage facility can decrease the standard of safety distance because fragment and blast wave can be locked in the rock formation. However, the absence of a design method on the underground-type ammunition storage chamber became a major setback for the construction promotion. In this study, the process for designing an overall configuration of the underground-type ammunition storage facility was provided. First, the determination method for configuration and number of the chamber was developed by performing the ammunition storage simulation. Then, a tunnel (i.e., transfer channel for vehicles) and designed chambers can be arranged on the basis of safety distance standard. The safety distance standard also should be considered for determining the location and the size of entrances because of the blast wave and fragment effect at the entrances when an explosion is generated inside a chamber. In addition, considerations on the design for the waterproof and the drainage of subsurface water were analyzed through construction cases. Finally, an example of designing underground-type ammunition storage chambers was provided in order to verify the developed design process.

The Effects of Improvement in Clay with High Moisture Contents Using the Filter Type Vacuum Consolidation Method (필터형 진공압밀공법을 이용한 고함수비 점토지반의 개량효과)

  • Oh, Sewook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.9
    • /
    • pp.55-60
    • /
    • 2010
  • This study are carried out to an lab model tests to develop a construction method that solidifies high-water content cohesive soil by using filter type drain and vacuum pressure, and that stabilizes the ground by accelerating horizontal drain at incline or in tunnel. The calibration chamber was designed within length of 1.5m and height of 50cm, and a drainage hole for preconsolidation, a switchgear and a piezometer were installed at the bottom part of the chamber. Also, a settlement gage was installed at the top part so that it can measure the settlement by time. The calibration ground basis was made in a form of thin layer from kaolinite and bentonite in 9:1 ratio stirred at 130% water content condition. A filter type drain was installed at chamber center and a vacuum pressure of 0.8MPa was applied through a hose linked to the cap at the top part, then, the settlement was measured in every 1 hour interval. After experiment, the moisture contents were measured by position, then, verified the increase of solidity of the ground through a triaxial compression test on undisturbed profile. After 11 days from the effective date, it was observed that the settlement decreased by maximum 35mm and the water content ratio was reduced by 38% at most while the solidity of the ground increased by 5~8 times greater than before preconsolidation.

The design of coffer dam utilized P.R.D. method (P.R.D. 공법을 활용한 가물막이 설계)

  • Park, Chal-Sook;Lee, Kyu-Tak;Yum, Kyung-Taek;Kim, Yoon-Ku;Kang, Bong-Gwon;Lee, Jae-Weon;Lim, Seok-San;Jeong, Ji-Yearl
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.869-887
    • /
    • 2008
  • Coffer dam for tunnel type spillway in inflow section of Dae-am dam was originally planned as 2 lines sheet piles with Water Zet method. But, the result of pilot test was caused of some problems that vibration during installation of pile could pollute water and water leakage could the lower part. So, sheet piles was not satisfactory for faculty of coffer dam. Structural instability of sheet pile system need to reinforcement. Characteristic of Dae-am dam was small reservoir capacity but wide drainage area, of which it was judgment that security of leakage and stability was difficult during excavation of inlet part. So, we consider that water curtain method utilized with in site pouring concrete pile method was designed at weir part of spillway. We were known about basement rock that geological boring was carried out in weir part. After taking a deep consideration, PRD method was accepted as a new method. Concrete pile by PRD was installed to below country rock. CJM method was carried out with PRD. After making concrete wall using Top-down method, earth anchors were installed for supporting it. According to the result of numerical analysis, as water level rises, wall is stable.

  • PDF