• 제목/요약/키워드: 3rd electric support action plan

검색결과 1건 처리시간 0.013초

발전소 증설이 환경, 지역사회 및 경제에 미치는 영향 - 제 3차 전력 수급계획에 의한 인천 지역의 화력발전소 증설을 중심으로 - (The Impact of Power Plants on the Environment and Region - Focus on Incheon Area according to the 3rd Electric Support Action Plan -)

  • 정창훈;;이희관
    • 환경영향평가
    • /
    • 제18권4호
    • /
    • pp.195-208
    • /
    • 2009
  • The power plant is well known to influence air pollution as well as emission of green house gas. Because of increasing demand on electricity, the government set up the electric support action plan every 2 years. In this research, the impacts of power plants on the environment and region was studied. The study was focused on the establishment of power plant in Incheon area based on the 3rd electric support action plan. According to the 3rd electric support action plan, almost 80% of power plant in metropolitan area is planned to be built in Incheon area. The main influences of establishment of power plant are emissions of $SO_x$, $NO_x$ and PM and exceed the allocated local industry emissions, which means the emission allocation of other industry is difficult. In additions, the power plant exhaust $CO_2$ much more than other types of fuel such as waterpower generation, atomic power station. Although several supports are given in local government, these cannot cover the whole cost due to establishment of power plant. Subsequently, this study suggest the additional policy based on local consideration is needed and the current electricity distribution system should be reconsidered fundamentally in the lang term.