• Title/Summary/Keyword: 4D Building Information Model(4D BIM)

Search Result 60, Processing Time 0.024 seconds

BIM-Based Simulator for Rebar Placement

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.98-107
    • /
    • 2012
  • Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests a BIM-based simulator for rebar placement to determine the sequence with which rebar is placed into the form. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure, and labels the placement sequence of each individual bar or set of bars with ascending numbers. The placement sequence is then visualized using Autodesk Revit Structure 2012. This paper provides a short description of a field assessment and limits.

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

Development of Virtual Reality Multi Screen Simulation System based on BIM (BIM 기반의 가상현실 다면투사 시뮬레이션 시스템 구축)

  • Seo, Myoung-Bae;Park, Hyung-Jin
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.231-238
    • /
    • 2017
  • Using 3D based BIM(Building Information Modeling) enables a variety of construction simulations. The is no case to simulate BIM demonstration experiment on deeply immersed virtual reality environment in korea. This paper develops a multi screen based simulation system to enable 3D based immersed environment to diverse decision making and virtual construction simulation. In a developed simulation laboratory, we can carry out BIM drawing review, disaster evacuation simulation, constructability review on wild land and design urban planning using haptic device on 3-side space with 4K resolution . Also, It can review large amount of drawings without data conversion because of compatibility with BIM software.

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

Developing a Drawing Template for BIM software to Improve BIM-based Drawing Work Efficiency in the Construction Document Phase (실시설계단계 BIM 기반 도면 작업 효율 향상을 위한 도면화 템플릿 개발)

  • Kim, Yi-Je;Kim, In-Chie;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.98-109
    • /
    • 2020
  • Based on the prior research which developed the consistency review checklist of the BIM model and 2D drawing through the drawing analysis of the construction documents phase, the apparent limits of the existing template and the template development items were derived. As well, the BIM-based drawing templates of the construction documentation phase were developed and verified using ArchiCAD BIM software. The developed template was then applied to the actual project model in the construction documents phase, and, as a result, 50% of existing work elements could be utilized as templates. This is an increase of more than 30% over the existing template utilization elements, and it is analyzed to be effective in practical application and utilization. Based on the results of this study, if the BIM model construction criteria matching the drawing's utilization purpose are presented, while at the same time the BIM data interlocking and drawing template development studies are conducted, the utilization of BIM data can be maximized and additional drawing work can be minimized to increase the percentage of template utilization elements. In addition, it is believed that this can employed to address functional and institutional problems of BIM-based drawing and make a contribution to the activation of BIM.

Building Information Modeling of Caves (CaveBIM) in Jeju Island at a Specific Site below a Road at Jaeamcheon Lava Tube and at a Broader Scale for Hallim Town (제주도 한림 재암천굴과 도로 교차구간의 CaveBIM 구축)

  • An, Joon-Sang;Kim, Wooram;Baek, Yong;Kim, Jin-Hwan;Lee, Jong-Hyun
    • The Journal of Engineering Geology
    • /
    • v.32 no.4
    • /
    • pp.449-466
    • /
    • 2022
  • The establishment of a complete geological model that includes information about all the various components at a site (such as underground structures and the compositions of rock and soil underground space) is difficult, and geological modeling is a developing field. This study uses commercial software for the relatively easy composition of geological models. Our digital modeling process integrates a model of Jeju Island's 3D geological information, models of cave shapes, and information on the state of a road at the site's upper surface. Among the numerous natural caves that exist in Jeju Island, we studied the Jaeamcheon lava tube near Hallim town, and the selected site lies below a road. We developed a digital model by applying the principles of building information modeling (BIM) to the cave (CaveBIM). The digital model was compiled through gathering and integrating specific data: relevant processes include modeling the cave's shape using a laser scanner, 3D geological modeling using geological information and geophysical exploration data, and modeling the surrounding area using drones. This study developed a global-scale model of the Hallim region and a local-scale model of the Jaeamcheon cave. Cross-validation was performed when constructing the LSM, and the results were compared and analyzed.

Seismic Analysis Process of Steel Box girder Bridge based on BIM (강상자형 교량의 BIM기반 내진해석 프로세스)

  • Lee, Heon-Min;Lee, Jin-Kyoung;Yoo, Jae-Myoung;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.421-428
    • /
    • 2011
  • The communication of each others is lack between planing, design, construction and maintenance in domestic construction industry. This problem makes the omission of information and the loss of cost. So, the introduction of BIM can be the solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the seismic analysis process of steel box bridge for structural design of bridge construction project based on BIM. The additional process is needed for the purpose that structural data is inherent in the property information of 3D information model. This process has 3D modeling progress done by using the information decided in design phase. The design document of seismic analysis can be derived with the proposed process to steel box bridge.

DEVELOPMENT OF AN INTEGRATED MODEL OF 3D CAD OBJECT AND AUTOMATIC SCHEDULING PROCESS

  • Je-Seung Ryu;Kyung-Hwan Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1468-1473
    • /
    • 2009
  • Efficient communication of construction information has been critical for successful project performance. Building Information Modeling (BIM) has appeared as a tool for efficient communication. Through 3D CAD objects, it is possible to check interception and collisions of each object in advance. In addition, 4D simulation based on 3D objects integrated with time information makes it realize to go over scheduling and to perceive potential errors in scheduling. However, current scheduling simulation is still at a stage of animation due to manual integration of 3D objects and scheduling data. Accordingly, this study aims to develop an integrated model of 3D CAD objects that automatically creates scheduling information.

  • PDF

BIM and Thermographic Sensing: Reflecting the As-is Building Condition in Energy Analysis

  • Ham, Youngjib;Golparvar-Fard, Mani
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.4
    • /
    • pp.16-22
    • /
    • 2015
  • This paper presents an automated computer vision-based system to update BIM data by leveraging multi-modal visual data collected from existing buildings under inspection. Currently, visual inspections are conducted for building envelopes or mechanical systems, and auditors analyze energy-related contextual information to examine if their performance is maintained as expected by the design. By translating 3D surface thermal profiles into energy performance metrics such as actual R-values at point-level and by mapping such properties to the associated BIM elements using XML Document Object Model (DOM), the proposed method shortens the energy performance modeling gap between the architectural information in the as-designed BIM and the as-is building condition, which improve the reliability of building energy analysis. Several case studies were conducted to experimentally evaluate their impact on BIM-based energy analysis to calculate energy load. The experimental results on existing buildings show that (1) the point-level thermography-based thermal resistance measurement can be automatically matched with the associated BIM elements; and (2) their corresponding thermal properties are automatically updated in gbXML schema. This paper provides practitioners with insight to uncover the fundamentals of how multi-modal visual data can be used to improve the accuracy of building energy modeling for retrofit analysis. Open research challenges and lessons learned from real-world case studies are discussed in detail.

A Study on the Automation Process of BIM Library Creation of Air Handling Unit - Development of Revit API module for efficiency and uniformity of library creation - (공기조화기의 BIM 라이브러리 생성 자동화 프로세스에 관한 연구 - 라이브러리 생성의 효율성과 통일성 확보를 위한 Revit API 모듈 개발 -)

  • Kim, Han-Joo;Choi, Myung-Hwan;Kim, Jay-Jung
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.4
    • /
    • pp.75-82
    • /
    • 2018
  • BIM(Building Information Modeling) based design process can initiatively conduct a task through all phases from early design step to construction and maintenance step. Also BIM efficiently manage the building's energy by reflecting 3D design and construction life cycle. This paper proposes an efficient process to build AHU's BIM-based library. This study involves analyzing an AHU model for development of design module, and making the template model using the same 12 parts including the shapes of ducts, doors and frames. In consideration of each shape's direction and the status of existence, which are detailed shapes of parts upon making the template model, all the shapes of the AHU model can be expressed. By applying parametric modeling to the template model, a quick and precise modification and transformation can be conducted, thus the efficiency is enhanced. A user selects an AHU model from a 2D model selection program, and extracts shape information. The final AHU shape is completed through the automation work of unnecessary shape deletion by bringing the extracted shape information to the template model. This enables the user to build efficient AHU's BIM-based library, since the quick and precise modification and transformation of the template model are possibile, and all AHU model shapes can be expressed.